Sorry, you need to enable JavaScript to visit this website.

Rishikesh to Mana

Project Project Staus
Construction and Upgradation of existing road to 2-lane with paved shoulder from Km. 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km. 379.100 to Km 380.275) of NH-07 under Chardham Pariyojna on EPC basis in the State of Uttarakhand. (Pkg-I) Ongoing
Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 399.000 to Km. 430.000 of Karanpyarag to Chamoli (Excluding Km 420.250 to Km 420.500 and Km 423.300 to km 423.650) of NH-07 under Chardham Pariyojna on EPC basis in the Ongoing
Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 430.000 to Km. 468.000 of Chamoli to Paini (Excluding Km 437.625 to Km 437.775, Km 458.900 to Km 459.475 and Km 464.425 to Km 464.525) of NH-07 under Chardham Pariyojna Ongoing
Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 379.100 to Km 380.275 of Gholtir landslide (Design Km 378.900 to Km 380.075) of NH-07 under Chardham Paryojna on EPC basis in the State of Uttarakhand (Design Length - 1.1
Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 458.900 to Km 459.475 of Patalganga Landslide (Design km 456.200 to Km 456.800) of NH-07 under Chardham Paryojna on EPC Mode in the State of Uttarakhand
Rehabilitation/treatment of landslide location with slope protection and drainage improvement at Nandprayag (Km 420+400), Maithana (Km 423+500), Birahi (Km 437+400), Gulabkoti (Km 464+400), on NH–58 (New NH-07) with proposed length of 200m, 350m, 100m &
Rehabilitation/Treatment of landslide location with slope protection and drainage improvement at Helang (km 468+200), Govind Ghat-II (km 497+000) and Govind Ghat-III (km 500+000) on NH-58 (new NH-07) with proposed length of 275m, 150m &150m respectively
Construction for Mitigation Measures of 10 Nos. of Landslides, 1 No. Sinking Zones and 1 no of minor Bridge from Km. 386.00 to Km 433.00 (65 Km Length) on NH-07 on EPC Mode in the State of Uttarakhand, (Package-I) Ongoing
Construction for Mitigation Measures of 05 Nos. of Landslides, 05 Nos. of Sinking Zones from Km. 433.00 to Km 450.00 (17 Km length) on NH-07 on EPC Mode in the State of Uttarakhand (Package-II) Ongoing
Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones and 1 no of Bridges from Km. 450.00 to Km 468.00 on NH-07 on EPC Mode in the State of Uttarakhand (Package-III) Ongoing