Kailashahar-Kurti Pkg-III (Balance work)

Rehabilitation and up-gradation of road from design km 25.250 to km 36.460 (Total length: 11.210k

Project Status
Ongoing

Corridors: Kailashahar-Kurti Bridge Section Project status: Ongoing

Rehabilitation and up-gradation of road from design km 25.250 to km 36.460 (Total length: 11.210km) of Kailashahar-Kurti Bridge section on NH-208A to 2- lane with paved shoulder in the state of Tripura on EPC basis (Package-III)