Sorry, you need to enable JavaScript to visit this website.

Archive Tenders

Sr. No. Descriptions State Bid Due Date Sort ascending Tender ID View Details
51 Short Term Maintenance for Landslide Debris Clearance from Km 368.00 to 468.00 of National Highway No.07 (Old NH-58) in the State of Uttarakhand Uttarakhand 05-06-2025 View Details
52 Balance work of Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 27+150 (Golai Goan) to km 47+682 (Ledo) on Dibrugarh to Ledo section with proposed Margherita & Ledo Bypass (Brownfield and Green Field) (2-Lane+PS) of NH-38 in Tinsukia District in the State of Assam on EPC mode.(Package-5) For Details Assam 02-06-2025 View Details
53 Short Term Maintenance Contract (STMC) from km 0.000 to km 20.300 and 22.000 to 23.000 (Total length 21.300 km) on road Udaipur to Melaghar (Spur NH-08) in the State of Tripura in the FY 2025-26 on percentage basis and work order basis. For Details Tripura 14-05-2025 View Details
54 Strengthening of Churachandpur to Imphal section of old NH-150 (new NH-02) from Churachandpur Police Station (km 402+000) to Malom Oil Depot Gate (km 454+798) in the State of Manipur on EPC mode under NH(O)-NE (Length-53.400 km) Manipur 07-05-2025 06fac View Details
55 Request for Proposal (RFP) for Engagement of Communication and Media Tracking & Analytics Agency for MoRTH Delhi 30-04-2025 6b440 View Details
56 Consultancy Services as Independent Engineer during Operation and Maintenance of Sonamarg Tunnel tunnel including approaches on Srinagar Sonamarg section connecting National Highway no. 1 in the UT of J&K on DBFOT annuity basis Union Territory of Jammu and Kashmir 30-04-2025 6ce59 View Details
57 Short Term maintenance for Restoration of Breach of formation on valley side & Slope Protectionnworks at Tangni-I (from Km. 454+650 to km. 454+800) and Tangni-II (from Km. 455+260 to Km.455+300) on NH-07 in the state of Uttarakhand under M&R. For Detail Uttarakhand 29-04-2025 View Details
58 Invitation of tender for Consultancy services for Authority’s Engineer for Supervision of: (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode. (iii) 4-Laning from Rangagara to Kaliabhor Tiniali from km 297.00 to km 315.315 of NH-37 on EPC basis. (iv) 4-Laning from Kaliabor Tinali to Dolabari section from Km 0.0 to Km 17.3 of NH 37-A including construction of new Brahmaputra bridge. (v) 4-Lane highway connecting km 17.3 of NH 37A and km 182 of NH 52 between Dolabari and Jamuguri on EPC basis. (vi) Construction of Jia Bharali Bridge (1.2Km) along with its approaches and River Training Work from km 25.552 to km 27.500 of NH-37A (New NH-715). (vii) Construction of Service road and RCC drain of from Kaliabor-Tinali (0.000) to Kolong Bridge (0+600) on EPC mode on NH-37 A Assam 28-04-2025 02fcd View Details
59 Consultancy Services for Authority’s Engineer for supervision of (i) Realignment from Ch. 0.00 to 2.00 Including Major Bridge (viaduct) of 680 m on Ranipool to Pakyong Road along NH-717A on EPC mode (ii) Construction/Upgradation of Existing Road to 2-Lane Paved shoulder including Geometric Improvement from Ranipool to Pakyong from Km 2.000 to Km 16.167 (Balance Work) of NH-717-A on EPC mode & (iii) Construction of 48m Chuba Khola Bridge from Km 75+300 to Km 75+800 on NH-10 on EPC basis in the State of Sikkim. Sikkim 28-04-2025 3900b View Details
60 RFP for Independent Engineer Services for 4 - Laning of Silchar (near Budha Nagar) at Existing Km 233+000 (D. Ch.24+560) to Jiribam at Existing km 212+060 (D. Ch. 37+650) of NH-37 (Length: 13.09 km) in the State of Assam and Manipur under NH(O)-NE on Hybrid Annuity Mode (HAM) (Pkg-2). For Details Assam 19-04-2025 View Details