Sorry, you need to enable JavaScript to visit this website.

Changtongya - Longleng Road (Pkg-II)

Construction of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC basis from existi

Project Status
Terminated

Corridors: Changtongya - Longleng Road Project status: Terminated

Construction of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC basis from existing Km16.592 to Km29.530 [Design Km.18.779 to Km 33.428] (Design Length-14.649 km) (Package-II)