31 |
Short Term Maintenance Contract (STMC) from km 55.000 to km 127.372 (Total length 72.372 km) on road Udaipur to Sabroom (NH-08) in the State of Tripura in the year 2025-26 on percentage basis and work order basis.
|
Tripura |
20-06-2025 |
|
View Details |
32 |
Consultancy Services as Authority’s Engineer for supervision of works including Specialized Slope protection works at various locations between Ch. 0+000 and Ch. 52+100 on NH-10 in the State of West Bengal
|
West Bengal |
19-06-2025 |
|
View Details |
33 |
Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of construction of greenfield alignment/ widening of existing carriageway to 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / sliding zones of section for Bhimtal to Almora via Khutani, Ramgarh, Kwarab, Peora and Vishvanath in the State of Uttarakhand
|
Uttarakhand |
19-06-2025 |
|
View Details |
34 |
Balance work of Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 27+150 (Golai Goan) to km 47+682 (Ledo) on Dibrugarh to Ledo section with proposed Margherita & Ledo Bypass (Brownfield and Green Field) (2-Lane+PS) of NH-38 in Tinsukia District in the State of Assam on EPC mode.(Package-5)
|
Assam |
17-06-2025 |
|
View Details |
35 |
Independent Engineer Services for “Construction to 2-Lane with Paved Shoulder of Tura Bypass between Existing km 57.500 of NH 127B (near km 85.800 of NH-217) (design chainage km 0+000) and ending at existing km 108.750 of NH-217 (design chainage km 29+030) (Length= 29.030km) on Hybrid Annuity Mode”
|
Meghalaya |
16-06-2025 |
|
View Details |
36 |
Short Term Maintenance Contract for Maintenance & Repair of 4-laning of Dimapur Kohima section on NH-29 from Km 123+840 to Km 138+775 in the state of Nagaland in FY: 2025-26 (Percentage Rate and work Order Basis)
|
Nagaland |
13-06-2025 |
|
View Details |
37 |
DIVERSION OF 400 KV D/C SILCHAR-IMPHAL (From Loc No. 64 to Loc No. 67), 400 KV SILCHAR-MELRIAT (From Loc No. 65&68, 70&72 and 122 &125) TRANSMISSION LINE OF POWER GRID ON SUPERVISSION BASIS FOR DEVELOPMENT OF ECONOMIC CORRIDORS, INTER CORRIDORS AND FEEDER ROUTES TO IMPROVE EFFICIENCY OF FREIGHT MOVEMENT BY NHIDCL (PACKAGE- 2) Silchar-V under PMU Silchar
|
Assam |
12-06-2025 |
|
View Details |
38 |
Urgent Road Repair Works along the Habitations from km 106.590 to km 108.553 on NH-4 in the UT of Andaman & Nicobar Islands at the Risk & Cost of existing EPC Contractor of balance work of Middle Strait Bridge, on % Rate & Work Order Basis, through Open Tender, in FY 2025-26. (2nd Call)
|
Andaman and Nicobar |
11-06-2025 |
|
View Details |
39 |
DIVERSION 132 KV D/C BADARPUR- KHLIEHRIAT TL (From Loc 12 to Loc 18) OF POWER GRID CORPORATION OF INDIA ON SUPERVISION BASIS TRANSMISSION LINE FOR DEVELOPMENT OF ECONOMIC CORRIDORS, INTER CORRIDORS AND FEEDER ROUTES TO IMPROVE EFFICIENCY OF FREIGHT MOVEMENT BY NHIDCL [PACKAGE- 3] BADARPUR BYPASS OF NHIDCL UNDER PMU SILCHAR.
|
Assam |
11-06-2025 |
|
View Details |
40 |
Balance Work of Rehabilitation and Up-gradation of section from Km 206.00 to Km 239.445 (Nimbutala to Austin Creek) of NH-04 in the Union Territory of Andaman & Nicobar Island on EPC Basis (Package-IV) at the Risk & Cost of existing EPC Contractor, on percentage Rate Basis in the FY 2025-26.
|
Andaman and Nicobar |
06-06-2025 |
|
View Details |