Final Shortlisted Result Improvement into two-lane with paved shoulder/four-lane of NH-40 between Shillong to Dawki section including the construction of Dawki bridge Design length = 63.91 Km (Ch. 0.000 To Ch. 71.520 of NH-40 & Ch. 0.000 to Ch. 0.900

Sub Title
Final Shortlisted Result Improvement into two-lane with paved shoulder/four-lane of NH-40 between Shillong to Dawki section including the construction of Dawki bridge Design length = 63.91 Km (Ch. 0.000 To Ch. 71.520 of NH-40 & Ch. 0.000 to Ch. 0.900 of NH-44) (Package-I, II, IV & V) excluding pynursula bypass in Meghalaya under JICA loan assistance (2nd Phase) on Engineering, Procurement, Construction (EPC) Mode. Dated: 15-09-2020.
Upload file
Year
Tender Date