Sr. No. | Project Status | Name of Project | Length (Km) | TPC (Rs. in Cr) | Date of Award | Appointed Date | Cumulative Physical progress ( %) as Per PMIS | Cumulative Financial progress (%) as Per PMIS | Original Schedule Completion Date | Likely Date of completion/ Actual Date of Completion | Name of the Contractor | Official Mail IDs of Contractor |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Ongoing | 2-laning of Zorinpui - Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode under NH(O)-NE, stretch of IMBR | 28.24 | 781.85 | 23-02-2023 | 06-12-2024 | 1 | 06-12-2026 | 06-12-2026 | RDS Project Ltd | bimal.bhadula@rdsproject.com delhi@rdsproject.com | |
2 | Ongoing | Construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 0.000 to Km 37.420 of NH-302 in Mizoram under Bharatmala Pariyojana on EPC mode [Pkg-A] | 37.42 | 698.45 | 30-03-2021 | 30-06-2021 | 64 | 59 | 30-12-2022 | 30-06-2026 | SRK Constructions and Projects Pvt. Ltd. | srkhyd501@gmail.com |
3 | Ongoing | Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 74.950 of NH-302 in Mizoram under Bharatmala Pariyojana on EPC mode [Pkg-B] | 37.53 | 740.58 | 31-03-2021 | 10-07-2021 | 61 | 52 | 09-01-2023 | 30-06-2026 | SRK Constructions and Projects Pvt. Ltd. | srkhyd501@gmail.com |
4 | Ongoing | Up-gradation to 2-lane with paved shoulders of Ngopa - Pawlrang section of NH 102B of Aizawl - Imphal Economic Corridor from Existing Chainage km 32.796 to km 72.030 [Design Chainage km 31.280 to km 68.170] in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NH(O)-NE (Package-2) Keifang- Tuivai Pkg-2 | 36.89 | 523.78 | 27-02-2023 | 01-09-2023 | 89 | 85 | 22-02-2025 | 31-12-2025 | Mehta Construction Co.- Heera Ram Godara (JV) | mehtaconst09@gmail.com |
5 | Ongoing | Up-gradation to 2 lane with paved shoutders of Pawlrang - Rulchawm section- of NH-102B of Aizawl - Imphal Economic Corridor from Existing Chainage km 72.030 to km 104.129 including 2.459 km re-alignment section from Tuivai River to Rulchawm connecting km 48.150 of NH-6 [Design Chainage km 68.170 to km 98.579] in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NH(O)-NE (Package-3) (Keifang- Tuivai Pkg-3) | 30.41 | 500.88 | 25-03-2022 | 15-11-2023 | 75 | 73 | 08-05-2025 | 31-12-2025 | Dhariwal Buildtech Ltd. | skc.hisar@rediffmail.com, dbl.hisar@rediffmail.com |
6 | Ongoing | Construction of 2-L with hard shoulder of Hnathial Bypass (Pkg-2) Start near Km.166.965 and End near 174.980 on Aizawl-Tuipang section of NH-54 under JICA ODA Loan assistance (Phase-II) | 7.00 | 113.58 | 31-07-2020 | 01-10-2020 | 94 | 81 | 03-04-2022 | 31-07-2025 | Mathiyan Construction Pvt. Ltd. | mathiyan_mzn@rediffmail.com |
7 | Ongoing | Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 166.00 to km 208.00 (Package-4) on Aizawl-Tuipang section under JICA ODA Loan assistance (Phase-I) | 42.53 | 789.05 | 13-02-2019 | 25-10-2019 | 100 | 95 | 24-04-2023 | 30-06-2025 | ABCI Infrastructures Pvt. Ltd. | klbaid@abciinfra.com |
8 | Completed | Rehabilitation and Up-gradation to 2 lane with paved shoulders of Kwalkulh-Khawzawl road (lnternational Corridor) of NH-6 from Design Chainage Km 72.350 to Km 84.800 (Package-2) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode | 12.45 | 233.25 | 31-03-2021 | 25-06-2021 | 100 | 97 | 25-12-2022 | Dwarakamai Constructions Pvt. Ltd. | dmcpvtltd.2277@gmail.com | |
9 | Awarded, not Appointed | 4-Laning of Sethawn - N. Kawnpui section (Package-6) of NH-6 from Existing Chainage km 107+850 to km 126+315 (Design Chainage km 95+500 to km 111+850) on Silchar-Vairengte-Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NH(O)-NE Vairengte - Sairang Pkg-6 |
16.35 | 595.65 | 29-03-2023 | Pappu Prasad | pprasad.mizoram@gmail.com | |||||
10 | Awarded, not Appointed | Construction of 2-lane Aizawl Bypass from km 15.200 to km 34.500 (Package-3) on Sairang - Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode under NH(O)-NE | 19.30 | 720.72 | 06-03-2023 | Dhariwal Buildtech Ltd. | skc.hisar@rediffmail.com, dbl.hisar@rediffmail.com | |||||
11 | Completed | Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 125.00 (Serchhip) to km 166.00 (Package-3) on Aizawl-Tuipang section under JICA ODA Loan assistance (Phase-I) | 40.20 | 785.65 | 13-02-2019 | 25-10-2019 | 98 | 95 | 24-04-2023 | Bhartia Infra Projects Ltd (BIPL) - ABCI Infrastructures Private Limited (JV) | info@bhartiainfra.com | |
12 | Completed | Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 339.00 to km 380.00 (Siaha) (Package-8) on Aizawl-Tuipang section under JICA ODA Loan assistance (Phase-I) | 39.90 | 637.06 | 13-02-2019 | 16-03-2020 | 100 | 92 | 15-09-2023 | Bhartia Infra Projects Ltd (BIPL) - ABCI Infrastructures Private Limited (JV) | info@bhartiainfra.com | |
13 | Completed | Rehabilitation and Up-gradation to 2-lane with paved shoulders of Rulchawm-Dulte section (Economic Corridor) of NH-6 from Existing chainage Km 50+360 (Rulchawm) to Km 69+015 (Dulte) (Design Chainage Km 45+040 to Km 62+200)(Pkg-IV) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode (Seling-Dulte - IV) | 17.16 | 253.41 | 31-03-2020 | 01-07-2020 | 100 | 100 | 30-06-2022 | Anusha Projects Pvt. Ltd. | anushaprojects@gmail.com | |
14 | Awarded, not Appointed | 4-Laning of chhimluang-Kolasib from section (pkg-4) of NH-306 & NH-6 existing chainage km 59+700 to km 86+000 (design chainage km 61+000 to km 77+500) on Silchar-vairengte-sairang road in the state of Mizoram under Bharatmala Pariyojna on EPC mode under NH(O)-NE Vairengte - Sairang Pkg-4 |
16.50 | 561.91 | 28-01-2022 | Shiwalay Infra Projects Pvt. Ltd. | office@shiwalay.in | |||||
15 | Awarded, not Appointed | Construction of 2-lane Aizawl Bypass from km 0.000 to km 10.600 (Package-1) on Sairang - Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode under NH(O)-NE | 10.60 | 329.70 | 14-03-2023 | BRN Infrastructures Pvt. Ltd. | brninfrastructurre@gmail.com | |||||
16 | Completed | Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 8.00 (Seling) to km 65.00 (Package-1) on Aizawl-Tuipang section under JICA ODA Loan assistance (Phase-I) | 56.96 | 1286.35 | 25-11-2019 | 24-01-2020 | 99 | 95 | 25-07-2023 | Gawar Construction Ltd. - Shivalaya Construction co. Pvt. Ltd. (SCCPL) (JV) | gawar.scc@gmail.com | |
17 | Completed | Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 250.00 (Lunglei) to km 298.00 (Package-6) on Aizawl-Tuipang section under JICA ODA Loan assistance (Phase-I) | 45.56 | 906.76 | 08-03-2019 | 16-12-2019 | 98 | 94 | 16-06-2023 | ABCI Infrastructures Pvt. Ltd.-Bhartia Infra Projects Ltd (BIPL) (JV) | klbaid@abciinfra.com | |
18 | Completed | Construction of 2-L with hard shoulder of Lawngtlai Bypass (Pkg-3) on Aizawl-Tuipang section of NH-54 under JICA ODA Loan assistance (Phase-II) | 2.30 | 58.84 | 29-10-2020 | 20-11-2020 | 100 | 96 | 23-05-2022 | David Zohmachhuana | davidzohmachhuana@gmail.com | |
19 | Completed | Rehabilitation and Up gradation to 2-lane with paved shoulder of Keifang Section (Economic Corridor) of NH-06 from Existing Chainage Km 15+000 (Keifang ) to Km 30+050 (Keifang) Design Chainage Km 13+510 to Km 27+400 (Pkg – II ) in the State of Mizoram under Bharatmala Pariyojna on EPC Mode (Seling-Dulte - II) | 13.89 | 216.49 | 31-03-2020 | 01-07-2020 | 100 | 100 | 30-06-2022 | NG Projects Ltd. | ngplmizoram@gmail.com | |
20 | Completed | Up-gradation to 2 lane with paved shoulders of Khawzawl-Champhai road (lnternational Corridor) of NH-6 from Design Chainage Km 84.800 to Km 111.580 (Package-3) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode | 26.78 | 674.71 | 31-03-2021 | 25-06-2021 | 100 | 99 | 25-06-2023 | RKC Infrabuilt Pvt. Ltd. - Shri Balaji Construction Company [RKCIPL- SBCC] (JV) | bd@rkc.co.in | |
21 | Awarded, not Appointed | Construction of 4-Laning of N. Kawnpui (N. Mualvum) –Mualkhang via Khamrang Village section (Package-7) of NH-6 from Existing Chainage km 127+200 to km 142+000 (Design Chainage km 111+850 to km 123+400) on Silchar - Vairengte - Sairang road in the State of Mizoram on EPC mode under NH(O)-NE | 11.55 | 866.32 | 16-12-2024 | Shri Balaji Construction Company (SBCC) | sbc_dungarpur@yahoo.com | |||||
22 | Completed | Construction of 2nos. bypass as 2-L with hard shoulder of Chhiathlang bypass (of 2.571km) from 89.000 to 91.200 & Serchhip Bypass (of 11.829km) from 96.200 to 105.820 (Pkg-1) on Aizawl-Tuipang section of NH-54 under JICA ODA Loan assistance (Phase-II) on EPC Mode | 14.40 | 247.25 | 30-09-2020 | 15-10-2020 | 100 | 100 | 15-10-2022 | Kram Infracon Pvt. Ltd.(KIPL) - Vijay Kumar Mishra Constr. Pvt. Ltd. (VKMCPL) (JV) | info@kram.co.in, navin.mittal@kram.co.in |
|
23 | Completed | Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte-Kwalkulh road (International Corridor) of NH-6 from Design Chainage Km 54.400 to Km 72.350 (Package-1) in the state of Mizoram under Bharatmala Pariyojna on EPC Mode | 17.95 | 318.92 | 31-03-2021 | 25-06-2021 | 100 | 98 | 25-12-2022 | Dhariwal Buildtech Ltd. | skc.hisar@rediffmail.com dbl.hisar@rediffmail.com |
|
24 | Awarded, not Appointed | 4-Laning of Kolasib - Sethawn section (Package-5) of NH-6 from Existing Chainage km 86+000 to km 107+850 (Design Chainage km 77+500 to km 95+500) on silchar - vairengte - sairang road under Bharatmala Pariyojna on EPC mode under NH(O)-NE (Vairengte - Sairang Pkg-5) | 18.00 | 720.40 | 25-03-2022 | Rajendra Singh Kiledar Construction Company (RSK) - MLN (JV) | rsk-mln-jv@mlnprojects.in | |||||
25 | Awarded, not Appointed | Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 on Sarrang - Phaibawk section of NH-6 in the State of Mizoram on EPC Mode under NH(O)-NE (Package-2) | 4.60 | 1313.28 | 15-03-2024 | IRCON International Ltd. | gmbd@ircon.org | |||||
26 | Completed | Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 65.00 to km 125.00 (Serchhip) (Package-2) on Aizawl-Tuipang section under JICA ODA Loan assistance (Phase-I) on EPC Mode | 50.87 | 988.23 | 08-03-2019 | 23-12-2019 | 100 | 100 | 23-06-2023 | Gammon India Ltd. | manigammon@gmail.com arun.dalvi@gammonengineers.com info@kram.co.in |
|
27 | Completed | Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 (Package-7) on Aizawl-Tuipang section under JICA ODA Loan assistance (Phase-I) | 39.12 | 750.32 | 21-09-2020 | 01-10-2020 | 100 | 98 | 01-04-2024 | Power Mech Projects Ltd.- SRC Infra Developers Pvt. Ltd. (JV) | muralikrishna@powermech.net | |
28 | Completed | Up-gradation to 2-lane with paved shoulders of Khawkawn (from Bridge across River Tuivai) - Ngopa section of NH-102B of Aizawl - Imphal Economic Corridor from Existing Chainage km 0.000 to km 32.796 [Design Chainage km 0.000 to km 31.280] in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NH(O)-NE (Package-1) | 31.28 | 492.94 | 02-09-2021 | 26-11-2021 | 100 | 100 | 20-05-2023 | B R Goyal Infrastructure Ltd. | technical@brginfra.com | |
29 | Completed | Rehabilitation and Up gradation to 2-lane with paved shoulder of Keifang Section (Economic Corridor) of NH-06 from Existing Chainage Km 30+050 (Keifang) to Km 50+360 (Keifang), Design Chainage Km 27+400 to Km 45+040 ( Pkg – III ) in the State of Mizoram under Bharatmala Pariyojna on EPC Mode (Seling-Dulte - III) | 17.64 | 331.17 | 31-03-2020 | 01-07-2020 | 94 | 88 | 30-06-2022 | NG Projects Ltd. | pradeepreddygvv@gmail.com | |
30 | Awarded, not Appointed | 4-Laning of Vairengte - Chhimluang section (Package-3) of NH-306 from Existing Chainage km 43+000 to Km 59+700 (Design Chainage km 46+000 to km 60+850) on Silchar - Vairengte- Sairang road in the State of Mizoram under Bharatmala Pariyojna under NH(O)-NE (Package-1&2 in Assam state) |
14.85 | 491.39 | 27-01-2022 | Dhatarwal Construction Company Pvt. Ltd. | dtw.cons@gmail.com | |||||
31 | Awarded, not Appointed | Construction of 4-Laning of West Serawlg-Sairang section of NH-6 from Existing Chainage km 142+000 to km 158+900 (Design Chainage km 123+400 to km 136+260) on Silchar - Vairengte - Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NH(O)-NE (Package-8) | 12.86 | 875.79 | 05-12-2024 | Dhatarwal Construction Co. | dtw.cons@gmail.com | |||||
32 | Completed | Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 208.00 to km 250.00 (Lunglei) (Package-5) on Aizawl-Tuipang section under JICA ODA Loan assistance (Phase-I) | 33.80 | 688.25 | 13-02-2019 | 25-10-2019 | 95 | 94 | 24-04-2023 | ABCI Infrastructures Pvt. Ltd. | silchar@abciinfra.com | |
33 | Completed | Rehabilitation & Up-gradation to 2-Lane with paved shoulders of Seling-Keifang section (Economic corridor) of NH-06 From existing chainage KM 0.000 to KM 15.000(Design chainage KM 0.000 to KM 13.510) (Package 1) In the state of Mizoram Under Bharatmala Pariyojna on EPC Mode | 13.51 | 219.33 | 31-03-2020 | 01-07-2020 | 97 | 95 | 30-06-2022 | GVV Construction Pvt. Ltd. | pradeepreddygvv@gmail.com |