Sr. No. | Project Status | Name of Project | Length (Km) | TPC (Rs. in Cr) | Date of Award | Appointed Date | Cumulative Physical progress ( %) as Per PMIS | Cumulative Financial progress (%) as Per PMIS | Original Schedule Completion Date | Likely Date of completion/ Actual Date of Completion | Name of the Contractor | Official Mail IDs of Contractor |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Ongoing | Construction of 4-Lane Bridge including approaches over River Brahmaputra between Dhubri (on North Bank,Assam) and Phulbari (on south Bank,Meghalaya) on NH-127B under JICA ODA Loan assistance (Phase-III) | 19.28 | 4997.04 | 24-11-2020 | 15-12-2020 | 62 | 59 | 12-09-2028 | 12-09-2028 | Larsen & Toubro Ltd. Heavy Civil Infrastructure IC Larsen & Toubro Ltd.(L&T) | dpbplnt@gmail.com |
2 | Ongoing | lmprovement to 4-Lane with Paved Shoulder from existing km 260+000 (Design Ch.4+560 km) to existing km Ch.233+000 (D. Ch.24+560) of Silchar (near Nutan Dayapur village) - Budha Nagar Section (Length-20.00 Km) of NH-37 under Package: Silchar-Jiribam Pkg-1 in the state of Assam on HAM Mode | 20.00 | 11-03-2024 | 15-01-2025 | 21 | 8 | 15-01-2028 | 15-01-2028 | Silchar Jiribam Highways Private Limited | headoffice@dccinfra.co.in | |
3 | Ongoing | Widening/lmprovement to 4-Lane with Paved Shoulder from existing road and Greenfield alignment form Design Ch. 62.800 (start of proposed Nilambazar/Cheragi Bypass) to Design Ch. 87.700 near Chandkhira Village of NH-8 on Silchar-Churaibari in the state of Assam on HAM Mode (Package-5) | 24.90 | 1258.13 | 11-03-2024 | 26-04-2025 | 23-10-2027 | 23-10-2027 | Silchar Churaibari Pvt. Ltd. | ccb_silchar@yahoo.co.in | ||
4 | Ongoing | Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5.580 Km to Ch.25.633 Km (Design Ch.0.000 Km to Ch.17.737km) (Km 901.100 to Km 921.145 of old NH-31) of Bilasipara- Guwahati road (NH-17) (Section: Near Chirakuta to near Mowatari, before Chapar Bypass) in the state ol Assam on HAM mode (Package-1) | 17.74 | 1081.15 | 11-03-2024 | 05-02-2025 | 3 | 04-08-2027 | 04-08-2027 | Bhartia Infra Projects Ltd. (BIPL) | finance@bhartiainfra.com | |
5 | Ongoing | Widening/ improvement to 4-Lane with paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km (Design Ch. 21.850 Km to Ch.48.670 Km) for Package-2 of Bilasipura- Guwahati road (NH-17) (Section: Near Mowatari, before Chapar Bypass to Tulungia (junction with NH-17)) in the state of Assam on HAM mode under NH(O)-NE (Pkg-2) | 26.82 | 1338.61 | 11-03-2024 | 05-12-2024 | 03-06-2027 | 03-06-2027 | Naresh Kumar Garg Infrastructure Ltd. (NKG)-Mowatari Guwahati Road Pvt. Ltd. | nkg@nkginfra.com | ||
6 | Ongoing | Widening/Improvement to 4-Lane with Paved Shoulder from km 55+000 (Nagabang Gamsuk) to km 82+514 (Oyan) in the State of Assam and Arunachal Pradesh on EPC mode under Bharatmala Pariyojna of Length 27.514 Km (Package-3) | 27.51 | 665.47 | 31-03-2023 | 16-09-2024 | 50 | 42 | 17-03-2027 | 18-03-2027 | Kaluwala Construction Pvt. Ltd.- Nirmal Buildinfra Pvt. Ltd. (JV) |
kcpl.assam@kaluwalaconstruction.in |
7 | Ongoing | Widening/lmprovement to 4-Lane with Paved shoulder for existing as well as Greenfield alignment of Badarpur – Churaibari section of NH-8 from Design chainage 87.700 (Chandkhira) to Km. 106.500 (Churaibari) section (Assam-Tripura border) in the state of Assam on HAM Mode (Package-6) | 18.80 | 870.00 | 11-03-2024 | 07-03-2025 | 4 | 07-03-2027 | 07-03-2027 | MKC Badarpur Churaibari Kamakhya Highways Pvt. Ltd. | engineering@mkcinfrastructureltd.com | |
8 | Ongoing | Widening/lmprovement to 4-L of Karimgani - sutarkandi section of NH 37 from design Ch 0+020 (Start of proposed Karimganj Bypass from NH -8) to design Chainage Km 14+380 near Sutarkandi (Spur Connectivity to Indo/Bangladesh Border) on Silchar-Churaibari in the State of Assam on HAM Mode (Package-7) | 14.36 | 791.79 | 11-03-2024 | 28-02-2025 | 1 | 28-02-2027 | 28-02-2027 | MKC Badarpur Churaibari Kamakhya (Pkg-7) Highways Pvt. Ltd. | engineering@mkcinfrastructureltd.com | |
9 | Ongoing | Construction of 4-Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-I Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors | 11.80 | 728.97 | 01-11-2023 | 10-08-2024 | 46 | 41 | 09-02-2027 | 09-02-2027 | J Infratech Limited (JIL) | isbt.silchar@jinfratech.com |
10 | Ongoing | Construction of New 2-Lane EXTRADOSED CABLE STAYED Bridge with its approaches from km 0+000 to Km 4+385 across River Brahmaputra on NH-17 at Jogighopa in Assam on EPC mode | 4.39 | 746.76 | 10-08-2021 | 12-11-2021 | 68 | 66 | 10-11-2024 | 31-12-2026 | Satpal (S. P.) Singla construction Pvt. Ltd.[SPSCPL] | spsjogighopa@spsingla.com |
11 | Ongoing | Widening/Improvement to 4-Lane with paved shoulder from Km 99+930 to Km 143+680 (Design Chainage 96+000 to 139+750) of (Paikan to Dhupdhara Sahar) of Bilasipura-Guwahati Road on NH-17 in the state of Assam on EPC mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 43.750km) under NH(O)-NE (Package-8) | 43.75 | 1457.59 | 14-03-2023 | 27-12-2023 | 47 | 42 | 26-12-2026 | 25-12-2026 | YFC Projects Pvt. Ltd. - TTC Infra India (JV) | ttcii.bg.pkg8@gmail.com |
12 | Ongoing | Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai Goan) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brownfield) (2-Lane+PS) of NH-315 (OLD NH-38) in Tinsukia District under NH(O)- NE (Pkg-4) | 10.25 | 356.65 | 28-02-2023 | 08-12-2023 | 18 | 15 | 06-12-2025 | 06-12-2026 | RK Infracorp Pvt. Ltd. | rkinfradigboiproject2023@gmail.com |
13 | Ongoing | Widening / Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Srirampur (near Bhairiguri Village) to Kachukhana Harichara Paglagaunj (Package-I) of Srirampur - Dhubri Section of NH-127B from existing Km 0.000 to Km 28.050 (Design Km 0.000 to Km 27.650), (Design Length=27.650 Km) under JICA ODA Loan assistance (Phase-V) -Balance work [Srirampur - Dhubri Pkg-1] | 27.65 | 613.89 | 06-09-2024 | 25-11-2024 | 36 | 31 | 25-11-2026 | 25-11-2026 | R&C Infra Engineers Pvt. Ltd-J Infratech Limited (JIL) (JV) | rc.jandupkg1@jinfratech.com |
14 | Ongoing | 4-Laning of Dhanehari Lailapur / Vairengte section from Existing Chainage km 12+920 to km 43+000 of NH 306 (Design Chainage km 20+000 to km 49+360) on Silchar - Vairengte Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode. (Project Length 29.360 km) under NH(O)-NE (Package-2) | 29.36 | 1716.21 | 31-03-2023 | 14-02-2024 | 65 | 61 | 14-08-2026 | 14-08-2026 | J Infratech Limited (JIL) | jandu.silchar@jinfratech.com |
15 | Ongoing | Construction of 4-Lane Badarpur Bypass from Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village to Design Chainage km 38+600 on NH-37 (Old NH-44) at Kandigram Chaita Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.1 km). | 11.10 | 574.26 | 16-03-2023 | 09-02-2024 | 55 | 49 | 09-08-2026 | 09-08-2026 | S S Builders | badarpurkmr@gmail.com |
16 | Ongoing | 4-Laning of Silchar - Dhanehari section from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km 20+000) on Silchar - Vairengte - Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode. (Project Length – 20.00 km) (Package-1) | 20.00 | 1256.90 | 21-03-2023 | 22-01-2024 | 40 | 32 | 23-07-2026 | 23-07-2026 | YFC Projects Pvt. Ltd. - TTC Infra India (JV) | ttcii.sd.pkg1@gmail.com |
17 | Ongoing | Widening/Improvement to 4-Lane with Paved Shoulder from Ch. 177+372km to Ch.203+783km (Design Ch.173+434km to Ch.200+750km) of Bilasipura- Guwahati road (NH 17) (Section: Milmila R.F (before Chayagaon Market) to Approach of Airport Junction (VIP Chowk) in the State of Assam on EPC mode under Bharatmala Pariyojana in Economic Corridors (Project Length - 27.316km) for (Package-10) | 27.31 | 1264.90 | 31-03-2023 | 18-12-2023 | 28 | 13 | 18-06-2026 | 18-06-2026 | ANIL Das - SAILAJA Commercial Construction Pvt. Ltd. (JV) | anilsailajaprojectspkg10@gmail.com |
18 | Ongoing | Widening/Improvement to 4-Lane with Paved Shoulder from Ch. 143+680km to Ch.177+372km (Design Ch.139+750km to Ch.173+434km) of Bilasipura- Guwahati road on NH-17 (Section: Dhupdhara Sahar to Milmila Reserve Forest (before Chayagaon Market)) in the state of Assam on EPC mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 33.684km) NH(O)-NE (Package-9) | 33.68 | 1000.27 | 20-03-2023 | 11-12-2023 | 29 | 21 | 11-06-2026 | 11-06-2026 | ANIL Das - SAILAJA Commercial Construction Pvt. Ltd. (JV) | anilsailajaprojects@gmail.com |
19 | Ongoing | Widening/Improvement to 4-Lane with Paved Shoulder from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Chapori) of NH-515 in the State of Assam on EPC mode under Bharatmala Pariyojna (Dibrugarh-Oyan, Package-1) | 26.90 | 609.16 | 31-03-2023 | 18-10-2023 | 98 | 91 | 17-04-2026 | 17-04-2026 | Kaluwala Construction Pvt. Ltd.- Nirmal Buildinfra Pvt. Ltd. (JV) |
kcpl.assam@kaluwalaconstruction.in |
20 | Ongoing | Wideinig & Upgradation to 2-lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 96.870 near Jiri River to km 116.550 near Hangrum (Package-7) on EPC mode (Assam portion) | 19.68 | 846.82 | 22-01-2024 | 04-03-2024 | 69 | 68 | 04-03-2026 | 04-03-2026 | Rajinder Infrastructure Pvt.Ltd. | official.riplassam@gmail.com |
21 | Ongoing | Widening/Improvement to 4-Lane with Paved Shoulder from km 27+701 (Simen Chapori) to km 55+000 (Nagabang Gamsuk) in Dhemaji district in the State of Assam on EPC mode under Bharatmala Pariyojna (Package-2) | 27.30 | 562.05 | 31-03-2023 | 11-08-2023 | 99 | 92 | 08-02-2026 | 08-02-2026 | Kaluwala Construction Pvt. Ltd.- Nirmal Buildinfra Pvt. Ltd. (JV) |
kcpl.assam@kaluwalaconstruction.in |
22 | Ongoing | 4-Laning from Rangagara to Kaliabor Tiniali (from km 297.00 to km 315.315) of NH-37 (New NH-127) under SARDP-NE, Phase A on EPC Mode in Assam | 18.32 | 462.88 | 16-01-2017 | 23-10-2017 | 88 | 87 | 21-04-2020 | 31-12-2025 | Simplex Infrastructures Ltd. | c3172@simplexinfra.com |
23 | Ongoing | Widening/Improvement to 4-Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukhia -Makum Bypass of NH-15 (OLD NH-37) and Strengthening of existing NH-315 (OLD NH-38) from Km 0+000 (Chotahapjan) to Km 16+900 (Bogapani section) (2-Lane +PS) in Assam on EPCMode under NH(O)-NE (Pkg-3) | 41.32 | 458.59 | 03-02-2023 | 19-05-2023 | 66 | 62 | 17-05-2025 | 30-11-2025 | TTC Infra India | ttcii.tm@gmail.com |
24 | Ongoing | Widening/Improvement to 4-Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka – Parokhaowa of NH 29 under NH(O)-NE (Package-1) | 12.46 | 516.88 | 24-02-2023 | 30-11-2023 | 76 | 71 | 29-11-2025 | 29-11-2025 | Mehta Construction Co. | mehtapkg1nh29@gmail.com |
25 | Ongoing | Widening/Improvement to 4 -Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000 km) of Sagunbashi forest (near Nichinta) to starting of Krishnai Bypass Section (Package-7) of Bilasipura Guwahati road (NH 17) | 11.90 | 286.72 | 24-03-2023 | 25-10-2023 | 82 | 76 | 25-10-2025 | 25-10-2025 | Mayasheel Construction | msc.pkg7@gmail.com |
26 | Ongoing | Construction of Balance Work of 4-Laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg- IV: (Structures & Toll Plaza) from Km 490.800 to Km 534.800, under SARDP- NE , under EPC Mode in the state of Assam (with Toll Plaza at Ch.525.245) | 98.07 | 19-08-2024 | 18-10-2024 | 27 | 19 | 13-10-2025 | 13-10-2025 | Bhardwaj Unibuild Pvt. Ltd. | bupljd4@gmail.com | |
27 | Ongoing | Construction of Balance Work of 4-Laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-II: Road Works from Km 501.800 to Km 514.800 (13.000 Km), under SARDP- NE under EPC Mode in the state of Assam | 13.00 | 537.03 | 06-08-2024 | 10-10-2024 | 47 | 41 | 05-10-2025 | 05-10-2025 | Bharat Vanijya Eastern Pvt. Ltd.(BVEPL) | contact@bvepl.com |
28 | Ongoing | Construction of Balance Work of 4-Laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-III: Road Works from Km 514.800 to Km 534.800 (20.000 Km), under SARDP- NE under EPC Mode in the state of Assam | 20.00 | 615.74 | 06-08-2024 | 03-10-2024 | 48 | 44 | 28-09-2025 | 28-09-2025 | Kaushal Sharma | ksharma.tsk@gmail.com |
29 | Ongoing | Construction of Balance Work of 4-Laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-I: Road Works from Km 490.800 to Km 501.800 (11.000 Km), under SARDP- NE under EPC Mode in the state of Assam | 11.00 | 471.13 | 06-08-2024 | 03-10-2024 | 67 | 65 | 28-09-2025 | 28-09-2025 | Regal Enterprises | regaljdpkg1@gmail.com regal.jitender@gmail.com |
30 | Ongoing | Widening & Improvement to 2-lane with Paved shoulder configuration of Dudhnoi - Dainadubi section (NH-217) under Bharatmala Pariyojana from design km 0+000 to km 8+415 (existing km 0+000 to km 8+600 of Old NH-62) in the State of Assam on EPC mode under NH(O)-NE, (Assam portion) | 8.42 | 88.56 | 31-03-2023 | 26-03-2024 | 77 | 68 | 25-09-2025 | 25-09-2025 | Shyama Construction | shyamaconstructionnh217@gmail.com |
31 | Ongoing | Widening & Upgradation to 2 lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 156.489 near P. Leikul to km 176.410 near Borowapu (Package-10) on EPC mode under NH (O)-NE (Assam portion) | 19.92 | 693.15 | 31-03-2023 | 29-08-2023 | 66 | 59 | 29-08-2025 | 29-08-2025 | Anusha Projects Pvt. Ltd.- BKD Infrastructures Pvt. Ltd. (JV) | anushaprojects@gmail.com |
32 | Ongoing | Widening & Upgradation to 2-lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 116.480 near Hangrum to km 136.500 near Hejaichak (Package-8) on EPC mode under NH(O)-NE (Assam portion) | 20.02 | 904.04 | 31-03-2023 | 29-08-2023 | 68 | 60 | 29-08-2025 | 29-08-2025 | Anusha Projects Pvt. Ltd.- BKD Infrastructures Pvt. Ltd. (JV) | appl.tmr8@gmail.com |
33 | Ongoing | Widening & Upgradation to 2 lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 136.500 near Hejaichak to km 156.489 near P. Leikul (Package-9) on EPC mode under NH(O)-NE (Assam portion) | 19.99 | 614.43 | 31-03-2023 | 29-08-2023 | 69 | 51 | 29-08-2025 | 29-08-2025 | KPC Projects Ltd. | pc.nh137@kpc.co |
34 | Ongoing | Construction of Balance Work of 4-Laning of NH-37 Section between End of Moran Bypass to Bogibeel junction near Lapetketa ((Km. 561.700-Km. 580.875) under SARDP-NE, Phase 'A' in the State of Assam on EPC mode Pkg-I: Road works & Toll Plaza | 19.18 | 274.34 | 26-07-2024 | 16-09-2024 | 92 | 74 | 14-03-2025 | 31-07-2025 | Mohan Lal Jain | mljmobohw@gmail.com |
35 | Ongoing | Construction of Balance Work of the 4-Laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-III: Road Works from Km 477.000 to Km 490+800 (13.800 Km), under SARDP- NE under EPC Mode in the state of Assam | 13.80 | 358.72 | 15-01-2024 | 14-02-2024 | 96 | 93 | 11-08-2024 | 31-07-2025 | M. P. (Mahabir Prasad) Agarwala Pvt. Ltd. | mpagarwalapvtltd@gmail.com |
36 | Ongoing | Up-gradation to 4-Laning of Jamugurihat to end of Biswanath Chariali By-Pass from Km 182.000 to Km 208.000 of NH-52 on EPC mode in state of Assam under SARDP-NE | 26.00 | 735.17 | 13-10-2016 | 19-12-2016 | 98 | 92 | 19-06-2019 | 31-07-2025 | T K Engineering Consortium Pvt. Ltd.(TKECPL) | info@ganpatibharat |
37 | Ongoing | Construction of Balance Work of 4-Laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-I: Road Works from Km 453+000 to Km 463+000 (10.000 Km), under SARDP- NE under EPC Mode in the state of Assam | 10.00 | 478.30 | 15-01-2024 | 14-02-2024 | 95 | 89 | 11-08-2024 | 31-07-2025 | Sadguru Engineers & Allied Services Pvt. Ltd. | seaspvtltdghy@gmail.com |
38 | Ongoing | Construction of Balance Work of 4-Laning of NH-37 Section between End of Moran Bypass to Bogibeel junction near Lapetketa ((Km. 561.700-Km. 580.875) under SARDP-NE, Phase 'A' in the State of Assam on EPC mode Pkg-II: Structures | 55.96 | 26-07-2024 | 16-09-2024 | 87 | 70 | 14-03-2025 | 31-07-2025 | Mehta Construction Co. | mccmobostr@gmail.com | |
39 | Ongoing | Construction of Balance Work of the 4-Laning of the Section from Jorhat to Jhanji of NH-37 (Old) from Km 453.000 to Km 490.800, under SARDP- NE , under EPC Mode in the state of Assam : Pkg-IV (Structures & Toll Plaza) | 279.01 | 15-01-2024 | 14-02-2024 | 94 | 89 | 11-08-2024 | 31-07-2025 | Sadguru Engineers & Allied Services Pvt. Ltd. | seaspvtltdghy@gmail.com | |
40 | Ongoing | 4-Laning of NH-37 Section between Demow to End of Moran Bypass (From Km. 534.800 to Km. 561.700) including Emergency Landing Facility (ELF) under SARDP-NE, Phase 'A' in the State of Assam on EPC mode | 26.90 | 385.57 | 14-10-2022 | 20-01-2023 | 98 | 96 | 20-07-2024 | 31-07-2025 | Mohan Lal Jain | msmljaindurgapur@yahoo.com |
41 | Ongoing | Construction of Balance Work of the 4-Laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-II: Road Works from Km 463.00 to Km 477.000 (14.000 Km), under SARDP- NE under EPC Mode in the state of Assam | 14.00 | 438.44 | 15-01-2024 | 14-02-2024 | 93 | 83 | 11-08-2024 | 31-07-2025 | Binni Construction | binniconstruction73@gmail.com |
42 | Ongoing | Widening/lmprovement to 4-Lane with Paved Shoulder from Dillai at Km 146+230 to Lahorijan at Km 157+46O (Design Chainage 145+712 to 156+502) of Dillai - Lahorijan (Package - 7) | 10.79 | 204.10 | 02-09-2022 | 20-01-2023 | 97 | 95 | 20-07-2024 | 15-07-2025 | Shankar Agarwal | nh29pkg7sa@gmail.com |
43 | Completed | Construction of 2-L Dibrugarh By Pass / realignment of NH-37 from Bogibeel Junction at km. 581.700 to km. 597.147 on EPC basis in the state of Assam under SARDP-NE | 15.45 | 379.32 | 20-02-2015 | 02-11-2015 | 100 | 100 | 31-10-2018 | ABCI Infrastructures-JKM Pvt. Ltd (JV) | jkmdbrproject@gmail.com jkmdibrugarhbypass@gmail.com |
|
44 | Completed | Widening/Improvement to 4 -Lane with Paved Shoulder from Ch. 52.470km to Ch.71.500 km (Design Ch.48.655km to Ch.67.556km)of Tulungia-Jogighopa Bridge Approach Section of Bilasipura- Guwahati road (NH 17) on EPC (Package-5) | 18.90 | 691.53 | 22-03-2021 | 09-07-2021 | 100 | 100 | 31-12-2022 | Rajendra Singh Bhamboo Infra Pvt. Ltd. | rajendrabhamboo@yahoo.co.in | |
45 | Completed | 4-Laning of NH-37 (New NH-127) from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode-Package-1 | 10.00 | 225.02 | 23-03-2020 | 01-07-2020 | 100 | 100 | 23-12-2021 | PRL Projects & Infra Structure Ltd. | rcplassam1@gmail.com, nagaonnh127@prlinfra.com | |
46 | Completed | Construction of 4-L Jia Bharali Bridge (1.23 Km at km 26+607) along with its approaches and River Training Work from km 25.552 to km 27.500 of NH-37A (New NH-715) (de-scoped portion of Dolabari and Jamuguri section/CoS work) | 1.95 | 21-12-2020 | 17-02-2021 | 100 | 100 | 05-08-2023 | MKC Infrastructure Ltd. - RSM Infra Projects (JV) | dccindiaproject@gmail.com | ||
47 | Completed | Widening/Improvement to 4-Lane with Paved Shoulder from km 81+000 to km 95+400 (Design Chainage 80+930 to 96+400) of Loring Thepi - Ganapath Gaur Gaon Section in the state of Assam under Bharatmala Pariyojana on EPC mode (Package-4) | 15.47 | 260.07 | 03-02-2021 | 25-06-2021 | 100 | 100 | 17-12-2022 | S S Builders | ssbuilderspkg4@gmail.com, | |
48 | Completed | INFRASTRUCTURE WORK: Deveopment of Inland Water Transport (IWT) Terminal at MMLP Jogighopa | 70.92 | 06-10-2021 | 22-04-2022 | 99 | 98 | 14-10-2023 | DVP Infra Projects Pvt. Ltd. | info@dvpinfra.com | ||
49 | Completed | Rehabilitation & up-gradation to 4-Lane with Paved shoulder of Dergaon Town section from Km 426.800 to Km 437.400 on NH-37(New NH-715) in Assam on EPC basis | 10.60 | 426.15 | 19-03-2020 | 30-06-2020 | 100 | 100 | 19-06-2022 | Rajinder Infrastructure Pvt.Ltd. | jornh37@gmail.com ripl.chd@gmail.com |
|
50 | Completed | One time improvement of Digboi to Ledo Town section (via Powal and Margherita ) of NH-38 from km 20.000 to km 53.000 in Assam on EPC Mode under NH(O) | 33.00 | 30.84 | 29-07-2019 | 25-09-2019 | 100 | 100 | 23-09-2020 | Ganpati Builders | ganpatidib@gmail.com op.sharma0082@gmail.com ganpatibuilders0082@gmail.com |
|
51 | Completed | 4-Laning from Km 0.000 (Kaliabor Tiniali road junction) to Km 17.300 (Dolabari Road Junction) including construction of new Brahmaputra Bridge of 3.015Km (from Ch. 9+325 to Ch. 12+365) alongside of existing Kaliabhomora Bridge of NH 37-A (New NH-715) on EPC basis under Phase A of SARDP-NE (with Toll Plaza at Ch.7+050) |
17.30 | 811.28 | 31-10-2014 | 29-11-2014 | 100 | 100 | 28-11-2018 | Gammon India Ltd.- Satpal (S. P.) Singla construction Pvt. Ltd.[SPSCPL] (JV) | manoj.rathore@gammonengineers.com 9303_newbrahmaputra.planing@ gammonengineers.com |
|
52 | Completed | Widening/lmprovement to 4-Lane with paved shoulders from Km. 51+246 to Km. 66+000 (Design Chainage 50+710 Km to 65+923 Km) of Parokhuwa-Dokmoka section of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode (Package-2) | 15.21 | 257.50 | 26-03-2021 | 12-07-2021 | 100 | 100 | 03-01-2023 | P.D. Agrawal Infrastructure Ltd. -Apex Structure Pvt Ltd. (JV) | apexcompany2009@yahoo.in | |
53 | Completed | INFRASTRUCTURE WORK: MMLP (Package-II: Building and Infrastructure works) | 05-08-2020 | 30-09-2020 | 100 | 100 | 03-04-2022 | Credible Engineering Construction Pvt. Ltd. | credibleengineering@gmail.com | |||
54 | Completed | Up-gradation to 4-Laning of NH-52A from Gohpur (Km 264.100 on NH-52) to Holongi (Km.20.370 on NH-52A) in Assam on EPC under SARDP-NE | 10.08 | 223.30 | 30-03-2015 | 11-12-2015 | 100 | 100 | 10-12-2018 | ECI Engineering & Constr. Co. Ltd. | pmgohpur@eciecc.com ecigohpur@gmail.com |
|
55 | Completed | Widening/improvement to 4-Lane with paved shoulder from km. 606+300 to km 626+030 of NH-37 on existing Lahoal-Chabua Bypass i.e. Kandulibari Grant Gaon to Nalanihulla section in Assam on EPCMode under NH(O)-NE [Pkg.2] | 19.73 | 170.95 | 05-04-2022 | 25-07-2022 | 100 | 99 | 24-07-2024 | Jugal Kishore Mahanta Infra works (JKM) | jkmahanta@jkminfra.net , jkmho@jiminfra.net , jkmdbrproject@gmail.com |
|
56 | Awarded, not Appointed | Widening/lmprovement of Existing 2 lane to 4-Laning of Karimganj-Silchar section of NH-37 from Design Ch 0.000 near Silchar ISBT to Design Ch 15.970 near Kalinagar Pt I on NH-37 in Assam on HAM Mode (Pkg-1) | 15.97 | 1181.55 | 11-03-2024 | Jandu Silchar Highway Pvt. Ltd. | jandu.panchgram@jinfratech.com | |||||
57 | Completed | 4-Laning of Balachera-Harangjao section of NH-54 (ext.) from km 275.00 to km 244.00 in the state of Assam under east west corridor project. | 25.25 | 887.68 | 31-10-2017 | 26-12-2017 | 100 | 99 | 24-06-2020 | Sushee Infra & Mining Limited - JSC Purpetruboprovodstroy (JSC PTPS) (JV) | planning.balachera@gmail.com | |
58 | Completed | Improvement and Strenghtening of Road Section from Chand Khera to Kurti Bridge on NH-208A on (Assam-Tripura Border) in the state of Assam on EPC Mode under NH(O) | 17.95 | 66.94 | 04-10-2016 | 28-11-2016 | 100 | 100 | 24-01-2018 | Ganesh Ram Dokania | ||
59 | Completed | 4-Laning of NH-37 (New NH-127) from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package - 2 | 8.40 | 20-03-2020 | 01-07-2020 | 100 | 100 | 23-12-2021 | Ganga Sagar Singh | support@gss.org.in |
||
60 | Completed | Widening/lmprovement to 4-Lane of Daboka Dimapur Stretch from Km 95+400 to Km 113+830 (Design Chainage 96+400 Km to 113+830 Km) of Ganpath Gaur Gaon- Kwaram Taro Vitlage in the state of Assam under Bharatmala Pariyojana on EPC mode (Package-5) | 17.43 | 288.85 | 31-03-2021 | 12-07-2021 | 100 | 99 | 12-01-2023 | B.K.Sons Infra Pvt. Ltd. | info@bksonsinfra.com | |
61 | Completed | Widening / Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach (Package-II) of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) under JICA ODA Loan assistance (Phase-V) [Srirampur - Dhubri Pkg-2] | 26.50 | 909.02 | 04-08-2022 | 02-01-2023 | 100 | 98 | 01-01-2025 | J Infratech Limited (JIL) | assam.pkg2@gmail.com assam.pkg2@jinfratech.com |
|
62 | Awarded, not Appointed | Widening/lmprovement to 4-Laning and Greenfield alignment with Paved shoulder of Silchar-Badarpur – Churaibari section of NH-37 & NH-8 from Design chainage 38.600 (End point of proposed Badarpur Bypass) to Km. 62.800 (Start point of proposed Nilambazar/Cheragi Bypass) in the state of Assam on HAM Mode (Package-4) | 24.20 | 1319.55 | 11-03-2024 | MKC Badarpur Churaibari Kamakhya (Pkg-4) Highways Pvt. Ltd. | engineering@mkcinfrastructureltd.com | |||||
63 | Completed | 2-laning with paved shoulders from km 6.25 to 10.40 including RoB (Railway Over Bridge) at Srikona Railway Level Crossing at km 9.901 of Silchar- Badarpur section of NH-53 in state of Assam under SARDP-NE | 4.15 | 76.78 | 23-03-2015 | 01-10-2015 | 100 | 100 | 11-12-2017 | Shree Gautam Construction Company Ltd. | sgcclsilchar@gmail.com | |
64 | Completed | 4-Lane highway connecting km 17.300 of old NH-37A (New NH-715) and km 182 of NH-52 (New NH-15) between Dolabari and Jamuguri Section in Assam on EPC basis under SARDP-NE, Phase-A | 16.86 | 1049.51 | 05-11-2021 | 07-02-2022 | 100 | 100 | 08-08-2023 | Sri Babul Nath | mkcilrsmjv@gmail.com, jatin.s@rsminfra.in, jiabharali.dc@mkcinfrastructureltd.com | |
65 | Completed | Widening/Improvement to 4-Lane with Paved shoulder from km 66.00 to km 81.00 (Design Chainage 65.923 to 80.930) of Dokmoka - LoringThepi section- (Package-3) | 15.01 | 266.26 | 10-08-2020 | 30-09-2020 | 100 | 100 | 24-03-2022 | Skylark Infra Engg. Pvt. Ltd. | pm.dokmoka@skylarkworld.com | |
66 | Completed | INFRASTRUCTURE WORK: MMLP (Pkg.-III : External Rail Connectivity) | 3.76 | 09-10-2020 | 01-12-2020 | 93 | 82 | 01-06-2022 | Sumcon Infraventures LLP | gunjan@sumconinfraventures.com | ||
67 | Completed | 4-Laning of Numaligarh to Jorhat section from Km. 402.500 to Km. 453.000 (Design Km 403.200 to Km 454.240) of NH-37 except construction of Dergaon bypass from Km 426.800 to Km 437.420 (Design Km 427.400 to 438.720) in Assam on EPC mode under SARDP-NE Phase-A (with Toll Plaza at Ch. 424+400 near Rangamati) | 39.72 | 1655.44 | 31-10-2014 | 23-05-2015 | 100 | 100 | 22-05-2018 | Hindustan Construction Company (HCC) | njrp.pd@hccindia.com, njrp.qclab@hccindia.com, njrp@hccindia.com |
|
68 | Completed | Construction and up gradation to 4-Lane of existing two lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to km 14.050 and (Design Km 0.000 to km 14.660), (Design length- 14.660 km) under BMP | 14.66 | 224.85 | 26-03-2020 | 26-06-2020 | 98 | 93 | 26-12-2022 | B.K.Sons Infra Pvt. Ltd. | info@bksonsinfra.com | |
69 | Completed | One time improvement of Moran Town section of NH-37 from km 555.000 to km 558.500 in Assam on EPC Mode under NH(O) | 3.50 | 14.52 | 31-05-2019 | 19-08-2019 | 100 | 100 | 17-08-2020 | BB Enterprises | binudborgohain1972@gmail.com | |
70 | Completed | Widening/Improvement to 4-Lane with paved shoulder from Ch.75.330Km to Ch.88.00km (Design Ch.71.800 to 84.100 km) of Jogighopa Bridge Approach (Near Pancharatna)- Agia (near Nichinta) section of Bilasipura-Guwahati road (NH-17) on EPC under BMP (Pkg. 6) 1 Toll Plaza at (Ch73+750 Km) |
11.78 | 208.84 | 25-08-2020 | 26-10-2020 | 100 | 100 | 19-04-2022 | Mayasheel Construction | msc.pkg6@gmail.com | |
71 | Completed | INFRASTRUCTURE WORK: MMLP (Package-I: Road and Utility Works) | 4.25 | 693.97 | 05-06-2020 | 30-09-2020 | 100 | 96 | 01-04-2022 | RAM CHANDRA PAUL | ram_chandrapaul@yahoo.in | |
72 | Completed | Up-gradation to 4-Laning from end of Biswanath Chariali by-pass (Km 208.000) to Gohpur (Km 265.500) of NH-52 (New NH-15) (Total length 57.50) in the state of Assam on EPC basis Under SARDP-NE (with Toll Plaza at Ch. 219+200) |
57.50 | 1099.35 | 18-10-2021 | 11-12-2021 | 100 | 100 | 14-06-2023 | Dhatarwal Construction Company Pvt. Ltd. | babulsayan@gmail.com ,babulnath40@gmail.com dolabari.jamuguri@gmail.com |
|
73 | Completed | Widening/Improvement to 4-Lane with Paved Shoulder from KM 113+300 to Km 146+230 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village - Dillai Section (Package-6) | 31.88 | 625.64 | 10-09-2021 | 14-07-2022 | 100 | 98 | 13-07-2024 | Ashoka Buildcon Ltd. | ablnh29pkg6@ashokabuildcon.in | |
74 | Completed | Widening/improvement to 4-Lane with paved shoulder from km. 581+700 to km 606+300 of NH-37 on existing Dibrugarh-Lahoal-Chabua Bypass i.e. from Lepetketa to Kandulibari Grant Gaon section in Assam on EPCMode under NH(O)-NE [Pkg.1] | 24.60 | 215.27 | 31-03-2022 | 25-07-2022 | 100 | 97 | 24-07-2024 | Ganpati Builders | op.sharma0082@gmail.com , ganpatibuilders0082@gmail.com , ganpatidib@gmail.com |