Sr. No. | Project Status | Name of Project | Length (Km) | TPC (Rs. in Cr) | Date of Award | Appointed Date | Cumulative Physical progress ( %) as Per PMIS | Cumulative Financial progress (%) as Per PMIS | Original Schedule Completion Date | Likely Date of completion/ Actual Date of Completion | Name of the Contractor | Official Mail IDs of Contractor |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Ongoing | Widening/Improvement to 2 lane with earthen shoulder of Choithar to Marrem Khullen section of NH-202 of Imphal Ukhrul Jessami Economic Corridor from Design Chainage km 53.110 to km 95.700 in the State of Manipur on EPC mode under Bharatmala Pariyojana, under NH(O)-NE (Package-5) | 42.59 | 564.05 | 31-03-2023 | 01-04-2025 | 31-03-2027 | 31-03-2027 | S S Builders | Appointed date not yet declared | ||
2 | Ongoing | Widening/Improvement to 2 lane with earthen shoulder of Marrem Khullen to Jessami section of NH-202 of Imphal - Ukhrul - Jessami Economic Corridor from Design Chainage km 95.700 to km 140.180 in the State of Manipur on EPC mode under Bharatmala Pariyojana under NH(O)-NE (Package-6) | 44.48 | 554.66 | 31-03-2023 | 08-12-2024 | 15 | 10 | 07-12-2026 | 07-12-2026 | HVS Construction Materials Pvt. Ltd. | hvs_construction@rediffmail.com |
3 | Ongoing | Widening/Improvement of existing 2-lane to 4-Lane Divided Highway from Kuraopokpi to Sekmai section of Imphal-Kohima Road (Design Ch.: km 287.00 to 297.700) of NH-39 (New NH-02) in state of Manipur on EPC mode (Pkg-5A) | 10.70 | 228.97 | 16-12-2022 | 26-02-2025 | 10 | 27-08-2026 | 27-08-2026 | Allone Infra Pvt. Ltd. | prabhjot.singh@alloneinfra.com | |
4 | Ongoing | Widening/Improvement to 2 Lane with earthen shoulder of Jessami to Laynen bridge (Nagaland border) section of NH-29 of Imphal -Ukhrul - Jessami Economic Corridor from km 0.000 to km 11.009 in the State of Manipur on EPC mode under Bharatmala Pariyojana, under NH(O)-NE (Package-7) | 11.01 | 164.89 | 31-03-2023 | 24-12-2024 | 10 | 9 | 26-06-2026 | 26-06-2026 | HVS Construction Materials Pvt. Ltd. | hvs_construction@rediffmail.com |
5 | Ongoing | Improvement/Up-gradation of existing 2-lane to 4-Lane Divided Highway from Daili to Kuraopokpi section of Imphal-Kohima Road (Design Ch.: km 274.610 to 287.00 ) of NH-39 (New NH-02) in state of Manipur on EPC mode (Pkg-4B) | 12.39 | 268.98 | 16-12-2022 | 05-12-2024 | 18 | 8 | 05-06-2026 | 05-06-2026 | A K Shivhare Infrastructure Pvt. Ltd. | aks.nh102a@gmail.com |
6 | Ongoing | Widening to 2-Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Existing Chainage Km 15.946 to Km 33.395) (Total length=17.180 Km) in the State of Manipur on (EPC) mode (PKG-2) - Balance Works & Rectification works | 17.18 | 195.14 | 07-02-2025 | 18-03-2025 | 12 | 6 | 18-03-2026 | 31-03-2026 | SCONS Infrastructure Pvt. Ltd. | sipl@sconsinfra.in; |
7 | Ongoing | Widening to 2 lane with Paved shoulder of lmphal to Jiribam section of NH-37 from Design Ch. from km 169+570 Near Nungkao vlllage under Tamenglong District to km 205+974 near Jiribam Bridge under Jiribam district under NH(O)-NE (PKG-7) | 36.40 | 760.16 | 19-01-2023 | 30-12-2023 | 63 | 60 | 28-12-2025 | 31-03-2026 | P.D. Agrawal Infrastructure Ltd. -Apex Structure Pvt Ltd. (JV) | pdagrawal_indore@yahoo.com, apexcompany2009@yahoo.in |
8 | Ongoing | Widening to 2 Lane with Paved shoulder of lmphal to Jiribam section of NH-37 from Design Ch. from Km 101+280 Near Khongsang Village to Km 131+280 near Puilon (Kambiron) Village on EPC Mode in Manipur (PKG-5) | 30.00 | 410.68 | 25-03-2022 | 09-11-2022 | 70 | 69 | 12-05-2024 | 31-03-2026 | Aarpee Infraprojects Pvt. Ltd. | imphaljiribampkg5@gmail.com |
9 | Ongoing | Construction of of 2 -Lane with paved shoulders road from Tamenglong-Tousem-Lisang-Mahur Road (NH-137) starting near Dialong Village from km 10.000 at Dialong to km 31.430 near Old Tamenglong , near Barak River on EPC Mode (Package-2) | 21.43 | 483.87 | 20-07-2021 | 15-09-2021 | 93 | 90 | 16-03-2023 | 31-03-2026 | J Infratech Limited (JIL) - Niraj Cement Structurals Ltd. (JV) | jcipl.manipur@gmail.com |
10 | Ongoing | Construction of 2-laning with Hard shoulder of Ukhrul Tolloi - Tadubi section of NH-102A from Design Chainage km 9+450 to km 50+850 in the State of Manipur on EPC mode under NH(O)-NE (Package-2) | 41.40 | 578.98 | 15-03-2023 | 01-03-2024 | 71 | 68 | 01-03-2026 | 01-03-2026 | S S Builders - Ganpati Builders (JV) | ganpatibuilders0082@gmail.com |
11 | Ongoing | Construction of 2 -Lane with paved shoulders road from Tamenglong to Mahur (NH-137) in Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu on EPC Mode (Package 5) | 26.45 | 477.86 | 23-08-2021 | 18-11-2021 | 85 | 82 | 19-05-2023 | 31-01-2026 | Shri Swami Samarth Engineers Ltd. | sssel.manipurpkg5@gmail.com |
12 | Ongoing | Widening to 2 Lane with Paved shoulder of lmphal to Jiribam section of NH-37 from Design Ch. from km 131.280 to km 169.570 (PKG-6) on EPC mode under NH(O)-TSP | 38.29 | 504.76 | 31-03-2022 | 07-02-2023 | 78 | 75 | 06-02-2025 | 31-12-2025 | Sarjan Infracon Pvt. Ltd. | info@sarjaninfra.com |
13 | Ongoing | Widening/Improvement to 2-lane with earthen shoulder of Yaingangpokpi - Finch corner road section of NH-202 from Km 16.900 to Km 30.970 of NH-202 in the state of Manipur on EPC mode (Package-2) | 14.07 | 186.86 | 28-03-2020 | 01-07-2020 | 68 | 66 | 30-06-2022 | 31-12-2025 | Varaha Infra Limited | varaha.imphal@gmail.com |
14 | Ongoing | Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km (Existing Chainage km 67.496 to km 103.557) on EPC Mode in Manipur (PKG-4) | 35.17 | 579.63 | 23-08-2021 | 27-06-2022 | 73 | 69 | 29-12-2023 | 31-12-2025 | BLA Projects Private Limited - G P Projects Ltd. (JV) | nh37.pkg4@gpprojects.n |
15 | Ongoing | Construction of 2 -Lane with paved shoulders road from Tamenglong to Mahur (NH-137) starting from km 80.630 near Mandeu to km 96.870 near Jiri River on EPC Mode (Package-6) (Manipur portion) | 16.24 | 311.18 | 10-09-2021 | 19-11-2021 | 84 | 81 | 20-05-2023 | 31-12-2025 | B R Goyal Infrastructure Ltd. | tamenglongmahurpkg6@gmail.com |
16 | Ongoing | Improvement of existing road to 2 laning with Hard Shoulders of Maram -Peren section (Package-1A, length- 22.340Km) from Design Chainage 0.000 km to 22.340 km on NH-129A in the State of Manipur on EPC mode | 22.34 | 226.32 | 05-02-2021 | 21-06-2021 | 74 | 70 | 22-12-2022 | 31-12-2025 | CSR Infratech India Pvt. Ltd.- Raam Infratech India Pvt. Ltd. (JV) | csrinfratechindia@gmail.com |
17 | Ongoing | Improvement/Up-gradation of existing 2-lane to 4-Lane Divided Highway from Taphou Kuki to Daili section of Imphal-Kohima Road (Design Ch.: km 262.175 to 274.610) of NH-39 (New NH-02) in state of Manipur on EPC mode (Pkg-4A) | 12.44 | 379.39 | 31-08-2020 | 15-10-2020 | 71 | 60 | 18-04-2022 | 31-12-2025 | Lekcon Infrastructure Pvt. Ltd. - R.S.V. constructions Pvt. Ltd. (JV) | civil@lekconinfra.com |
18 | Ongoing | Widening/Improvement to 2-lane with earthen shoulder of Yaingangpokpi - Finch corner road section of NH-202 from Km 0.000 to Km 16.900 of NH-202 in the state of Manipur on EPC mode (Package-1) | 16.90 | 224.44 | 28-03-2020 | 01-07-2020 | 58 | 56 | 30-06-2022 | 31-12-2025 | Varaha Infra Limited | varaha.imphal@gmail.com |
19 | Ongoing | Widening to 2-lane with Hard shoulder of Churachandpur to Tuivai Section of NH-102B from Design Chainage 69.875 Km to 121.769 Km in the State of Manipur on EPC mode (Pkg-3) | 51.89 | 673.27 | 14-07-2021 | 25-08-2021 | 81 | 79 | 24-08-2023 | 09-12-2025 | M & S Co. | msco2008@gmail.com |
20 | Ongoing | Construction of 2 -Lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 31.430 at Old Tamenglong to km 43.480 ending near Phelong on EPC Mode (Package-3) | 12.05 | 234.08 | 26-03-2021 | 21-06-2021 | 93 | 89 | 20-12-2022 | 30-11-2025 | Kalyan Toll Infrastructure Ltd. | tamenglongmahurpkg3@gmail.com |
21 | Ongoing | Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 33.000 km to 66.390 Km (Existing Chainage from km 33.395 to km 67.496) on EPC Mode in Manipur (PKG-3) | 33.16 | 467.00 | 15-07-2021 | 15-09-2021 | 80 | 76 | 19-03-2023 | 31-10-2025 | Mehta Construction Co. - Ganpati Builders (JV) | mehtaganpatijv@gmail.com |
22 | Ongoing | Widening/Improvement of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilakuthi section of Imphal-Kohima Road (Design Chainage from Km 297+700 to Km 308+729) of NH-39 (New NH-02) in state of Manipur on EPC mode (Pkg-5B) | 11.03 | 211.70 | 27-03-2021 | 20-07-2021 | 71 | 60 | 21-01-2023 | 31-10-2025 | NSC Projects Pvt. Ltd | nscmanipu07@gmail.com |
23 | Ongoing | Construction of 2-laning with Hard shoulder road of Ukhrul - Tolloi - Tadubi section of NH-102A from Design Chainage 50.850 km to 81.870 km in the State of Manipur on EPC mode under NH(O)-TSP (Package -3) | 31.02 | 315.56 | 16-12-2022 | 23-07-2023 | 89 | 88 | 20-01-2025 | 31-10-2025 | Satish Aggarwal & Co. | nh102a.pkg03@gmail.com |
24 | Ongoing | Strengthening of Ukhrul to Choithar section of NH-202 from existing km 50+520 to km 59+236 (Design Chainage km 45+600 to km 54+212) Length-8.612 km in the State of Manipur on EPC mode under NH(O)-NE (Package-4) | 8.61 | 26.25 | 15-03-2024 | 01-07-2024 | 22 | 13 | 30-06-2025 | 31-10-2025 | Vertex Construction | Vertexmnp2022@gmail.com |
25 | Ongoing | Construction of 2-laning with Hard shoulder road of Ukhrul - Tolloi - Tadubi section of NH-102A from Design Chainage 81.870 km to 105.825 km in the State of Manipur on EPC mode under NH(O)-TSP(Package -4) | 23.96 | 310.76 | 27-08-2021 | 27-08-2022 | 97 | 94 | 28-02-2024 | 30-10-2025 | A K Shivhare Infrastructure Pvt. Ltd. | aks.nh102a@gmail.com |
26 | Ongoing | Widening to 2-lane with Hard shoulder of Churachandpur to Tuivai Section from Km 48.587 to Km 69.875 in the State of Manipur on EPC mode under NH(O) (Package-II B) | 21.28 | 365.53 | 30-06-2020 | 05-08-2020 | 78 | 76 | 04-08-2022 | 20-10-2025 | Bharat Vanijya Eastern Pvt. Ltd.(BVEPL) | bharatvanijyaimphalbranch@gmail.com |
27 | Ongoing | Widening to 2 -Lane with Paved shoulder of Imphal-Khongsang-Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length=12.665 Km) (PKG-1) | 12.67 | 139.38 | 30-03-2021 | 01-07-2021 | 67 | 55 | 02-01-2023 | 30-09-2025 | Avantika Contractor (I) Ltd. | sriavantikaimphal21@gmail.com |
28 | Ongoing | Widening to 2-lane with Hard shoulder of Churachandpur to Tuivai Section of NH-102B from km32.835 to km48.587 in the State of Manipur on EPC mode under NH(O) (Pkg- IIA) | 15.75 | 232.99 | 31-03-2020 | 01-07-2020 | 91 | 90 | 30-06-2022 | 30-09-2025 | Bharat Vanijya Eastern Pvt. Ltd.(BVEPL) | bharatvanijyaimphalbranch@gmail.com |
29 | Ongoing | Widening to 2-lane with Hard shoulder of Churachandpur to Tuivai Section of NH-102B from km13.747 to km32.835 in the State of Manipur on EPC mode under NH(O) (Pkg- IB) | 19.09 | 241.52 | 31-03-2020 | 01-07-2020 | 87 | 85 | 30-06-2022 | 30-09-2025 | RSM Infra Projects | rsminfraprojects@gmail.com |
30 | Completed | Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-2B, length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 on NH-129A in the State of Manipur on EPC mode | 18.16 | 232.63 | 12-02-2021 | 21-06-2021 | 100 | 100 | 22-12-2022 | Satya Builders | pm.sanjaysingh@satyagroupindia.in | |
31 | Completed | Improvement / Widening To 2 Laning of Stretch from Khongsang to Tamenglong (Design length= 37.974 Km) of NH-137 in the state of Manipur on EPC mode under SARDP-NE | 37.97 | 471.04 | 08-03-2019 | 01-08-2019 | 100 | 100 | 31-07-2022 | Shivalaya Construction co. Pvt. Ltd. (SCCPL) | scc.mn296@gmail.com | |
32 | Completed | Construction of Moreh Bypass to 2-lane with Paved shoulder from km 421.950 to 425.411 of NH-39 (New NH-102) on (AH-01) near Indo-Myanmar border in state of Manipur on EPC mode under NH(O) | 2.31 | 68.14 | 27-03-2020 | 01-07-2020 | 100 | 98 | 31-12-2021 | L.K. & Sons | kadamjitl@gmail.com | |
33 | Completed | Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-1B, length- 17.660 km) from Design Chainage 22.340 km to 40.000 km on NH-129A in the State of Manipur on EPC mode | 17.66 | 188.36 | 05-02-2021 | 21-06-2021 | 100 | 97 | 22-12-2022 | CSR Infratech India Pvt. Ltd.- Raam Infratech India Pvt. Ltd. (JV) | csrinfratechindia@gmail.com | |
34 | Completed | Widening and Improvement to 2-Lane with paved shoulders of Imphal-Moreh section of NH-39 (New NH-102) on (AH-01) from Km 395.680 to Km 406.000 in state of Manipur on EPC mode (Package-III) | 9.85 | 259.31 | 22-03-2021 | 21-06-2021 | 100 | 97 | 21-12-2022 | Dwarakamai Constructions Pvt. Ltd. | dmc.nsc.impkg3@gmail.com | |
35 | Completed | Construction of 2 laning with hard shoulder road of Akash bridge - Jessami section of NH-202 in Nagaland- Manipur from design Ch. 325.440 km to 340.160 km in the State of Manipur on EPC mode under NH(O)-NE (Pkg-II) (Manipur portion) | 14.72 | 152.11 | 21-06-2022 | 20-02-2023 | 100 | 98 | 19-02-2025 | HVS Construction Materials Pvt. Ltd. | hvs_construction@rediffmail.com | |
36 | Completed | Improvement of existing road to 2 lanning with Hard Shoulders of Maram Peren section (Package-III, length - 34.494 km) from Design Chainage km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC mode under NH(O)-TSP | 34.49 | 467.41 | 27-08-2021 | 26-11-2021 | 100 | 98 | 25-11-2023 | New India Contractors & Developers Pvt. Ltd. - Bharat Construction Co. (JV) | bccjv3121@gmail.com | |
37 | Completed | Construction and Maintenance of : (i) 154m span steel superstructure Bridge at km 145.090 over river Barak & (ii) 122m span steel superstructure Bridge at km 189.800 over river Makru and Approaches of both the Bridges to be constructed is 1595m (Total Length 1.870Km) on Jiribam-Barak road on NH-53 (New NH-37) in Manipur on EPC mode | 1.87 | 141.14 | 02-12-2016 | 27-04-2017 | 100 | 100 | 24-04-2020 | Bhartia Infra Projects Ltd (BIPL) | info@bhartiainfra.com | |
38 | Completed | Widening to 2-lane with Hard shoulder of Churachandpur to Tuivai Section of NH 102B from km 0.000 to km 13.747 in the State of Manipur on EPC mode under NH(O) (Pkg- I A) | 13.75 | 151.32 | 31-03-2020 | 01-07-2020 | 100 | 100 | 30-06-2022 | Krishna Construction Co. | kccnh102b@gmail.com | |
39 | Completed | Improvement/Strengtening to 2-lane with hard shoulder of Pallel-Chandel section of NH-102C (Km 0.000 to Km 18.292) in state of Mnaipur on EPC basis under NH(O) | 18.00 | 107.72 | 27-03-2020 | 01-07-2020 | 100 | 100 | 01-07-2022 | Krishna Construction Co. | kccnh102c@gmail.com | |
40 | Completed | Construction of 2 -Lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Package-1) | 10.00 | 185.80 | 19-07-2021 | 15-09-2021 | 100 | 98 | 16-03-2023 | Roadridge Developers Pvt. Ltd. - Sunshine Overseas Pvt. Ltd. (JV) |
rdplsopljvpkg1@gmail.com | |
41 | Completed | 4- Laning of Imphal – Moreh Section of NH-39 (New NH-102) on (AH-01) from Km 330.000 to Km 350.000 (design Km 349.555) (Package-I) on EPC mode by ADB fund under SASEC Tranche-2 | 19.56 | 820.56 | 05-09-2019 | 01-06-2020 | 100 | 100 | 31-05-2023 | GR Infra Projects ltd | planning.immo@grinfra.com | |
42 | Completed | Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-2A, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 km on NH-129A in the State of Manipur on EPC mode | 16.84 | 204.58 | 07-07-2021 | 15-09-2021 | 100 | 100 | 19-03-2023 | Heera Ram Godara - Dudi & Company (JV) | heeraramgodara@gmail.com | |
43 | Completed | Construction of 2 -Lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 43.480 at Phelong to km 54.180 near Azuram on EPC Mode (Package-4) | 10.70 | 198.77 | 19-07-2021 | 15-09-2021 | 100 | 98 | 16-03-2023 | Roadridge Developers Pvt. Ltd. - Sunshine Overseas Pvt. Ltd. (JV) |
rdplsopljvpkg4@gmail.com | |
44 | Completed | Widening and Improvement to 2-Lane with paved shoulders of Imphal-Moreh section of NH-39 (New NH-102) on (AH-01) from km 406.000 to Km 425.411 in state of Manipur on EPC mode (Package-IV) | 19.41 | 277.99 | 22-03-2021 | 20-07-2021 | 100 | 100 | 19-01-2023 | SKV Infratech Pvt. Ltd - SPG Infraprojects Pvt. Ltd (JV) | imphalmorehpkgiv@gmail.com | |
45 | Awarded, not Appointed | Construction ol 2-lane Ukhrul bypass starting from km 537.850 old NH-202 & joining at km 8.840 of NH-102A (Ukhrul - Tolloi - Tadubi Road) and continuing up to km 9.840 of NH-102A (Length 6.571 km) in the State ol Manipur on EPC mode under NH(O)-NE (Package-1) | 6.57 | 204.30 | 15-03-2024 | SCONS Infra - Kaushal Sharma (JV) | Appointed date not yet declared | |||||
46 | Completed | Construction of 4-Lane Bridge over Irang River on Imphal-Jiribam road section (at 95.50 Km) on NH-53 (New NH-37) on EPC mode in Manipur | 0.38 | 49.31 | 27-11-2020 | 04-01-2021 | 100 | 100 | 16-10-2022 | Paratech Constructions Pvt. Ltd. | paratech@paratechconstructions.com | |
47 | Completed | 2- Laning of Imphal – Moreh Section of NH-39 (New NH-102) on (AH-01) from Km 350.000 to Km 395.680 (Package- II) on EPC mode by ADB fund under SASEC Tranche-2 | 45.68 | 789.81 | 01-06-2018 | 16-10-2018 | 100 | 100 | 15-10-2021 | GR Infra Projects ltd | planning.imwa@grinfra.com |