Construction of two-lane with hard shoulders of Chakabama-Zunheboto Road on EPC basis from existi
Project Status
Completed
Construction of two-lane with hard shoulders of Chakabama-Zunheboto Road on EPC basis from existi
Corridors: Chakabama-Zunheboto Project status: Completed
Construction of two-lane with hard shoulders of Chakabama-Zunheboto Road on EPC basis from existing Km 0.00 to Km 25.760 [Design Km 0.000 to Km 25.000] (Design Length- 25.00 Km) in the state of Nagaland under SARDP-NE (Package-I)