241 |
RFP for Independent Engineer Services for 4 (Four) Laning and Greenfield alignment of Karimganj - Silchar section of NH-37 from Design chainage 0.000 (Near ISBT, Silchar bypass) to Km. 15.970 (Kalinagar Pt I on NH-37) in the state of Assam on HAM mode. Package –I (Length- 15.970 km) Assam on Hybrid Annuity Mode.
|
Assam |
10-06-2024 |
|
View Details |
242 |
RFP for Independent Engineer Services for Four Laning of Badarpur – Churaibari section ofNH-37 & NH-8 from Design chainage 38.600(End of proposed Badarpur Bypass) to Km.62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hybrid Annuity Mode
|
Assam |
10-06-2024 |
|
View Details |
243 |
RFP for Independent Engineer services for supervision of Construction ofConstruction of 4-lane of NH-8 form Design Ch. 62.800 (start of proposed Nilambazar/Cheragi Bypass) to Design Ch. 87.700 near Chandkhira Village on Silchar-Churaibari Pkg-5 in the state of Assam on Hybrid Annuity Mode
|
Assam |
10-06-2024 |
|
View Details |
244 |
RFP for Independent Engineer services for supervision of Construction of 4 (Four) Lane with Paved Shoulder for existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. Ch. 106.500Km) of Chandkhira village – Churaibari section of NH-8 in the state of Assam on Hybrid Annuity Mode” (Package: VI) (Project Length – 18.80 km)
|
Assam |
10-06-2024 |
|
View Details |
245 |
RFP for Widening & Upgradation to 4-lane with paved shoulder from km 16.700 (end of Seer Hamdan Bypass) to km 39.450 (start of Pahalgam Bypass), Package-II of Khanabal - Pahalgam - Chandanwadi - Baltal section of NH-501 in the UT of Jammu & Kashmir on EPC Mode - reg.
|
Union Territory of Jammu and Kashmir |
01-06-2024 |
|
View Details |
246 |
RFP for Widening & Upgradation to 4-lane with paved shoulder from km 0.000 (Near Sursunoo village on NH-44) to km 16.700 (End of Seer Hamdan Bypass), Package-IA of Khanabal- Pahalgam- Chandanwadi- Baltal section of NH-501 in the UT of Jammu & Kashmir on EPC mode - reg.
|
Union Territory of Jammu and Kashmir |
01-06-2024 |
|
View Details |
247 |
RFP for Consultancy Services as Authority’s Engineer for Supervision of “Construction of Automated Multilevel Parking (Puzzle & Rotary System) at (i)Tehsil Office, Haridwar (ii) Lalita Rao Park, Haridwar (iii) Magistrate Office, Haridwar (iv) Ranipur to Tibri Underpass, Haridwar (v) Tehsil Office, Roorkee (vi) At near National Hotel Tallital, Nainital including of Operation & Maintenance in the State of Uttarakhand on EPC Mode (as a deposit work of State Govt of Uttarakhand)”
|
Uttarakhand |
29-05-2024 |
|
View Details |
248 |
RFP for Balance Work Four-laning from Km. 123.840 to Km. 138.775 (Existing km 124.100 to 140.000) Excluding Dimapur & Kohima Bypass in the state of Nagaland on Item Rate & Work Order basis at the Risk & Cost of EPC Contractor
|
Nagaland |
28-05-2024 |
|
View Details |
249 |
RFP for Appointment of Safety Consultant for Construction, Operation & Maintenance of Z-Morh tunnel including approaches on Srinagar Sonamarg section connecting National Highway no. 1 in the UT of J&K on DBFOT annuity basis
|
Union Territory of Jammu and Kashmir |
24-05-2024 |
|
View Details |
250 |
RFP for Short Term Maintenance Contract of Peren - Dimapur Section on NH-129A from existing Km 120.500 to Km 123.380 Design Km 120.320 to Km 123.200 Length 2.88 Km in the state of Nagaland in FY 2024-25 Percentage Rate and work Order Basis 2nd Call.
|
Nagaland |
24-05-2024 |
|
View Details |