Sorry, you need to enable JavaScript to visit this website.

Srirampur - Dhubri Road Pkg-II

Widening/Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane f

Project Status
Ongoing

Corridors: SRIRAMPUR – DHUBRI – PHULBARI Project status: Ongoing

Widening/Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane from Kachhukhana Harichara Paglagaunj to Dhubri-Phulbari bridge approach (Package-II) of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length = 26.504 Km) on EPC Mode in the state of Assam under JICA- ODA loan assistance.