Construction of Balance work of 2-Lane with P S of Joram – Koloriang Road (NH-713) from existing
Project Status
Ongoing
Construction of Balance work of 2-Lane with P S of Joram – Koloriang Road (NH-713) from existing
Corridors: Joram-Koloriang Project status: Ongoing
Construction of Balance work of 2-Lane with P S of Joram – Koloriang Road (NH-713) from existing Km 70.00 to Km 88.700 [Design Km61.547 to Km78.724] (Pkg-IV) in the state of Arunachal Pradesh under SARDP-NE on EPC Mode