Sorry, you need to enable JavaScript to visit this website.

Joram-Koloriang Road Package 8

Construction of Balance Work of 2 lane with Paved shoulder of Joram-Koloriang Road (NH-713) on EP

Project Status
Ongoing

Corridors: Joram-Koloriang Project status: Ongoing

Construction of Balance Work of 2 lane with Paved shoulder of Joram-Koloriang Road (NH-713) on EPC basis from existing Km 138.000 to Km 158.00 [Design Km 122+353 to Km 138+389] (Package 8) [design length - 16.035 km] in the state of Arunachal Pradesh under SARDP-NE on EPC Mode