Construction of 2 Laning of existing Hunli-Anini from Design Km 120.000 to Km 130.300 (Total Leng
Project Status
Completed
Construction of 2 Laning of existing Hunli-Anini from Design Km 120.000 to Km 130.300 (Total Leng
Corridors: Meka-Roing-Hunli-Anini Project status: Completed
Construction of 2 Laning of existing Hunli-Anini from Design Km 120.000 to Km 130.300 (Total Length=10.300 Km) in the state of Arunachal Pradesh on EPC basis under SARDP-NE (Package-6)