Sr. No. Project Status Name of Project Length (Km) TPC (Rs. in Cr) Date of Award Appointed Date Cumulative Physical progress ( %) as Per PMIS Cumulative Financial progress (%) as Per PMIS Original Schedule Completion Date Likely Date of completion/ Actual Date of Completion Name of the Contractor Official Mail IDs of Contractor
1 Ongoing Construction of 2-laning with Paved/Hard Shoulder of Peren-Dimapur road section on NH-129A from design km 120.320 to design km 123.200 (Design length: 2.88 km in Peren town) in the State Of Nagaland on EPC Mode under NH(O) (Package-1A) 2.88 106.32 28-03-2025 07-06-2025 07-12-2026 07-12-2026 Affluent Enterprises & Services affluententerprise13@gmail.com
2 Ongoing Construction of 2-Lane with paved shoulder of Kohima-Bypass Road connecting NH-39(New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39(New NH-02) from design Km 0.00 to Km 10.500 in the State of Nagaland under SARDP-NE on EPC Mode (Pkg.- 1)-Balance work 10.50 350.88 05-09-2023 09-11-2023 17 13 08-11-2026 08-11-2026 Brand Eagles brandeaglestawang@gmail.com
3 Ongoing Construction of 2-Lane with paved shoulder of Kohima-Bypass Road connecting New NH-02 and New NH-29 from Design Km 10.500 to design Km 21.000 [Design Length- 10.500 km] including (TUNNEL of 500m at Ch. 11.000Km) in the state of Nagaland Under SARDP-NE on EPC Mode (Pkg.- 2) 10.50 277.44 25-09-2020 15-10-2020 68 63 15-10-2022 30-06-2026 Bharat Constructions (India) Pvt. Ltd. bciplkohima@gmail.com
4 Ongoing Construction of 2-lane with Paved shoulder of Kohima- Bypass Road Connecting NH-39(New NH-02), NH-150(New NH-02), NH-61(New NH-29), NH-39(New NH-02) from Design Km 32.00 to Design Km 43.454(Design Length-11.454 Km) in the State of Nagaland under SARDP-NE on EPC Mode(Package-IV) 11.45 202.36 14-08-2020 15-10-2020 33 28 17-04-2022 31-03-2026 Pele Khezhie pelekhezhie.p4@gmail.com
5 Ongoing Construction of 2-lane with Paved shoulder of Kohima-Bypass Road connecting NH- 39 (New NH-02), NH150(New NH-02), NH7-61 (New NH-29) and NH-39 (New NH-02) from Design km 21.000 to km 32.268 [Design length=11.268 km] in the state of Nagaland Under SARDP-NE on EPC Mode (Pkg.- 3) 11.27 342.29 18-01-2023 16-06-2023 34 31 15-06-2025 31-03-2026 Niraj Cement Structurals Ltd. projectkohima.niraj@gmail.com
6 Ongoing Widening to 2 Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-III (Design Chainage 69+875 Km to 106+816 Km) in the State of Nagaland on EPC mode under NH(O)-NE 36.94 497.18 08-02-2023 26-08-2023 66 62 25-02-2026 25-02-2026 New India Contractors & Developers Pvt. Ltd. - Bharat Construction Co. (JV) office@bcc-buildtech.com
7 Ongoing Construction of 2 Laning with Hard Shoulder of Peren - Dimapur section on NH-129A from Design Km 163.592 to Km 173.850 (Length - 10.258 km) in the state of Nagaland on EPC mode under NH(O)-TSP (Pkg - 4) 10.26 116.54 04-01-2024 24-02-2024 56 53 23-02-2026 23-02-2026 Vertex Construction vertexinfra417@gmail.com
8 Ongoing Widening to 2 Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-I (Design Chainage 0+000 Km to 34+795 Km) in the State of Nagaland on EPC mode under NH(O)-NE 34.80 430.24 23-03-2023 24-08-2023 59 54 23-02-2026 23-02-2026 Mayasheel Construction- JSP Projects Pvt. Ltd. (JV) mayasheelconstruction@gmail.com
9 Ongoing Widening to 2 Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH(O)-NE 35.08 442.54 08-02-2023 24-08-2023 28 23 23-02-2026 23-02-2026 Kantilal Khimjibhi Bhalala Project Pvt. Ltd. (KKB) kkbnagaland@gmail.com
10 Ongoing Construction of 2-lane with hard shoulder of Kohima - Jessami road on NH-29 (Old NH-150) from existing Km 30.474 (Near Kidwema road Chakahabama) to existing Km 53.220 (Near Kikruma Village) (Design Km 29.60 to Km 51.50) (Design length-21.90 Km) in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode under NH(O) (Package-II) -Balance work 21.90 355.79 10-10-2023 05-01-2024 16 14 04-01-2026 04-01-2026 Ratna Infrastructure Projects Pvt. Ltd. ho@ratnainfra.in
11 Ongoing Construction of 2 laning with Hard shoulder of Peren-Dimapur section on NH-129A from Design Km 146.208 to Km 163.592 (Length- 17.384 km) in the state of Nagaland on EPC mode under NH(O) (Pkg - 3) 17.38 199.02 20-03-2023 07-06-2023 63 59 06-06-2025 23-11-2025 AM Infrastructure Projects Pvt. Ltd.- RN Infra Projects Ltd. (JV) amiprojects16@gmail.com
12 Ongoing Balance work of Construction of 2-lane with hard shoulder of Kohima - Jessami road on NH-29 (old NH-150) from existing km 98.380 (near Chizami vill.) to km120.367 (Nagaland/Manipur Border) [Design km 95.700 to design km 117.200] [Design Length= 21.500 km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package-V) under NH(O) 21.50 330.80 22-09-2023 23-11-2023 90 80 21-11-2025 21-11-2025 Kaushal Sharma - Prachi Infra & Roads Pvt. Ltd. (JV) ks.jessami@gmail.com
13 Ongoing 4 Laning of Balance work of Dimapur — Kohima Road from design km 152.490 to km 166.700 (Existing km 156.000 to km 172.900) of NH-39 (new NH-29) Excluding Dimapur & Kohima Bypass on EPC mode under SARDP-NE (Package - III) 14.21 794.74 04-08-2023 29-09-2023 64 56 28-09-2025 28-09-2025 Brand Eagles brandeagles.nagaland@gmail.com
14 Ongoing Balance work for 2-lane with hard shoulder of Peren- Dimapur section on NH-129A from Design Km 126.775 to Km 146.208 (Length 19.433 Km) in the state of Nagaland on EPC mode under NH(O)-TSP (Pkg-2) 19.43 258.52 31-05-2023 10-09-2023 63 56 09-09-2025 09-09-2025 AM Infrastructure Projects Pvt. Ltd.- RN Infra Projects Ltd. (JV) amiprojects16@gmail.com
15 Ongoing Construction of 2-Lane with hard shoulders of Merangkong- Tamlu-Mon Road on EPC Basis from existing road Km. 76.640 to Km 98.065 (Design chainage Km. 63.800 to Km. 86.835) Design Length-23.035 Km in the state of Nagaland under SARDP-NE (PKG-IV) (Balance work) 23.04 323.98 09-06-2023 11-09-2023 60 59 10-09-2025 09-09-2025 S.S. Infrazone Private Limited - Shyama Contruction (JV) mtm4pm.ssiplscjv@gmail.com,
mtm4ssiplscjv@gmail.com,
shyamaconstruction0005@gmail.com,
ssinfrapvtltd@outlook.com,
16 Ongoing Construction of 2-lane with hard shoulders of Merangkong-Tamlu-Mon road (Wakching Twon portion) on EPC basis from existing Chainage Km 59+000 to Km 73+640 [Design Km. 59+000 to Km, 72+450] (Design length - 13.450 Km) under SARDP-NE (package-V) (Balance work) 13.45 161.73 19-07-2023 08-09-2023 73 72 07-09-2025 06-09-2025 Jayzee Constructions jayzeeconstructiondmp@gmail.com, jayzeeconstruction.dmp@gmail.com,
17 Ongoing Construction of 2-Lane with hard shoulders of Merangkong-Tamlu-Mon (MTM) Road from existing Km 20.456 to Km 41.065 (Design Km. 20 to Km. 40.0) (Design Length-20.000 Km) in the State of Nagaland under SARDP-NE Phase-A (Pkg-2) (Balance work) 20.00 215.79 09-06-2023 22-08-2023 80 79 21-08-2025 21-08-2025 A. Pongshi Phom- W. Chingkam Phom (JV) app.jv.wcp@gmail.com, yalim91@gmail.com,
18 Completed Construction of 2-Lane with Hard shoulders of Chakabama-Zunheboto (C-Z) Road from existing Km 25.760 to Km 52.370 [Design Km 25.000 to Km 50.000 in the state of Nagaland under SARDP-NE on EPC Mode (Package-II) 25.00 279.35 23-03-2018 20-05-2019 100 100 19-05-2022 Shivalaya Construction co. Pvt. Ltd. (SCCPL) sccpl.nagaland@gmail.com
19 Completed Balance work of Construction of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC basis from existing Km16.592 to Km29.530 [Design Km.18.779 to Km 33.428] (Design Length-14.649 km) in the State of Nagaland under NH(O) (Pkg-2) 13.00 184.74 02-11-2023 25-01-2024 99 99 24-01-2025 Shankar Agarwal shankaragarwaloffice@gmail.com
20 Completed Construction of 2-Lane with hard shoulders of Pfutsero- Phek (PP) Road from existing Km 40.090 to Km 65.300 ( Design Km 40.000 to Km 62.558) Design Length 22.558 Km in the state of Nagaland under SARDP-NE Phase-A on EPC mode (Package-III) 22.56 282.98 22-03-2018 15-11-2018 100 100 14-11-2021 Madhucon Projects Limited nseethaiah@madhucon.com
21 Completed Construction of 2-Lane with Hard shoulders of Chakabama-Zunheboto (C-Z) Road from existing Km.100.345 to Km.122.250 (Design Km.95.000 to Km.115.534) in the state of Nagaland under SARDP-NE Phase-A on EPC Mode (Package - V) 20.53 255.58 28-03-2018 20-12-2018 100 100 19-12-2021 Madhucon Projects Limited nseethaiah@madhucon.com
22 Completed 4 Laning of Dimapur Kohima Road from Design Km 138.775 to Km 152.490 (Existing Km 140.000 to
Km 156.000) in state of Nagaland under SARDP-NE on EPC basis (Package - II)
13.72 486.19 31-03-2016 03-08-2016 100 100 02-08-2019 Ramky Infratructure Ltd. - ECI Engineering & Constr. Co. Ltd. (JV) ramkyecinh39nagaland@gmail.com
23 Completed Construction of 2-Lane with hard shoulders of Pfutsero- Phek (PP) Road on EPC mode from existing Km. 0.000 to Km. 19.900 (Design Km. 0.000 to Km. 20.000) (Design Length - 20.00 Km) in the State of Nagaland under SARDP-NE Phase-A on EPC mode (Package-I) 20.00 237.72 22-03-2018 08-11-2018 100 100 08-11-2021 Kantilal Khimjibhi Bhalala Project Pvt. Ltd. (KKB) kkbprojects@gmail.com , kkbnagaland@gmail.com
24 Completed Construction of 2-lane with hard shoulder of Peren-Dimapur section on NH-129A from design Km109.494 to Km126.775 (Length=17.281) in the state of Nagaland on EPC mode under NH(O)-TSP (Pkg-1) 14.40 257.15 10-09-2020 20-10-2020 100 100 22-04-2022 Mayasheel Construction - JPS Projects Pvt. Ltd. (JV) mayasheelconstruction.nagaland@gmail.com
25 Completed Construction of 2-Lane with Hard shoulders of Chakabama-Zunheboto (C-Z) Road from Existing Km 52.370 to Km 79.040 (Design Km 50.000 to Km 75.000) in the state of Nagaland under SARDP-NE Phase-A on EPC mode (Package-III) 25.00 285.68 23-03-2018 05-09-2019 100 100 03-09-2022 Madhucon Projects Limited nseethaiah@madhucon.com
26 Completed Construction of 2-Lane with hard shoulders of Merangkong-Tamlu-Mon (MTM) Road from existing Km 41.065 to Km 60.345 (Design Km. 40.000 to Km. 59.000) (Design Length-19.000 Km) in the State of Nagaland under SARDP-NE Phase-A (Pkg-3) 19.00 272.89 28-03-2018 24-10-2019 100 100 22-10-2022 SSR Crest Engineers and Constructions Limited ssrcrest@gmail.com
27 Completed Construction of 4/6 Laning from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] (Total New Alignment length of 14.325 Km ) of Daboka -Dimapur Section (Dimapur Bypass) (Assam Portion) in the state of Assam under SARDP-NE 'Phase-A' on EPC mode
[1 No. Toll Plaza at ( Km 118+770 to Km 119+000)]
14.33 698.81 19-03-2018 26-11-2019 100 98 25-11-2022 Gawar - Singh (JV) consultants Pvt Ltd singhconst2002@gmail.com
28 Completed Construction of 2-lane with hard shoulder of Kohima - Jessami road on NH-29 (Old NH-150) from existing Km53.220 (Near Kikruma Village) to existing Km 76.320 (Near Mesulumi Village) (Design Km51.50 to Km74.20) (Design length-22.70 Km) in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode under NH(O) (Package-III) 22.70 365.42 23-03-2020 01-07-2020 100 100 30-06-2022 Sudhakara Infratech Pvt. Ltd. (SIPL) - R. Maheswara Naidu (RMN) infrastructures Ltd. (JV) sudhakarainfratech.kohima@gmail.com
29 Completed Construction of 2-Lane with Hard shoulders of Chakabama-Zunheboto (C-Z) Road from Existing Km 0.000 to Km 25.760 [Design Km 00.000 to design Km 25.000] (Design Length 25.00Km) in the state of Nagaland under SARDP-NE on EPC Mode (Package-I) 25.00 339.57 23-03-2018 03-07-2019 100 100 02-07-2022 Shivalaya Construction co. Pvt. Ltd. (SCCPL) sccpl.nagaland@gmail.com
30 Completed Construction of 2-Lane with Hard Shoulders of Merangkong-Tamlu-Mon Road on EPC basis from Existing km 0+00 to km 20+456 (Design km 0+00 to km 20+00) in the State of Nagaland under SARDP-NE Phase-A (Pkg-1) 20.00 215.12 23-03-2018 18-11-2018 100 100 17-11-2021 Keystone Infra Pvt. Ltd. qsnagaland@keystoneinfra.com
31 Completed Construction of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC basis from existing Km0.00 to Km16.592 [Design Km 0.00 to Km.18.779 ] in the State of Nagaland under NH(O) (Pkg-1) 17.68 278.95 02-03-2020 01-07-2020 100 100 30-06-2022 RK Infra Private Ltd (RKIPL) -Nithin Sai Construction (NSC) (JV) nitinsaicons@gmail.com
32 Completed Construction of 2- lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing Km 7.880 (near chedama Junction) to existing km 30.474 (Near Chakahabama) (Design km 7.88 to km 29.60) (Design length - 21.72 km) in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode under NH(O) (Package -I) 21.72 320.97 17-03-2020 01-07-2020 100 100 30-06-2022 RK Infra Private Ltd (RKIPL) -Nithin Sai Construction (NSC) (JV) kj.rkipl.nsc@gmail.com
33 Completed Construction of 2 lane with Hard shoulder from Design Chainage Km 283.000 to Km 325.440 (5- legged junction at Old Akegwo) to (Akash Bridge) of Akegwo- Jessami section of NH-202 in the State of Nagaland on EPC mode under NH(O)-NE (Package-I) [Nagaland Portion] 42.44 605.36 30-03-2022 23-06-2022 100 99 20-12-2024 Kantilal Khimjibhi Bhalala Project Pvt. Ltd. (KKB) - Y. N. Dhanani (YND) (JV) kkbnagaland@gmail.com
34 Completed Construction of 2-Lane with hard shoulders of Pfutsero- Phek (PP) Road on EPC basis from existing Km 19.900 to Km 40.090 ( Design Km 20.000 to Km 40.000) Design Length 20.000 Km in the state of Nagaland under SARDP-NE Phase-A on EPC mode (Package-II) 20.00 251.97 22-03-2018 15-11-2018 100 100 14-11-2021 Madhucon Projects Limited nseethaiah@madhucon.com
35 Completed Construction of 2-Lane with hard shoulders of Chakabama-Zunheboto (C-Z) Road from existing Km.79.040 to Km.100.345 (Design Km.75.000 to Km.95.000) in the state of Nagaland under SARDP-NE Phase-A on EPC Mode (Package - IV) 20.00 315.03 28-03-2018 13-12-2018 100 100 12-12-2021 Madhucon Projects Limited nseethaiah@madhucon.com
36 Completed Construction of 4/6 Laning from Km 132.375 to Km 153.058 (Total New Alignment length of 20.683 Km ) of Daboka-Dimapur Section (Dimapur Bypass) (Nagaland Portion) of NH-36 & 39 in the State of Nagaland on EPC basis under Phase –A of SARDP-NE 20.65 688.12 28-03-2017 05-09-2017 100 100 04-09-2020 Simplex Infrastructures Ltd. simplexkolkata@simplexinfra.net
37 Completed Construction of 2-lane with hard shoulder of Kohima - Jessami road on NH 29 (old NH 150) from existing km 76.320 (near Mesulumi Vill.) to existing Km98.380 (near Chizami Vill.) [ Design Km 74.200 to design Km 95.700][Design Length= 21.50 km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package IV) 21.50 330.78 30-03-2020 01-07-2020 100 100 31-12-2021 Keystone Infra Pvt. Ltd. kohima-jessami@keystoneinfra.com