| Sr. No | Title | Date of Declaration | Document | Date of withdrawal | Document of Withdrawal |
|---|---|---|---|---|---|
| 11 | Declaration of Authority’s Engineer M/s Highway Engineering Consultant in Association with M/s LTelford Consulting Engineer Pvt. Ltd as Non Performer. | 06-04-2023 | 01-12-23 | ||
| 12 | Declaring M/s SIPL-RMN(JV) as Non-Performer. | 22-05-2023 | |||
| 13 | Declaring the EPC Contractor M/s U.P. State Bridge Corporation Limited an Non Performer | 09-02-2024 | |||
| 14 | Stay on the Non-performer Order of M/s UP State Bridge Corporation Limited dated 09.02.2024 upto 22nd Nov’2024 | 06-09-2024 | 14-05-25 |