Sr. No. | Project Status | Name of Project | Length (Km) | TPC (Rs. in Cr) | Date of Award | Appointed Date | Cumulative Physical progress ( %) as Per PMIS | Cumulative Financial progress (%) as Per PMIS | Original Schedule Completion Date | Likely Date of completion/ Actual Date of Completion | Name of the Contractor | Official Mail IDs of Contractor |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Ongoing | Construction of 4-Lane with paved shoulder Agartala bypass (Western side, length – 25.402 km) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in the state of Tripura on EPC basis under NH(O)-NE | 25.40 | 2026.05 | 27-03-2023 | 09-03-2024 | 9 | 3 | 09-03-2027 | 09-03-2027 | Dineshchandra R. Agarwal Infracon Pvt. Ltd. (DRAIPL) | dra.agartala@draipl.com |
2 | Ongoing | Improvement and Widening to 2-lane with paved shoulder of road from design Km 72.000 (Pati Chhari) to design Km 107.654 (Harina) (Total length 35.654 Km) on Teliamura to Harina section of NH 208 in the state of Tripura on EPC mode under JICA ODA Loan Phase –VI (Package-4) | 35.65 | 726.90 | 12-02-2024 | 20-12-2024 | 4 | 20-12-2026 | 20-12-2026 | Bhartia Infra Projects Ltd (BIPL) | info@bhartiainfra.com, bipltrp.pkg4@gmail.com | |
3 | Ongoing | Improvement & widening of existing NH-08 to 4-lane with Paved Shoulder from Champak Nagar to Khayerpur section (design Km 242+500 to Km 261+610) in the state of Tripura on EPC basis under NH(O)-NE | 19.11 | 920.66 | 15-03-2024 | 28-09-2024 | 25 | 23 | 28-09-2026 | 28-09-2026 | New India Contractors & Developers Pvt. Ltd. | tripuranh8@nicdpl.com |
4 | Ongoing | Improvement and Widening to 2-lane with paved shoulder of road from existing Km 438.170 (Khowai Chowmuhani) to existing Km 439.410 (South Pulinpur) of NH-08 and from design Km 0.000 (South Pulinpur) to design Km 36.00 (near Rangamati) of NH 208 on Khowai – Teliamura- Harina section (Total length 37.24) in the state of Tripura on EPC mode under JICA ODA Loan Phase –VI (Package-2) | 37.24 | 657.21 | 12-02-2024 | 02-09-2024 | 33 | 31 | 02-09-2026 | 02-09-2026 | Anupam Nirman Pvt. Ltd.- Bhavya Construction (JV) | bhavya.telimura@gmail.com |
5 | Ongoing | Improvement and Widening to 2-lane with paved shoulder of road from design Km 36.000 (Rangamati) to design Km 72.000 (Pati Chhari) (Total length 36.000 Km) on Teliamura to Harina section of NH 208 in the state of Tripura on EPC mode under JICA ODA Loan Phase –VI (Package-3) | 36.00 | 670.90 | 12-02-2024 | 02-09-2024 | 3 | 1 | 02-09-2026 | 02-09-2026 | Rani Constructions Pvt. Ltd. | hyd@ranigroup.com, nh208.p3@ranigroup.com |
6 | Ongoing | Improvement and Widening to 2-lane with paved shoulder of road from Km 101.300 to km 127.319 (Total Length 26.019 Km) i.e. the Khowai –Teliamura-Amarpur-Harina-Sabroom section of NH 208 in the state of Tripura on EPC under JICA ODA Loan Phase –VI (Package-1) | 26.02 | 431.78 | 12-02-2024 | 18-07-2024 | 35 | 28 | 17-07-2026 | 17-07-2026 | Civtect India Pvt. Ltd. | civtect@gmail.com |
7 | Ongoing | Rehabilitation and up-gradation of road from design km 25.250 to km 36.460 (Total lengh: 11.210 km) of Kailashahar-Kurti Bridge section on NH-208A to 2-lane with paved shoulder on EPC basis under NH(O) (Package-III)- Balance Work | 11.21 | 174.43 | 15-03-2024 | 01-09-2024 | 17 | 12 | 02-03-2026 | 02-03-2026 | Brahmaputra Infrastructures Pvt. Ltd. | guwahati@brahmaputragroup.com |
8 | Ongoing | Rehabilitation and up-gradation of road from km 16.077 to km 43.935 (total length 27.858 km) of Lalchara-Kanchanpur section via Shivbari on NH-44A to 2 lane with paved shoulder in the state of Tripura on EPC Mode (Pkg-2) under BharatMala Pariyojana (Manu-Simlung -2) | 27.86 | 456.88 | 23-03-2022 | 10-01-2023 | 50 | 48 | 09-01-2025 | 31-01-2026 | Jugal Kishore Mahanta Infra works (JKM) - Keti Construction (JV) | jkmho@jkminfra.net |
9 | Ongoing | Rehabilitation and up-gradation of road from Km 66.845 to 85.125 (Total length: 18.280 Km) of Vanghmun-simlung section on NH-44A (PKG-4) on NH-44A to 2 -lane with Paved shoulder in the state of Tripura on EPC Mode under BharatMala Pariyojana (Manu-Simlung -4) | 6.47 | 354.79 | 27-03-2021 | 25-06-2021 | 59 | 15 | 24-12-2022 | 31-12-2025 | JSR Constructions Pvt Ltd - PRN Infratech, Engineers & Contractors (JV) | admin@jsr.co.in |
10 | Ongoing | Improvement and Widening to 2-lane with earthen/paved shoulder from Km 23 to Km 34.500 (11.5 Km) and overlay from Km 20.30 to Km 22.00 (1.7 Km) (Total Length = 13.2 Km) on Udaipur to Srimantapur section on NH-08 on EPC basis under NH(O)-NE | 13.20 | 195.95 | 03-03-2023 | 29-05-2023 | 45 | 36 | 27-11-2024 | 30-11-2025 | Satish Prasad | spc.srimantapur@gmail.com |
11 | Ongoing | Construction of 2 RCC Bridges over river Gomati at Km 49.800 and Muhuri at Km 93.775 including approach road to the bridge on Agartala to Sabroom Road section of NH-08 on EPC basis | 1.88 | 86.54 | 13-08-2020 | 23-09-2020 | 63 | 61 | 23-03-2022 | 30-09-2025 | Brijesh Agrawal | erbrijesh123@yahoo.com |
12 | Ongoing | Rehabilitation and up-gradation of road from km 19.300 to km 31.300 (Total length: 12.000km) of Agartala-Khowai section on NH-108B to 2- lane with paved shoulder on EPC basis under NH(O) (Package-II) | 12.00 | 141.48 | 18-12-2023 | 01-03-2024 | 29 | 25 | 31-08-2025 | 31-08-2025 | Sahu Construction | sahu1222construction@gmail.com |
13 | Ongoing | Improvement & widening to 2-lane with paved shoulder of road Kailashahar - Fultali section from Km 21.100 to Km 29.200 (Km 18.600 to Km 26.700) on NH-208 under JICA ODA Loan assistance (Phase-IV) (Pkg-1) | 8.10 | 105.27 | 24-11-2020 | 29-12-2020 | 96 | 96 | 30-06-2022 | 31-07-2025 | Sahu Construction | spc.fultali@gmail.com |
14 | Completed | Improvement/Widening to 2-Laning with paved shoulder of Udaipur– Sabroom Section from Km 55.000 to Km 128.712 of NH-44 (New NH-08) in the State of Tripura under SARDP-NE Phase “A’’ on EPC Basis | 73.71 | 915.00 | 02-05-2014 | 31-10-2015 | 100 | 100 | 30-04-2018 | Oriental Structural Engineers Pvt. Ltd | ||
15 | Completed | Improvement and Widening to 2 lanes with paved shoulders of Jolaibari - Belonia (from km 0.000 to km 21.412) section of NH-108A in Tripura on EPC Mode under NH(O) | 21.41 | 287.47 | 03-06-2020 | 15-07-2020 | 100 | 99 | 06-01-2022 | Satish Prasad | spc.jolaibari@gmail.com | |
16 | Completed | Rehabilitation & Upgradation of Road from Km 46.597 to Km 66.845 (Total length= 20.248 km) of Kanchanpur-Vanghmun section(PKG-3) on NH-44A to 2 -lane with Paved shoulder in the state of Tripura on EPC Mode under BharatMala Pariyojana (Manu-Simlung -3) | 20.25 | 347.36 | 03-06-2020 | 20-07-2020 | 100 | 100 | 19-01-2022 | Rajendra Singh Bhamboo Infra Pvt. Ltd. | rsbipltripura@gmail.com | |
17 | Completed | Improvement/ Widening to 2-laning with Paved shoulder of Agartala- Udaipur Section of NH-44 (New NH-08) from Km 6.800 to km 55.00 in the state of Tripura under SARDP-NE Phase ‘A’ on EPC basis | 48.20 | 649.00 | 31-10-2014 | 15-09-2015 | 100 | 100 | 14-03-2018 | Krishna Mohan Construction (KMC) | kmc_qs@rediffmail.com | |
18 | Completed | Improvement & widening to 2-lane with paved shoulder of road Bamanchara - Srirampur section from Km 63.700 to Km 75.700 under JICA ODA Loan assistance (Phase-IV) (Pkg-4) | 12.00 | 171.50 | 24-11-2020 | 29-12-2020 | 100 | 99 | 30-06-2022 | Sahu Construction | spc.bamancherra@gmail.com | |
19 | Completed | Rehabilitation and up-gradation of road from km 0.000 to km 16.29 (Total Length: 16.29 km) of Manu-Lalchara Section on NH-44A to 2- lane with paved shoulder on EPC Mode (Pkg-1) (Manu-Simlung -I) | 16.08 | 251.89 | 30-03-2020 | 15-07-2020 | 100 | 100 | 14-01-2022 | Engineering Projects (INDIA) Ltd. (EPIL) | epilmanupkg1@gmail.com | |
20 | Completed | Rehabilitation & Upgradation of Road from design Km 0.00 to Km 11.800 (Total length-11.800 km) of Kailashahar-Kurti Bridge section on NH-208A to 2-lane with Paved shoulder on EPC basis in Tripura under NH(O) (Package-I) | 11.80 | 154.51 | 20-03-2020 | 15-07-2020 | 100 | 100 | 14-07-2022 | ASC Infratech Pvt. Ltd. | dkthakur@ascinfratech.com | |
21 | Completed | Improvement & widening to 2-lane with paved shoulder of road Fultali - Jurichhara section from Km 29.200 to Km 49.200 under JICA ODA Loan assistance (Phase-IV) (Pkg-2) | 20.00 | 218.23 | 24-11-2020 | 31-12-2020 | 100 | 100 | 01-07-2022 | Narendra Builders - Jeet Construction Co. (JV) | nbjeetkumarghat@gmail.com | |
22 | Completed | Rehabilitation and up-gradation of raod from design km 31.300 to km 45.300 (Total length: 14.000km) of Agartala-Khowai section on NH-108B to 2- lane with paved shoulder on EPC basis under NH(O) (Package-III) | 14.00 | 188.00 | 21-09-2020 | 22-10-2020 | 100 | 97 | 15-04-2022 | A K Construction Co. | akccagartalakhowai@gmail.com/akconstruction1@rediffmail.com | |
23 | Completed | Construction of Extra-dosed RCC Bridge (412 m) including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH-8 (old NH-44) "Maitri Setu" |
1.89 | 128.69 | 22-03-2017 | 27-10-2017 | 100 | 100 | 26-04-2020 | Dineshchandra R. Agarwal Infracon Pvt. Ltd. (DRAIPL) | extradosed.dra@gmail.com | |
24 | Completed | Improvement/strengthening to 2-lane with hard shoulder of Khayerpur-Amtali (Agartala) section from Ch. 0.00 Km to 12.900 Km of NH-8 in Tripura on EPC basis under NH(O) [Agartala Bypass] | 12.90 | 147.06 | 20-03-2020 | 01-07-2020 | 100 | 100 | 01-07-2022 | Civtect India Pvt. Ltd. | civtectkhowai@gmail.com | |
25 | Completed | Rehabilitation & Upgradation of Road from Km 0.00 to Km 18.600 (Total length-18.600 km) of Kumarghat-Kailashahar section on NH-208 to 2-lane with Paved shoulder on EPC bais under NH(O) | 18.60 | 302.03 | 03-06-2020 | 15-07-2020 | 100 | 99 | 13-01-2022 | Satish Prasad | spc.kumarghat@gmail.com | |
26 | Completed | Improvement & widening to 2-lane with paved shoulder of road Srirampur - Khowai section from Km 75.700 to Km 101.300 under JICA ODA Loan assistance (Phase-IV) (Pkg-5) | 25.60 | 317.96 | 24-11-2020 | 30-12-2020 | 100 | 100 | 01-07-2022 | Civtect India Pvt. Ltd. | civtectkhowai@gmail.com | |
27 | Completed | Rehabilitation and up-gradation of road from design km 6.500 to km 19.300 (Total lengh: 12.800 Km) of Agartala - Khowai section on NH-108B to 2- lane with paved shoulder on EPC basis under NH(O) (Package-I) | 12.80 | 210.54 | 30-03-2020 | 15-07-2020 | 100 | 100 | 15-07-2022 | Shiva Buildtech Pvt. Ltd. | shivabuildtech@gmail.com shivabuildtech.tripura@gmail.com | |
28 | Completed | Strengthening of Churaibari - Agartala section of NH-08 (74.876 Km) in Tripura on EPC basis under NH(O) | 74.88 | 257.96 | 03-06-2020 | 24-07-2020 | 100 | 100 | 15-01-2022 | Shiv Build India Pvt. Ltd. | sbilcharubariagartalanh8@gmail.com | |
29 | Completed | Rehabilitation and up-gradation of road from design km 11.800 to km 25.250 (Total length: 13.450km) of Kailashahar-Kurti Bridge section on NH-208A to 2- lane with paved shoulder on EPC basis under NH(O) (Package-II) | 13.45 | 208.74 | 30-03-2020 | 15-07-2020 | 100 | 100 | 14-07-2022 | ASC Infratech Pvt. Ltd. | kbplanning@ascinfratech.com; | |
30 | Completed | Improvement & widening to 2-lane with paved shoulder of road Jurichhara - Bamanchara section from Km 49.200 to Km 63.700 under JICA ODA Loan assistance (Phase-IV) (Pkg-3) | 14.50 | 296.48 | 24-11-2020 | 01-01-2021 | 100 | 100 | 02-07-2022 | J Infratech Limited (JIL)- Maan Builders (JV) | jcipl.tripura@gmail.com |