Construction of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC basis from existi
Project Status
Ongoing
Construction of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC basis from existi
Corridors: Changtongya - Longleng Road Project status: Ongoing
Construction of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC basis from existing Km0.00 to Km16.592 [Design Km 0.00 to Km.18.779 ] (Design Length-18.779km) (Package-I)