Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of construction of greenfield alignment/ widening of existing carriageway to 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / sliding zones of section for Bhimtal to Almora via Khutani, Ramgarh, Kwarab, Peora and Vishvanath in the State of Uttarakhand 2nd call

Basic Information

Descriptions State Tender ID
Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of construction of greenfield alignment/ widening of existing carriageway to 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / sliding zones of section for Bhimtal to Almora via Khutani, Ramgarh, Kwarab, Peora and Vishvanath in the State of Uttarakhand 2nd call Uttarakhand

Documents

NIT RFP DCA Schedules Drawings

Important Dates

Title Date Revised Date
NIT 07-11-2025
Pre-Bid Meeting 23-11-2025
Bid Due 01-12-2025
Technical Bid Opening 02-12-2025

Other Documents

Additional Documents