Construction of Dimapur Bypass (Assam Portion) of 4/6 Lane pavement on EPC basis from existing Km
Project Status
Ongoing
Construction of Dimapur Bypass (Assam Portion) of 4/6 Lane pavement on EPC basis from existing Km
Corridors: Dimapur Kohima Project status: Ongoing
Construction of Dimapur Bypass (Assam Portion) of 4/6 Lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km)