| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Bid Due Date - (Revised) | Tender ID | View Details |
|---|---|---|---|---|---|---|
| 311 | Special & Emergent Repair through Short Term Maintenance Contract o n NH-08 in between Mungiakami to Champaknagar section for undertaking of protection works from Km 42 9+600 to Km 429+695, Km 426+80 0 to Km 426+833, Km 427+650 to K m 427+680, Km 434+300 to Km 434 +370, Km 444+900 to Km 444+930, Km 445+100 to Km 445+130, Km 4 48+300 to Km 448+310, Km 454+2 00 to Km 454+220 & Km 456+300 t o Km 456+315 along with construction of roadside embankment from Km 434+300 to Km 434+360 & Km 445+600 to Km 445+680 in the state of Tripura in the FY 2025-26 on percentage basis and work order basis | Tripura | 07-07-2025 | View Details | ||
| 312 | Special Repair work on NH-208 from Km 75.700 to Km 101.30 (Total Length – 25.600 Km) at various sections i.e, Srirampur to Khowai section at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis. | Tripura | 07-07-2025 | 2025_NHIDC_860294_1 | View Details | |
| 313 | Consultancy Services as Authority’s Engineer for supervision of works including Landslides Mitigation, Treatment and Road Maintenance Works in the highway section from km 368.00 to km 468.00 on NH-07 in the state of Uttarakhand | Uttarakhand | 07-07-2025 | View Details | ||
| 314 | Consultancy Services for preparation of Detailed Project Report for Consultancy Services for Preparation of Detailed Project Report for Construction of 4-Lane Access Controlled High Speed Corridor starting from Siliguri to Guwahati and connecting Jorabat in the States of West Bengal and Assam | West Bengal | 03-07-2025 | 07-08-2025 | View Details | |
| 315 | Widening/Imrpovement to 4 (Four) lane of Karimganj - Sutarkandi section of NH-37 from Design Chainage 0.020 (Start of proposed Karimganj Bypass from NH-8) to Km 14.380 (Sutarkandi) Package-VII in the state of Assam on HAM mode (Project length - 14.360 Km) | Assam | 28-06-2025 | View Details | ||
| 316 | Widening/lmprovement of 4 (Four) Lane from existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. CHh. 106.500 Km) of Chandkhira Village- Churaibari Section of NH-8 in the state of Assam on HAM mode Package-VI (Project Length -18.80 Km). | Assam | 28-06-2025 | View Details | ||
| 317 | Widening/Improvement to 4 (four) lane with paved Shoulder from existing road and Greenfield alignment (Design Ch 62.800 Km) to (Design ch. 87.700 Km) Start of proposed Nilambazar/Cheragi Bypass to Chandikhira of NH-8 in the state of Assam on HAM mode (Package-5) (Project length-24.900 Km) | Assam | 28-06-2025 | View Details | ||
| 318 | Widening/lmprovement of existing 2 lane to 4 (Four) lane and Greenfield alignment with Paved Shoulder of Silchar- Churaibari section of NH-37 & NH-8 from Design chainage Km. 38.600 (End point of proposed Badarpur Bypass) to Km. 62.800- (start point of proposed Nilambazar/ Cheragi Bypass) in the state of Assam on HAM mode-Package-lV | Assam | 28-06-2025 | View Details | ||
| 319 | Widening/ Improvement of existing 2 lane to 4 (four) laning of Karimganj- Silchar section of NH-37 from Design Chainage Ch 0+000 near Silchar ISBT to Design Ch. 15+970 near Kalinagar Pt I on NH-37 in the state of Assam on HAM mode (Package-1) | Assam | 28-06-2025 | View Details | ||
| 320 | Widening/ Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km (Design Ch. 21.850 Km to Ch.48.670 Km) for Package-2 of Bilasipara-Guwahati Road (NH-17) (Section: Near Mowatari, before Chapar Bypass to Tulungia (junction with NH-117)) in the state of Assam on HAM Mode | Assam | 28-06-2025 | View Details |