| 191 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Major Bridge along with its approaches connecting NH-10 with NH-510 near Singtam, development of its junction and identification & realignment from Km 0+000 to Km 3+074 (Singtam-Tarku) on NH-510 into 2 lane with paved shoulder configuration along with permanent mitigation measures for landslide/sinking/slip zones on existing section (2nd call)
|
Sikkim |
07-04-2025 |
|
925fa |
View Details |
| 192 |
HIRING OF COMMERCIAL VEHICLES FOR OFFICE USE OF NHIDCL 04 (FOUR) VEHICLES IN DISTRICT-LEH AND 05 (FIVE) VEHICLES IN DISTRICT-KARGIL
|
Ladakh |
07-04-2025 |
|
e914f |
View Details |
| 193 |
Special repair through Short-Term Maintenance Contract (STMC) for maintenance and repair of NH 06 from Km 118 at Kawnpui Bazar to Km 133 at Khamrang & Km 147.8 at Buichali Bridge to Km 159 at Sairang Junctionon single percentage rate basis under PMU-Kolasib in the state of MIZORAM\\\\\\\"
|
Mizoram |
05-04-2025 |
|
bbac3 |
View Details |
| 194 |
Special repair through Short-Term Maintenance Contract (STMC) for Maintenance and Repair of NH 06 from Km 70 at Bilkhawthlir to Km 95 at Kolasib on single percentage rate basis under PMU-Kolasib in the state of MIZORAM
|
Mizoram |
05-04-2025 |
|
130cd |
View Details |
| 195 |
Short Term maintenance for Restoration of Breach of formation on valley side & Slope Protection\r\nworks at Tangni-I (from Km. 454+650 to km. 454+800) and Tangni-II (from Km. 455+260 to Km.\r\n455+300) on NH-07 in the state of Uttarakhand under M&R.
|
Uttarakhand |
04-04-2025 |
|
4088e |
View Details |
| 196 |
Restoration of Highway Breach locations & Miscellaneous civil works in the work of "Construction & upgradation to 2-lane with paved shoulder from Km 430.000 to Km. 468.000 of Chamoli to Paini (Excluding Km 437.625 to Km 437.775, Km 458.900 to Km 459.475 and Km 464.425 to Km 464.525) of NH-07 in the State of Uttarakhand" under risk & cost of the EPC contractor.
|
Uttarakhand |
03-04-2025 |
|
20c7f |
View Details |
| 197 |
Short term maintenance for One time Improvement of Road Quality Work From Km- 25.400 to 51.000(Near Silkyara Bend to Barkot Tunnel Portal) On NH-134 in the State of Uttarakhand (Part-02).
|
Uttarakhand |
02-04-2025 |
|
aec60 |
View Details |
| 198 |
Maintenance of Existing Road section from Design Chainage Km 3.275 to Km 15.940 [Total Length = 12.665 (Pkg-I)] of NH-37 in the State of Manipur on Item Rate and work order basis to be carried out at the Risk & Cost of the EPC Contractor
|
Manipur |
02-04-2025 |
|
e9b07 |
View Details |
| 199 |
Engagement of consultant for Conducting the detailed survey using Road survey equipment’s from Km 21.100 to Km 101.300 (Total length: 80.200 km) i.e., Kailashahar - Khowai section of NH-208 (Package-I, II, III, IV & V) in the state of Tripura For Details
|
Tripura |
01-04-2025 |
|
dc61c |
View Details |
| 200 |
Protection work/Stabilization of sliding zone between km 65.79 to km 65.89 of NH-44A (NH-108) on Kanchanpur Vaghmun section near Tlakshi village under North Tripura District in the State of Tripura in F.Y 2024-25 on item rate basis
|
Tripura |
01-04-2025 |
|
a262d |
View Details |