“Construction of two lane with hard shoulders of Pfutsero-Phek road on EPC basis from existing km
Project Status
Completed
“Construction of two lane with hard shoulders of Pfutsero-Phek road on EPC basis from existing km
Corridors: Phek-Pfutsero Project status: Completed
“Construction of two lane with hard shoulders of Pfutsero-Phek road on EPC basis from existing km 00.00 to km 19.990 (Design km 00.000 to 20.000) Design Length 20.000 (Package-I)”