Construction of 2 Laning of existing Hunli-Anini road on EPC basis from design Km 53.500 to Km 92
Project Status
Ongoing
Construction of 2 Laning of existing Hunli-Anini road on EPC basis from design Km 53.500 to Km 92
Corridors: Meka-Roing-Hunli-Anini Project status: Ongoing
Construction of 2 Laning of existing Hunli-Anini road on EPC basis from design Km 53.500 to Km 92.500 (Existing Km 56.320 to Km 97.650) in the state of Arunachal Pradesh under SARDP-NE (Package-3)