Rammandir to Tidding

Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 fro

Project Status
Ongoing

Corridors: Demwe-Hawai Project status: Ongoing

Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 from Design Km 0.000 to Km 2.910 (Existing Km 65.080 to Km 68.550) of total length 2.755 km excluding Tidding Bridge (155 m) in the State of Arunachal Pradesh on EPC mode