Sr. No. Project Status Name of Project Length (Km) TPC (Rs. in Cr) Date of Award Appointed Date Cumulative Physical progress ( %) as Per PMIS Cumulative Financial progress (%) as Per PMIS Original Schedule Completion Date Likely Date of completion/ Actual Date of Completion Name of the Contractor Official Mail IDs of Contractor
1 Ongoing Construction of 4-Lane Bridge including approaches over River Brahmaputra between Dhubri (on North Bank,Assam) and Phulbari (on south Bank,Meghalaya) on NH-127B under JICA ODA Loan assistance (Phase-III) 19.28 4997.04 24-11-2020 15-12-2020 62 59 12-09-2028 12-09-2028 Larsen & Toubro Ltd. Heavy Civil Infrastructure IC Larsen & Toubro Ltd.(L&T) dpbplnt@gmail.com
2 Ongoing lmprovement to 4-Lane with Paved Shoulder from existing km 260+000 (Design Ch.4+560 km) to existing km Ch.233+000 (D. Ch.24+560) of Silchar (near Nutan Dayapur village) - Budha Nagar Section (Length-20.00 Km) of NH-37 under Package: Silchar-Jiribam Pkg-1 in the state of Assam on HAM Mode 20.00 11-03-2024 15-01-2025 21 8 15-01-2028 15-01-2028 Silchar Jiribam Highways Private Limited headoffice@dccinfra.co.in
3 Ongoing Widening/lmprovement to 4-Lane with Paved Shoulder from existing road and Greenfield alignment form Design Ch. 62.800 (start of proposed Nilambazar/Cheragi Bypass) to Design Ch. 87.700 near Chandkhira Village of NH-8 on Silchar-Churaibari in the state of Assam on HAM Mode (Package-5) 24.90 1258.13 11-03-2024 26-04-2025 23-10-2027 23-10-2027 Silchar Churaibari Pvt. Ltd. ccb_silchar@yahoo.co.in
4 Ongoing Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5.580 Km to Ch.25.633 Km (Design Ch.0.000 Km to Ch.17.737km) (Km 901.100 to Km 921.145 of old NH-31) of Bilasipara- Guwahati road (NH-17) (Section: Near Chirakuta to near Mowatari, before Chapar Bypass) in the state ol Assam on HAM mode (Package-1) 17.74 1081.15 11-03-2024 05-02-2025 3 04-08-2027 04-08-2027 Bhartia Infra Projects Ltd. (BIPL) finance@bhartiainfra.com
5 Ongoing Widening/ improvement to 4-Lane with paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km (Design Ch. 21.850 Km to Ch.48.670 Km) for Package-2 of Bilasipura- Guwahati road (NH-17) (Section: Near Mowatari, before Chapar Bypass to Tulungia (junction with NH-17)) in the state of Assam on HAM mode under NH(O)-NE (Pkg-2) 26.82 1338.61 11-03-2024 05-12-2024 03-06-2027 03-06-2027 Naresh Kumar Garg Infrastructure Ltd. (NKG)-Mowatari Guwahati Road Pvt. Ltd. nkg@nkginfra.com
6 Ongoing Widening/Improvement to 4-Lane with Paved Shoulder from km 55+000 (Nagabang Gamsuk) to km 82+514 (Oyan) in the State of Assam and Arunachal Pradesh on EPC mode under Bharatmala Pariyojna of Length 27.514 Km (Package-3) 27.51 665.47 31-03-2023 16-09-2024 50 42 17-03-2027 18-03-2027 Kaluwala Construction Pvt. Ltd.-
Nirmal Buildinfra Pvt. Ltd. (JV)
kcpl.assam@kaluwalaconstruction.in
7 Ongoing Widening/lmprovement to 4-Lane with Paved shoulder for existing as well as Greenfield alignment of Badarpur – Churaibari section of NH-8 from Design chainage 87.700 (Chandkhira) to Km. 106.500 (Churaibari) section (Assam-Tripura border) in the state of Assam on HAM Mode (Package-6) 18.80 870.00 11-03-2024 07-03-2025 4 07-03-2027 07-03-2027 MKC Badarpur Churaibari Kamakhya Highways Pvt. Ltd. engineering@mkcinfrastructureltd.com
8 Ongoing Widening/lmprovement to 4-L of Karimgani - sutarkandi section of NH 37 from design Ch 0+020 (Start of proposed Karimganj Bypass from NH -8) to design Chainage Km 14+380 near Sutarkandi (Spur Connectivity to Indo/Bangladesh Border) on Silchar-Churaibari in the State of Assam on HAM Mode (Package-7) 14.36 791.79 11-03-2024 28-02-2025 1 28-02-2027 28-02-2027 MKC Badarpur Churaibari Kamakhya (Pkg-7) Highways Pvt. Ltd. engineering@mkcinfrastructureltd.com
9 Ongoing Construction of 4-Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-I Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors 11.80 728.97 01-11-2023 10-08-2024 46 41 09-02-2027 09-02-2027 J Infratech Limited (JIL) isbt.silchar@jinfratech.com
10 Ongoing Construction of New 2-Lane EXTRADOSED CABLE STAYED Bridge with its approaches from km 0+000 to Km 4+385 across River Brahmaputra on NH-17 at Jogighopa in Assam on EPC mode 4.39 746.76 10-08-2021 12-11-2021 68 66 10-11-2024 31-12-2026 Satpal (S. P.) Singla construction Pvt. Ltd.[SPSCPL] spsjogighopa@spsingla.com
11 Ongoing Widening/Improvement to 4-Lane with paved shoulder from Km 99+930 to Km 143+680 (Design Chainage 96+000 to 139+750) of (Paikan to Dhupdhara Sahar) of Bilasipura-Guwahati Road on NH-17 in the state of Assam on EPC mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 43.750km) under NH(O)-NE (Package-8) 43.75 1457.59 14-03-2023 27-12-2023 47 42 26-12-2026 25-12-2026 YFC Projects Pvt. Ltd. - TTC Infra India (JV) ttcii.bg.pkg8@gmail.com
12 Ongoing Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai Goan) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brownfield) (2-Lane+PS) of NH-315 (OLD NH-38) in Tinsukia District under NH(O)- NE (Pkg-4) 10.25 356.65 28-02-2023 08-12-2023 18 15 06-12-2025 06-12-2026 RK Infracorp Pvt. Ltd. rkinfradigboiproject2023@gmail.com
13 Ongoing Widening / Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Srirampur (near Bhairiguri Village) to Kachukhana Harichara Paglagaunj (Package-I) of Srirampur - Dhubri Section of NH-127B from existing Km 0.000 to Km 28.050 (Design Km 0.000 to Km 27.650), (Design Length=27.650 Km) under JICA ODA Loan assistance (Phase-V) -Balance work [Srirampur - Dhubri Pkg-1] 27.65 613.89 06-09-2024 25-11-2024 36 31 25-11-2026 25-11-2026 R&C Infra Engineers Pvt. Ltd-J Infratech Limited (JIL) (JV) rc.jandupkg1@jinfratech.com
14 Ongoing 4-Laning of Dhanehari Lailapur / Vairengte section from Existing Chainage km 12+920 to km 43+000 of NH 306 (Design Chainage km 20+000 to km 49+360) on Silchar - Vairengte Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode. (Project Length 29.360 km) under NH(O)-NE (Package-2) 29.36 1716.21 31-03-2023 14-02-2024 65 61 14-08-2026 14-08-2026 J Infratech Limited (JIL) jandu.silchar@jinfratech.com
15 Ongoing Construction of 4-Lane Badarpur Bypass from Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village to Design Chainage km 38+600 on NH-37 (Old NH-44) at Kandigram Chaita Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.1 km). 11.10 574.26 16-03-2023 09-02-2024 55 49 09-08-2026 09-08-2026 S S Builders badarpurkmr@gmail.com
16 Ongoing 4-Laning of Silchar - Dhanehari section from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km 20+000) on Silchar - Vairengte - Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode. (Project Length – 20.00 km) (Package-1) 20.00 1256.90 21-03-2023 22-01-2024 40 32 23-07-2026 23-07-2026 YFC Projects Pvt. Ltd. - TTC Infra India (JV) ttcii.sd.pkg1@gmail.com
17 Ongoing Widening/Improvement to 4-Lane with Paved Shoulder from Ch. 177+372km to Ch.203+783km (Design Ch.173+434km to Ch.200+750km) of Bilasipura- Guwahati road (NH 17) (Section: Milmila R.F (before Chayagaon Market) to Approach of Airport Junction (VIP Chowk) in the State of Assam on EPC mode under Bharatmala Pariyojana in Economic Corridors (Project Length - 27.316km) for (Package-10) 27.31 1264.90 31-03-2023 18-12-2023 28 13 18-06-2026 18-06-2026 ANIL Das - SAILAJA Commercial Construction Pvt. Ltd. (JV) anilsailajaprojectspkg10@gmail.com
18 Ongoing Widening/Improvement to 4-Lane with Paved Shoulder from Ch. 143+680km to Ch.177+372km (Design Ch.139+750km to Ch.173+434km) of Bilasipura- Guwahati road on NH-17 (Section: Dhupdhara Sahar to Milmila Reserve Forest (before Chayagaon Market)) in the state of Assam on EPC mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 33.684km) NH(O)-NE (Package-9) 33.68 1000.27 20-03-2023 11-12-2023 29 21 11-06-2026 11-06-2026 ANIL Das - SAILAJA Commercial Construction Pvt. Ltd. (JV) anilsailajaprojects@gmail.com
19 Ongoing Widening/Improvement to 4-Lane with Paved Shoulder from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Chapori) of NH-515 in the State of Assam on EPC mode under Bharatmala Pariyojna (Dibrugarh-Oyan, Package-1) 26.90 609.16 31-03-2023 18-10-2023 98 91 17-04-2026 17-04-2026 Kaluwala Construction Pvt. Ltd.-
Nirmal Buildinfra Pvt. Ltd. (JV)
kcpl.assam@kaluwalaconstruction.in
20 Ongoing Wideinig & Upgradation to 2-lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 96.870 near Jiri River to km 116.550 near Hangrum (Package-7) on EPC mode (Assam portion) 19.68 846.82 22-01-2024 04-03-2024 69 68 04-03-2026 04-03-2026 Rajinder Infrastructure Pvt.Ltd. official.riplassam@gmail.com
21 Ongoing Widening/Improvement to 4-Lane with Paved Shoulder from km 27+701 (Simen Chapori) to km 55+000 (Nagabang Gamsuk) in Dhemaji district in the State of Assam on EPC mode under Bharatmala Pariyojna (Package-2) 27.30 562.05 31-03-2023 11-08-2023 99 92 08-02-2026 08-02-2026 Kaluwala Construction Pvt. Ltd.-
Nirmal Buildinfra Pvt. Ltd. (JV)
kcpl.assam@kaluwalaconstruction.in
22 Ongoing 4-Laning from Rangagara to Kaliabor Tiniali (from km 297.00 to km 315.315) of NH-37 (New NH-127) under SARDP-NE, Phase A on EPC Mode in Assam 18.32 462.88 16-01-2017 23-10-2017 88 87 21-04-2020 31-12-2025 Simplex Infrastructures Ltd. c3172@simplexinfra.com
23 Ongoing Widening/Improvement to 4-Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukhia -Makum Bypass of NH-15 (OLD NH-37) and Strengthening of existing NH-315 (OLD NH-38) from Km 0+000 (Chotahapjan) to Km 16+900 (Bogapani section) (2-Lane +PS) in Assam on EPCMode under NH(O)-NE (Pkg-3) 41.32 458.59 03-02-2023 19-05-2023 66 62 17-05-2025 30-11-2025 TTC Infra India ttcii.tm@gmail.com
24 Ongoing Widening/Improvement to 4-Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka – Parokhaowa of NH 29 under NH(O)-NE (Package-1) 12.46 516.88 24-02-2023 30-11-2023 76 71 29-11-2025 29-11-2025 Mehta Construction Co. mehtapkg1nh29@gmail.com
25 Ongoing Widening/Improvement to 4 -Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000 km) of Sagunbashi forest (near Nichinta) to starting of Krishnai Bypass Section (Package-7) of Bilasipura Guwahati road (NH 17) 11.90 286.72 24-03-2023 25-10-2023 82 76 25-10-2025 25-10-2025 Mayasheel Construction msc.pkg7@gmail.com
26 Ongoing Construction of Balance Work of 4-Laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg- IV: (Structures & Toll Plaza) from Km 490.800 to Km 534.800, under SARDP- NE , under EPC Mode in the state of Assam (with Toll Plaza at Ch.525.245) 98.07 19-08-2024 18-10-2024 27 19 13-10-2025 13-10-2025 Bhardwaj Unibuild Pvt. Ltd. bupljd4@gmail.com
27 Ongoing Construction of Balance Work of 4-Laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-II: Road Works from Km 501.800 to Km 514.800 (13.000 Km), under SARDP- NE under EPC Mode in the state of Assam 13.00 537.03 06-08-2024 10-10-2024 47 41 05-10-2025 05-10-2025 Bharat Vanijya Eastern Pvt. Ltd.(BVEPL) contact@bvepl.com
28 Ongoing Construction of Balance Work of 4-Laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-III: Road Works from Km 514.800 to Km 534.800 (20.000 Km), under SARDP- NE under EPC Mode in the state of Assam 20.00 615.74 06-08-2024 03-10-2024 48 44 28-09-2025 28-09-2025 Kaushal Sharma ksharma.tsk@gmail.com
29 Ongoing Construction of Balance Work of 4-Laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-I: Road Works from Km 490.800 to Km 501.800 (11.000 Km), under SARDP- NE under EPC Mode in the state of Assam 11.00 471.13 06-08-2024 03-10-2024 67 65 28-09-2025 28-09-2025 Regal Enterprises regaljdpkg1@gmail.com regal.jitender@gmail.com
30 Ongoing Widening & Improvement to 2-lane with Paved shoulder configuration of Dudhnoi - Dainadubi section (NH-217) under Bharatmala Pariyojana from design km 0+000 to km 8+415 (existing km 0+000 to km 8+600 of Old NH-62) in the State of Assam on EPC mode under NH(O)-NE, (Assam portion) 8.42 88.56 31-03-2023 26-03-2024 77 68 25-09-2025 25-09-2025 Shyama Construction shyamaconstructionnh217@gmail.com
31 Ongoing Widening & Upgradation to 2 lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 156.489 near P. Leikul to km 176.410 near Borowapu (Package-10) on EPC mode under NH (O)-NE (Assam portion) 19.92 693.15 31-03-2023 29-08-2023 66 59 29-08-2025 29-08-2025 Anusha Projects Pvt. Ltd.- BKD Infrastructures Pvt. Ltd. (JV) anushaprojects@gmail.com
32 Ongoing Widening & Upgradation to 2-lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 116.480 near Hangrum to km 136.500 near Hejaichak (Package-8) on EPC mode under NH(O)-NE (Assam portion) 20.02 904.04 31-03-2023 29-08-2023 68 60 29-08-2025 29-08-2025 Anusha Projects Pvt. Ltd.- BKD Infrastructures Pvt. Ltd. (JV) appl.tmr8@gmail.com
33 Ongoing Widening & Upgradation to 2 lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 136.500 near Hejaichak to km 156.489 near P. Leikul (Package-9) on EPC mode under NH(O)-NE (Assam portion) 19.99 614.43 31-03-2023 29-08-2023 69 51 29-08-2025 29-08-2025 KPC Projects Ltd. pc.nh137@kpc.co
34 Ongoing Construction of Balance Work of 4-Laning of NH-37 Section between End of Moran Bypass to Bogibeel junction near Lapetketa ((Km. 561.700-Km. 580.875) under SARDP-NE, Phase 'A' in the State of Assam on EPC mode Pkg-I: Road works & Toll Plaza 19.18 274.34 26-07-2024 16-09-2024 92 74 14-03-2025 31-07-2025 Mohan Lal Jain mljmobohw@gmail.com
35 Ongoing Construction of Balance Work of the 4-Laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-III: Road Works from Km 477.000 to Km 490+800 (13.800 Km), under SARDP- NE under EPC Mode in the state of Assam 13.80 358.72 15-01-2024 14-02-2024 96 93 11-08-2024 31-07-2025 M. P. (Mahabir Prasad) Agarwala Pvt. Ltd. mpagarwalapvtltd@gmail.com
36 Ongoing Up-gradation to 4-Laning of Jamugurihat to end of Biswanath Chariali By-Pass from Km 182.000 to Km 208.000 of NH-52 on EPC mode in state of Assam under SARDP-NE 26.00 735.17 13-10-2016 19-12-2016 98 92 19-06-2019 31-07-2025 T K Engineering Consortium Pvt. Ltd.(TKECPL) info@ganpatibharat
37 Ongoing Construction of Balance Work of 4-Laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-I: Road Works from Km 453+000 to Km 463+000 (10.000 Km), under SARDP- NE under EPC Mode in the state of Assam 10.00 478.30 15-01-2024 14-02-2024 95 89 11-08-2024 31-07-2025 Sadguru Engineers & Allied Services Pvt. Ltd. seaspvtltdghy@gmail.com
38 Ongoing Construction of Balance Work of 4-Laning of NH-37 Section between End of Moran Bypass to Bogibeel junction near Lapetketa ((Km. 561.700-Km. 580.875) under SARDP-NE, Phase 'A' in the State of Assam on EPC mode Pkg-II: Structures 55.96 26-07-2024 16-09-2024 87 70 14-03-2025 31-07-2025 Mehta Construction Co. mccmobostr@gmail.com
39 Ongoing Construction of Balance Work of the 4-Laning of the Section from Jorhat to Jhanji of NH-37 (Old) from Km 453.000 to Km 490.800, under SARDP- NE , under EPC Mode in the state of Assam : Pkg-IV (Structures & Toll Plaza) 279.01 15-01-2024 14-02-2024 94 89 11-08-2024 31-07-2025 Sadguru Engineers & Allied Services Pvt. Ltd. seaspvtltdghy@gmail.com
40 Ongoing 4-Laning of NH-37 Section between Demow to End of Moran Bypass (From Km. 534.800 to Km. 561.700) including Emergency Landing Facility (ELF) under SARDP-NE, Phase 'A' in the State of Assam on EPC mode 26.90 385.57 14-10-2022 20-01-2023 98 96 20-07-2024 31-07-2025 Mohan Lal Jain msmljaindurgapur@yahoo.com
41 Ongoing Construction of Balance Work of the 4-Laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-II: Road Works from Km 463.00 to Km 477.000 (14.000 Km), under SARDP- NE under EPC Mode in the state of Assam 14.00 438.44 15-01-2024 14-02-2024 93 83 11-08-2024 31-07-2025 Binni Construction binniconstruction73@gmail.com
42 Ongoing Widening/lmprovement to 4-Lane with Paved Shoulder from Dillai at Km 146+230 to Lahorijan at Km 157+46O (Design Chainage 145+712 to 156+502) of Dillai - Lahorijan (Package - 7) 10.79 204.10 02-09-2022 20-01-2023 97 95 20-07-2024 15-07-2025 Shankar Agarwal nh29pkg7sa@gmail.com
43 Completed Construction of 2-L Dibrugarh By Pass / realignment of NH-37 from Bogibeel Junction at km. 581.700 to km. 597.147 on EPC basis in the state of Assam under SARDP-NE 15.45 379.32 20-02-2015 02-11-2015 100 100 31-10-2018 ABCI Infrastructures-JKM Pvt. Ltd (JV) jkmdbrproject@gmail.com
jkmdibrugarhbypass@gmail.com
44 Completed Widening/Improvement to 4 -Lane with Paved Shoulder from Ch. 52.470km to Ch.71.500 km (Design Ch.48.655km to Ch.67.556km)of Tulungia-Jogighopa Bridge Approach Section of Bilasipura- Guwahati road (NH 17) on EPC (Package-5) 18.90 691.53 22-03-2021 09-07-2021 100 100 31-12-2022 Rajendra Singh Bhamboo Infra Pvt. Ltd. rajendrabhamboo@yahoo.co.in
45 Completed 4-Laning of NH-37 (New NH-127) from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode-Package-1 10.00 225.02 23-03-2020 01-07-2020 100 100 23-12-2021 PRL Projects & Infra Structure Ltd. rcplassam1@gmail.com, nagaonnh127@prlinfra.com
46 Completed Construction of 4-L Jia Bharali Bridge (1.23 Km at km 26+607) along with its approaches and River Training Work from km 25.552 to km 27.500 of NH-37A (New NH-715) (de-scoped portion of Dolabari and Jamuguri section/CoS work) 1.95 21-12-2020 17-02-2021 100 100 05-08-2023 MKC Infrastructure Ltd. - RSM Infra Projects (JV) dccindiaproject@gmail.com
47 Completed Widening/Improvement to 4-Lane with Paved Shoulder from km 81+000 to km 95+400 (Design Chainage 80+930 to 96+400) of Loring Thepi - Ganapath Gaur Gaon Section in the state of Assam under Bharatmala Pariyojana on EPC mode (Package-4) 15.47 260.07 03-02-2021 25-06-2021 100 100 17-12-2022 S S Builders ssbuilderspkg4@gmail.com,
48 Completed INFRASTRUCTURE WORK: Deveopment of Inland Water Transport (IWT) Terminal at MMLP Jogighopa 70.92 06-10-2021 22-04-2022 99 98 14-10-2023 DVP Infra Projects Pvt. Ltd. info@dvpinfra.com
49 Completed Rehabilitation & up-gradation to 4-Lane with Paved shoulder of Dergaon Town section from Km 426.800 to Km 437.400 on NH-37(New NH-715) in Assam on EPC basis 10.60 426.15 19-03-2020 30-06-2020 100 100 19-06-2022 Rajinder Infrastructure Pvt.Ltd. jornh37@gmail.com
ripl.chd@gmail.com
50 Completed One time improvement of Digboi to Ledo Town section (via Powal and Margherita ) of NH-38 from km 20.000 to km 53.000 in Assam on EPC Mode under NH(O) 33.00 30.84 29-07-2019 25-09-2019 100 100 23-09-2020 Ganpati Builders ganpatidib@gmail.com
op.sharma0082@gmail.com
ganpatibuilders0082@gmail.com
51 Completed 4-Laning from Km 0.000 (Kaliabor Tiniali road junction) to Km 17.300 (Dolabari Road Junction) including construction of new Brahmaputra Bridge of 3.015Km (from Ch. 9+325 to Ch. 12+365) alongside of existing Kaliabhomora Bridge of NH 37-A (New NH-715) on EPC basis under Phase A of SARDP-NE
(with Toll Plaza at Ch.7+050)
17.30 811.28 31-10-2014 29-11-2014 100 100 28-11-2018 Gammon India Ltd.- Satpal (S. P.) Singla construction Pvt. Ltd.[SPSCPL] (JV) manoj.rathore@gammonengineers.com
9303_newbrahmaputra.planing@
gammonengineers.com
52 Completed Widening/lmprovement to 4-Lane with paved shoulders from Km. 51+246 to Km. 66+000 (Design Chainage 50+710 Km to 65+923 Km) of Parokhuwa-Dokmoka section of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode (Package-2) 15.21 257.50 26-03-2021 12-07-2021 100 100 03-01-2023 P.D. Agrawal Infrastructure Ltd. -Apex Structure Pvt Ltd. (JV) apexcompany2009@yahoo.in
53 Completed INFRASTRUCTURE WORK: MMLP (Package-II: Building and Infrastructure works) 05-08-2020 30-09-2020 100 100 03-04-2022 Credible Engineering Construction Pvt. Ltd. credibleengineering@gmail.com
54 Completed Up-gradation to 4-Laning of NH-52A from Gohpur (Km 264.100 on NH-52) to Holongi (Km.20.370 on NH-52A) in Assam on EPC under SARDP-NE 10.08 223.30 30-03-2015 11-12-2015 100 100 10-12-2018 ECI Engineering & Constr. Co. Ltd. pmgohpur@eciecc.com
ecigohpur@gmail.com
55 Completed Widening/improvement to 4-Lane with paved shoulder from km. 606+300 to km 626+030 of NH-37 on existing Lahoal-Chabua Bypass i.e. Kandulibari Grant Gaon to Nalanihulla section in Assam on EPCMode under NH(O)-NE [Pkg.2] 19.73 170.95 05-04-2022 25-07-2022 100 99 24-07-2024 Jugal Kishore Mahanta Infra works (JKM) jkmahanta@jkminfra.net ,
jkmho@jiminfra.net ,
jkmdbrproject@gmail.com
56 Awarded, not Appointed Widening/lmprovement of Existing 2 lane to 4-Laning of Karimganj-Silchar section of NH-37 from Design Ch 0.000 near Silchar ISBT to Design Ch 15.970 near Kalinagar Pt I on NH-37 in Assam on HAM Mode (Pkg-1) 15.97 1181.55 11-03-2024 Jandu Silchar Highway Pvt. Ltd. jandu.panchgram@jinfratech.com
57 Completed 4-Laning of Balachera-Harangjao section of NH-54 (ext.) from km 275.00 to km 244.00 in the state of Assam under east west corridor project. 25.25 887.68 31-10-2017 26-12-2017 100 99 24-06-2020 Sushee Infra & Mining Limited - JSC Purpetruboprovodstroy (JSC PTPS) (JV) planning.balachera@gmail.com
58 Completed Improvement and Strenghtening of Road Section from Chand Khera to Kurti Bridge on NH-208A on (Assam-Tripura Border) in the state of Assam on EPC Mode under NH(O) 17.95 66.94 04-10-2016 28-11-2016 100 100 24-01-2018 Ganesh Ram Dokania
59 Completed 4-Laning of NH-37 (New NH-127) from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package - 2 8.40 20-03-2020 01-07-2020 100 100 23-12-2021 Ganga Sagar Singh
support@gss.org.in
60 Completed Widening/lmprovement to 4-Lane of Daboka Dimapur Stretch from Km 95+400 to Km 113+830 (Design Chainage 96+400 Km to 113+830 Km) of Ganpath Gaur Gaon- Kwaram Taro Vitlage in the state of Assam under Bharatmala Pariyojana on EPC mode (Package-5) 17.43 288.85 31-03-2021 12-07-2021 100 99 12-01-2023 B.K.Sons Infra Pvt. Ltd. info@bksonsinfra.com
61 Completed Widening / Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach (Package-II) of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) under JICA ODA Loan assistance (Phase-V) [Srirampur - Dhubri Pkg-2] 26.50 909.02 04-08-2022 02-01-2023 100 98 01-01-2025 J Infratech Limited (JIL) assam.pkg2@gmail.com
assam.pkg2@jinfratech.com
62 Awarded, not Appointed Widening/lmprovement to 4-Laning and Greenfield alignment with Paved shoulder of Silchar-Badarpur – Churaibari section of NH-37 & NH-8 from Design chainage 38.600 (End point of proposed Badarpur Bypass) to Km. 62.800 (Start point of proposed Nilambazar/Cheragi Bypass) in the state of Assam on HAM Mode (Package-4) 24.20 1319.55 11-03-2024 MKC Badarpur Churaibari Kamakhya (Pkg-4) Highways Pvt. Ltd. engineering@mkcinfrastructureltd.com
63 Completed 2-laning with paved shoulders from km 6.25 to 10.40 including RoB (Railway Over Bridge) at Srikona Railway Level Crossing at km 9.901 of Silchar- Badarpur section of NH-53 in state of Assam under SARDP-NE 4.15 76.78 23-03-2015 01-10-2015 100 100 11-12-2017 Shree Gautam Construction Company Ltd. sgcclsilchar@gmail.com
64 Completed 4-Lane highway connecting km 17.300 of old NH-37A (New NH-715) and km 182 of NH-52 (New NH-15) between Dolabari and Jamuguri Section in Assam on EPC basis under SARDP-NE, Phase-A 16.86 1049.51 05-11-2021 07-02-2022 100 100 08-08-2023 Sri Babul Nath mkcilrsmjv@gmail.com, jatin.s@rsminfra.in, jiabharali.dc@mkcinfrastructureltd.com
65 Completed Widening/Improvement to 4-Lane with Paved shoulder from km 66.00 to km 81.00 (Design Chainage 65.923 to 80.930) of Dokmoka - LoringThepi section- (Package-3) 15.01 266.26 10-08-2020 30-09-2020 100 100 24-03-2022 Skylark Infra Engg. Pvt. Ltd. pm.dokmoka@skylarkworld.com
66 Completed INFRASTRUCTURE WORK: MMLP (Pkg.-III : External Rail Connectivity) 3.76 09-10-2020 01-12-2020 93 82 01-06-2022 Sumcon Infraventures LLP gunjan@sumconinfraventures.com
67 Completed 4-Laning of Numaligarh to Jorhat section from Km. 402.500 to Km. 453.000 (Design Km 403.200 to Km 454.240) of NH-37 except construction of Dergaon bypass from Km 426.800 to Km 437.420 (Design Km 427.400 to 438.720) in Assam on EPC mode under SARDP-NE Phase-A (with Toll Plaza at Ch. 424+400 near Rangamati) 39.72 1655.44 31-10-2014 23-05-2015 100 100 22-05-2018 Hindustan Construction Company (HCC) njrp.pd@hccindia.com,
njrp.qclab@hccindia.com,
njrp@hccindia.com
68 Completed Construction and up gradation to 4-Lane of existing two lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to km 14.050 and (Design Km 0.000 to km 14.660), (Design length- 14.660 km) under BMP 14.66 224.85 26-03-2020 26-06-2020 98 93 26-12-2022 B.K.Sons Infra Pvt. Ltd. info@bksonsinfra.com
69 Completed One time improvement of Moran Town section of NH-37 from km 555.000 to km 558.500 in Assam on EPC Mode under NH(O) 3.50 14.52 31-05-2019 19-08-2019 100 100 17-08-2020 BB Enterprises binudborgohain1972@gmail.com
70 Completed Widening/Improvement to 4-Lane with paved shoulder from Ch.75.330Km to Ch.88.00km (Design Ch.71.800 to 84.100 km) of Jogighopa Bridge Approach (Near Pancharatna)- Agia (near Nichinta) section of Bilasipura-Guwahati road (NH-17) on EPC under BMP (Pkg. 6)
1 Toll Plaza at (Ch73+750 Km)
11.78 208.84 25-08-2020 26-10-2020 100 100 19-04-2022 Mayasheel Construction msc.pkg6@gmail.com
71 Completed INFRASTRUCTURE WORK: MMLP (Package-I: Road and Utility Works) 4.25 693.97 05-06-2020 30-09-2020 100 96 01-04-2022 RAM CHANDRA PAUL ram_chandrapaul@yahoo.in
72 Completed Up-gradation to 4-Laning from end of Biswanath Chariali by-pass (Km 208.000) to Gohpur (Km 265.500) of NH-52 (New NH-15) (Total length 57.50) in the state of Assam on EPC basis Under SARDP-NE
(with Toll Plaza at Ch. 219+200)
57.50 1099.35 18-10-2021 11-12-2021 100 100 14-06-2023 Dhatarwal Construction Company Pvt. Ltd. babulsayan@gmail.com ,babulnath40@gmail.com
dolabari.jamuguri@gmail.com
73 Completed Widening/Improvement to 4-Lane with Paved Shoulder from KM 113+300 to Km 146+230 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village - Dillai Section (Package-6) 31.88 625.64 10-09-2021 14-07-2022 100 98 13-07-2024 Ashoka Buildcon Ltd. ablnh29pkg6@ashokabuildcon.in
74 Completed Widening/improvement to 4-Lane with paved shoulder from km. 581+700 to km 606+300 of NH-37 on existing Dibrugarh-Lahoal-Chabua Bypass i.e. from Lepetketa to Kandulibari Grant Gaon section in Assam on EPCMode under NH(O)-NE [Pkg.1] 24.60 215.27 31-03-2022 25-07-2022 100 97 24-07-2024 Ganpati Builders op.sharma0082@gmail.com ,