Sr. No. Project Status Name of Project Length (Km) TPC (Rs. in Cr) Date of Award Appointed Date Cumulative Physical progress ( %) as Per PMIS Cumulative Financial progress (%) as Per PMIS Original Schedule Completion Date Likely Date of completion/ Actual Date of Completion Name of the Contractor Official Mail IDs of Contractor
1 Ongoing Construction of 4-Lane with paved shoulder Agartala bypass (Western side, length – 25.402 km) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in the state of Tripura on EPC basis under NH(O)-NE 25.40 2026.05 27-03-2023 09-03-2024 9 3 09-03-2027 09-03-2027 Dineshchandra R. Agarwal Infracon Pvt. Ltd. (DRAIPL) dra.agartala@draipl.com
2 Ongoing Improvement and Widening to 2-lane with paved shoulder of road from design Km 72.000 (Pati Chhari) to design Km 107.654 (Harina) (Total length 35.654 Km) on Teliamura to Harina section of NH 208 in the state of Tripura on EPC mode under JICA ODA Loan Phase –VI (Package-4) 35.65 726.90 12-02-2024 20-12-2024 4 20-12-2026 20-12-2026 Bhartia Infra Projects Ltd (BIPL) info@bhartiainfra.com, bipltrp.pkg4@gmail.com
3 Ongoing Improvement & widening of existing NH-08 to 4-lane with Paved Shoulder from Champak Nagar to Khayerpur section (design Km 242+500 to Km 261+610) in the state of Tripura on EPC basis under NH(O)-NE 19.11 920.66 15-03-2024 28-09-2024 25 23 28-09-2026 28-09-2026 New India Contractors & Developers Pvt. Ltd. tripuranh8@nicdpl.com
4 Ongoing Improvement and Widening to 2-lane with paved shoulder of road from existing Km 438.170 (Khowai Chowmuhani) to existing Km 439.410 (South Pulinpur) of NH-08 and from design Km 0.000 (South Pulinpur) to design Km 36.00 (near Rangamati) of NH 208 on Khowai – Teliamura- Harina section (Total length 37.24) in the state of Tripura on EPC mode under JICA ODA Loan Phase –VI (Package-2) 37.24 657.21 12-02-2024 02-09-2024 33 31 02-09-2026 02-09-2026 Anupam Nirman Pvt. Ltd.- Bhavya Construction (JV) bhavya.telimura@gmail.com
5 Ongoing Improvement and Widening to 2-lane with paved shoulder of road from design Km 36.000 (Rangamati) to design Km 72.000 (Pati Chhari) (Total length 36.000 Km) on Teliamura to Harina section of NH 208 in the state of Tripura on EPC mode under JICA ODA Loan Phase –VI (Package-3) 36.00 670.90 12-02-2024 02-09-2024 3 1 02-09-2026 02-09-2026 Rani Constructions Pvt. Ltd. hyd@ranigroup.com, nh208.p3@ranigroup.com
6 Ongoing Improvement and Widening to 2-lane with paved shoulder of road from Km 101.300 to km 127.319 (Total Length 26.019 Km) i.e. the Khowai –Teliamura-Amarpur-Harina-Sabroom section of NH 208 in the state of Tripura on EPC under JICA ODA Loan Phase –VI (Package-1) 26.02 431.78 12-02-2024 18-07-2024 35 28 17-07-2026 17-07-2026 Civtect India Pvt. Ltd. civtect@gmail.com
7 Ongoing Rehabilitation and up-gradation of road from design km 25.250 to km 36.460 (Total lengh: 11.210 km) of Kailashahar-Kurti Bridge section on NH-208A to 2-lane with paved shoulder on EPC basis under NH(O) (Package-III)- Balance Work 11.21 174.43 15-03-2024 01-09-2024 17 12 02-03-2026 02-03-2026 Brahmaputra Infrastructures Pvt. Ltd. guwahati@brahmaputragroup.com
8 Ongoing Rehabilitation and up-gradation of road from km 16.077 to km 43.935 (total length 27.858 km) of Lalchara-Kanchanpur section via Shivbari on NH-44A to 2 lane with paved shoulder in the state of Tripura on EPC Mode (Pkg-2) under BharatMala Pariyojana (Manu-Simlung -2) 27.86 456.88 23-03-2022 10-01-2023 50 48 09-01-2025 31-01-2026 Jugal Kishore Mahanta Infra works (JKM) - Keti Construction (JV) jkmho@jkminfra.net
9 Ongoing Rehabilitation and up-gradation of road from Km 66.845 to 85.125 (Total length: 18.280 Km) of Vanghmun-simlung section on NH-44A (PKG-4) on NH-44A to 2 -lane with Paved shoulder in the state of Tripura on EPC Mode under BharatMala Pariyojana (Manu-Simlung -4) 6.47 354.79 27-03-2021 25-06-2021 59 15 24-12-2022 31-12-2025 JSR Constructions Pvt Ltd - PRN Infratech, Engineers & Contractors (JV) admin@jsr.co.in
10 Ongoing Improvement and Widening to 2-lane with earthen/paved shoulder from Km 23 to Km 34.500 (11.5 Km) and overlay from Km 20.30 to Km 22.00 (1.7 Km) (Total Length = 13.2 Km) on Udaipur to Srimantapur section on NH-08 on EPC basis under NH(O)-NE 13.20 195.95 03-03-2023 29-05-2023 45 36 27-11-2024 30-11-2025 Satish Prasad spc.srimantapur@gmail.com
11 Ongoing Construction of 2 RCC Bridges over river Gomati at Km 49.800 and Muhuri at Km 93.775 including approach road to the bridge on Agartala to Sabroom Road section of NH-08 on EPC basis 1.88 86.54 13-08-2020 23-09-2020 63 61 23-03-2022 30-09-2025 Brijesh Agrawal erbrijesh123@yahoo.com
12 Ongoing Rehabilitation and up-gradation of road from km 19.300 to km 31.300 (Total length: 12.000km) of Agartala-Khowai section on NH-108B to 2- lane with paved shoulder on EPC basis under NH(O) (Package-II) 12.00 141.48 18-12-2023 01-03-2024 29 25 31-08-2025 31-08-2025 Sahu Construction sahu1222construction@gmail.com
13 Ongoing Improvement & widening to 2-lane with paved shoulder of road Kailashahar - Fultali section from Km 21.100 to Km 29.200 (Km 18.600 to Km 26.700) on NH-208 under JICA ODA Loan assistance (Phase-IV) (Pkg-1) 8.10 105.27 24-11-2020 29-12-2020 96 96 30-06-2022 31-07-2025 Sahu Construction spc.fultali@gmail.com
14 Completed Improvement/Widening to 2-Laning with paved shoulder of Udaipur– Sabroom Section from Km 55.000 to Km 128.712 of NH-44 (New NH-08) in the State of Tripura under SARDP-NE Phase “A’’ on EPC Basis 73.71 915.00 02-05-2014 31-10-2015 100 100 30-04-2018 Oriental Structural Engineers Pvt. Ltd
15 Completed Improvement and Widening to 2 lanes with paved shoulders of Jolaibari - Belonia (from km 0.000 to km 21.412) section of NH-108A in Tripura on EPC Mode under NH(O) 21.41 287.47 03-06-2020 15-07-2020 100 99 06-01-2022 Satish Prasad spc.jolaibari@gmail.com
16 Completed Rehabilitation & Upgradation of Road from Km 46.597 to Km 66.845 (Total length= 20.248 km) of Kanchanpur-Vanghmun section(PKG-3) on NH-44A to 2 -lane with Paved shoulder in the state of Tripura on EPC Mode under BharatMala Pariyojana (Manu-Simlung -3) 20.25 347.36 03-06-2020 20-07-2020 100 100 19-01-2022 Rajendra Singh Bhamboo Infra Pvt. Ltd. rsbipltripura@gmail.com
17 Completed Improvement/ Widening to 2-laning with Paved shoulder of Agartala- Udaipur Section of NH-44 (New NH-08) from Km 6.800 to km 55.00 in the state of Tripura under SARDP-NE Phase ‘A’ on EPC basis 48.20 649.00 31-10-2014 15-09-2015 100 100 14-03-2018 Krishna Mohan Construction (KMC) kmc_qs@rediffmail.com
18 Completed Improvement & widening to 2-lane with paved shoulder of road Bamanchara - Srirampur section from Km 63.700 to Km 75.700 under JICA ODA Loan assistance (Phase-IV) (Pkg-4) 12.00 171.50 24-11-2020 29-12-2020 100 99 30-06-2022 Sahu Construction spc.bamancherra@gmail.com
19 Completed Rehabilitation and up-gradation of road from km 0.000 to km 16.29 (Total Length: 16.29 km) of Manu-Lalchara Section on NH-44A to 2- lane with paved shoulder on EPC Mode (Pkg-1) (Manu-Simlung -I) 16.08 251.89 30-03-2020 15-07-2020 100 100 14-01-2022 Engineering Projects (INDIA) Ltd. (EPIL) epilmanupkg1@gmail.com
20 Completed Rehabilitation & Upgradation of Road from design Km 0.00 to Km 11.800 (Total length-11.800 km) of Kailashahar-Kurti Bridge section on NH-208A to 2-lane with Paved shoulder on EPC basis in Tripura under NH(O) (Package-I) 11.80 154.51 20-03-2020 15-07-2020 100 100 14-07-2022 ASC Infratech Pvt. Ltd. dkthakur@ascinfratech.com
21 Completed Improvement & widening to 2-lane with paved shoulder of road Fultali - Jurichhara section from Km 29.200 to Km 49.200 under JICA ODA Loan assistance (Phase-IV) (Pkg-2) 20.00 218.23 24-11-2020 31-12-2020 100 100 01-07-2022 Narendra Builders - Jeet Construction Co. (JV) nbjeetkumarghat@gmail.com
22 Completed Rehabilitation and up-gradation of raod from design km 31.300 to km 45.300 (Total length: 14.000km) of Agartala-Khowai section on NH-108B to 2- lane with paved shoulder on EPC basis under NH(O) (Package-III) 14.00 188.00 21-09-2020 22-10-2020 100 97 15-04-2022 A K Construction Co. akccagartalakhowai@gmail.com/akconstruction1@rediffmail.com
23 Completed Construction of Extra-dosed RCC Bridge (412 m) including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH-8 (old NH-44)
"Maitri Setu"
1.89 128.69 22-03-2017 27-10-2017 100 100 26-04-2020 Dineshchandra R. Agarwal Infracon Pvt. Ltd. (DRAIPL) extradosed.dra@gmail.com
24 Completed Improvement/strengthening to 2-lane with hard shoulder of Khayerpur-Amtali (Agartala) section from Ch. 0.00 Km to 12.900 Km of NH-8 in Tripura on EPC basis under NH(O) [Agartala Bypass] 12.90 147.06 20-03-2020 01-07-2020 100 100 01-07-2022 Civtect India Pvt. Ltd. civtectkhowai@gmail.com
25 Completed Rehabilitation & Upgradation of Road from Km 0.00 to Km 18.600 (Total length-18.600 km) of Kumarghat-Kailashahar section on NH-208 to 2-lane with Paved shoulder on EPC bais under NH(O) 18.60 302.03 03-06-2020 15-07-2020 100 99 13-01-2022 Satish Prasad spc.kumarghat@gmail.com
26 Completed Improvement & widening to 2-lane with paved shoulder of road Srirampur - Khowai section from Km 75.700 to Km 101.300 under JICA ODA Loan assistance (Phase-IV) (Pkg-5) 25.60 317.96 24-11-2020 30-12-2020 100 100 01-07-2022 Civtect India Pvt. Ltd. civtectkhowai@gmail.com
27 Completed Rehabilitation and up-gradation of road from design km 6.500 to km 19.300 (Total lengh: 12.800 Km) of Agartala - Khowai section on NH-108B to 2- lane with paved shoulder on EPC basis under NH(O) (Package-I) 12.80 210.54 30-03-2020 15-07-2020 100 100 15-07-2022 Shiva Buildtech Pvt. Ltd. shivabuildtech@gmail.com shivabuildtech.tripura@gmail.com
28 Completed Strengthening of Churaibari - Agartala section of NH-08 (74.876 Km) in Tripura on EPC basis under NH(O) 74.88 257.96 03-06-2020 24-07-2020 100 100 15-01-2022 Shiv Build India Pvt. Ltd. sbilcharubariagartalanh8@gmail.com
29 Completed Rehabilitation and up-gradation of road from design km 11.800 to km 25.250 (Total length: 13.450km) of Kailashahar-Kurti Bridge section on NH-208A to 2- lane with paved shoulder on EPC basis under NH(O) (Package-II) 13.45 208.74 30-03-2020 15-07-2020 100 100 14-07-2022 ASC Infratech Pvt. Ltd. kbplanning@ascinfratech.com;
30 Completed Improvement & widening to 2-lane with paved shoulder of road Jurichhara - Bamanchara section from Km 49.200 to Km 63.700 under JICA ODA Loan assistance (Phase-IV) (Pkg-3) 14.50 296.48 24-11-2020 01-01-2021 100 100 02-07-2022 J Infratech Limited (JIL)- Maan Builders (JV) jcipl.tripura@gmail.com