Construction of Balance Work of 2 lane with Paved shoulder of Joram-Koloriang Road (NH-713) on EP
Project Status
Ongoing
Construction of Balance Work of 2 lane with Paved shoulder of Joram-Koloriang Road (NH-713) on EP
Corridors: Joram-Koloriang Project status: Ongoing
Construction of Balance Work of 2 lane with Paved shoulder of Joram-Koloriang Road (NH-713) on EPC basis from existing Km 138.000 to Km 158.00 [Design Km 122+353 to Km 138+389] (Package 8) [design length - 16.035 km] in the state of Arunachal Pradesh under SARDP-NE on EPC Mode