Construction of RCC Bridge over river Gomati at Km. 49.800 and over River Muhuri at Km.
Project Status
Ongoing
Construction of RCC Bridge over river Gomati at Km. 49.800 and over River Muhuri at Km.
Corridors: NH-08 Project status: Ongoing
Construction of RCC Bridge over river Gomati at Km. 49.800 and over River Muhuri at Km. 93.775 including approach road to the bridge on Agartala to Sabroom Road section of NH-08 (Old NH-44) in the State of Tripura on EPC basis