Archive Tenders

Sr. No. Descriptions State Bid Due Date Sort ascending Bid Due Date - (Revised) Tender ID View Details
121 Special & Emergent Repair through Short Term Maintenance Contract on Vaghmun-Simlung existing stretch on NH-44A from Km 119.255 (Design Ch. 70.700) to Km 124.555 (Design Ch. 78.200) in the state of Tripura in F.Y 2025- 26 on percentage and work order basis. Tripura 24-07-2025 View Details
122 Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect to (a) Up gradation of existing 2L+PS of Agartala-Udaipur section to 4L+PS from Km 6.800 to Km 55.00 of NH-08 and (b) Development/ upgradation of Udaipur (NH-08) to Amarpur (Approx. length = 24 Km) in the State of Tripura on EPC basis Tripura 24-07-2025 View Details
123 Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Construction of 4-Lane with Paved Shoulder from Phulbari (Meghalaya) to Shillong in the State of Meghalaya. Meghalaya 24-07-2025 2025_NHIDC_863424_1 View Details
124 Consultancy Services as Authority’s Engineer for supervision of works including Specialized Slope protection works at various locations between Ch. 0+000 and Ch. 52+100 on NH-10 in the State of West Bengal- 2nd call. West Bengal 21-07-2025 2025_NHIDC_866278_1 View Details
125 RFP for Selection of Transaction Advisor for Development & Operations of Multi-modal Logistics Park at Jogighopa in PPP Mode Assam 21-07-2025 View Details
126 Widening/ Improvement of existing 2 lane to 4 (four) laning of Karimganj- Silchar section of NH-37 from Design Chainage Ch 0+000 near Silchar ISBT to Design Ch. 15+970 near Kalinagar Pt I on NH-37 in the state of Assam on HAM mode (Package-1) Assam 19-07-2025 View Details
127 Widening/Improvement of existing 2 lane to 4 (Four) lane and Greenfield alignment with Paved Shoulder of Silchar- Churaibari section of NH-37 & NH-8 from Design chainage Km. 38.600 (End point of proposed Badarpur Bypass) to Km. 62.800- (start point of proposed Nilambazar/ Cheragi Bypass) in the state of Assam on HAM mode-Package-IV” Assam 19-07-2025 View Details
128 Widening/Improvement to 4 (four) lane with paved Shoulder from existing road and Greenfield alignment (Design Ch 62.800 Km) to (Design ch. 87.700 Km) Start of proposed Nilambazar/Cheragi Bypass to Chandikhira of NH-8 in the state of Assam on HAM mode (Package-5) (Project length-24.900 Km) Assam 19-07-2025 View Details
129 Widening/Improvement of 4 (Four) Lane from existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. Ch. 106.500 Km) of Chandkhira Village- Churaibari Section of NH-8 in the state of Assam on HAM mode Package-VI (Project Length -18.80 Km) Assam 19-07-2025 View Details
130 Widening/Imrpovement to 4 (Four) lane of Karimganj - Sutarkandi section of NH-37 from Design Chainage 0.020 (Start of proposed Karimganj Bypass from NH-8) to Km 14.380 (Sutarkandi) Package-VII in the state of Assam on HAM mode (Project length - 14.360 Km) Assam 19-07-2025 View Details