Sorry, you need to enable JavaScript to visit this website.

Srirampur - Dhubri Road Pkg-I

Widening / Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road f

Project Status
Terminated

Corridors: SRIRAMPUR – DHUBRI – PHULBARI Project status: Terminated

Widening / Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Srirampur (near Bhairiguri Village) to Kachukhana Harichara Paglagaunj (Package-I) of Srirampur - Dhubri Section of NH-127B from existing Km 0.000 to Km 28.050 (Design Km 0.000 to Km 27.650), (Design Length=27.650 Km) under JICA ODA Loan assistance.