Construction of two-lane with hard shoulders of Chakabama-Zunheboto Road on EPC basis from existi
Project Status
Completed
Construction of two-lane with hard shoulders of Chakabama-Zunheboto Road on EPC basis from existi
Corridors: Chakabama-Zunheboto Project status: Completed
Construction of two-lane with hard shoulders of Chakabama-Zunheboto Road on EPC basis from existing Km 79.040 to Km 100.345 [Design Km 75.000 to Km 95.000] (Design Length- 20.00 Km) in the state of Nagaland under SARDP-NE (Package-IV)