Sub Title
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 0.00 to km 36.460 (Package-I, II & III) of Kailashahar – Kurti Bridge section on NH 208 A to two lanes with paved shoulder (ii) Rehabilitation and up- gradation of road from km 0.000 to km 18.600 (Total length: 18.600 km) of Kumarghat-Kailashahar section on NH-208 to two lane with paved shoulder in the state f Tripura on EPC Basis. Dated: 20-07-2020.
Upload file
Year
Tender Date