Construction of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC basis from existi
Project Status
Terminated
Construction of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC basis from existi
Corridors: Changtongya - Longleng Road Project status: Terminated
Construction of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC basis from existing Km16.592 to Km29.530 [Design Km.18.779 to Km 33.428] (Design Length-14.649 km) (Package-II)