Non-Performer Archived

Sr. No Title Date of Declaration Document Date of withdrawal Document of Withdrawal
11 Declaration of Authority’s Engineer M/s Highway Engineering Consultant in Association with M/s LTelford Consulting Engineer Pvt. Ltd as Non Performer. 06-04-2023 Size: 3.12 MB 01-12-23 Size: 3.12 MB
12 Declaring M/s SIPL-RMN(JV) as Non-Performer. 22-05-2023 Size: 3.79 MB
13 Declaring the EPC Contractor M/s U.P. State Bridge Corporation Limited an Non Performer 09-02-2024 Size: 3.96 MB
14 Stay on the Non-performer Order of M/s UP State Bridge Corporation Limited dated 09.02.2024 upto 22nd Nov’2024 06-09-2024 Size: 1.45 MB 14-05-25 Size: 1.45 MB