Aizawl - Tuipang, Package - 4

Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements

Project Status
Ongoing

Corridors: Aizawl - Tuipang Project status: Ongoing

Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 166.00 to km 208.00 (Package-4) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on EPC mode with JICA loan assistance