Sorry, you need to enable JavaScript to visit this website.

Joram-Koloriang Road Package 7

Construction of Balance work of 2-Lane with P S of Joram – Koloriang Road from existing Km122.600

Project Status
Ongoing

Corridors: Joram-Koloriang Project status: Ongoing

Construction of Balance work of 2-Lane with P S of Joram – Koloriang Road from existing Km122.600 to km138.00 [Design Km108.724 to Km123.714] (Design length= 14.99km) (Pkg-VII) in the state of Arunachal Pradesh under SARDP-NE on EPC Mode