| 1 |
Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of Upgradation of Aizawl to Thenzawl Road in the State of Mizoram
|
Mizoram |
16-07-2026 |
|
|
View Details |
| 2 |
Short Term Maintenance Contract works of NH-2 from Km 0.00 to Km 140.00, Seling to R. Tuivai under NHIDCL RO-Aizawl in the state of Mizoram for the year 2026-27.
|
Mizoram |
16-07-2026 |
|
|
View Details |
| 3 |
Maintenance of existing road section from Churachandpur to Tipaimukh of NH-02 from Km 70.00 to Km 185.00 in the State of Manipur, on item-rate and work-order basis, under risk and cost of the EPC Contractor. (4th Call)
|
Manipur |
13-07-2026 |
|
2026_NHIDC_915779_1 |
View Details |
| 4 |
Maintenance of existing road section from Churachandpur to Tipaimukh of NH-02 from Km 70.00 to Km 185.00 in the State of Manipur, on item-rate and work-order basis, under risk and cost of the EPC Contractor. (4th Call)
|
Manipur |
13-07-2026 |
|
|
View Details |
| 5 |
Emergent Maintenance work of the existing road of the project “Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode” at the Risk & Cost of the EPC Contractor” on Percentage Rate and work Order Basis (2nd Call)
|
Manipur |
09-07-2026 |
09-07-2026 |
|
View Details |
| 6 |
Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis” for Package-1: From Km 0+000 to Km 45+645 (Design Length – 45+645 Km)
|
Meghalaya |
08-07-2026 |
08-07-2026 |
|
View Details |
| 7 |
Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45+645 To Km 78+600, Design Length – 32.955 Km).
|
Meghalaya |
08-07-2026 |
08-07-2026 |
|
View Details |
| 8 |
Balance work under Risk and Cost for Construction and Upgradation of Existing Road to 2- Lane with Paved Shoulders including geometric improvement of section from Kafer to Lava more km 40.00 to km 61.100 of NH-717A in the state of West Bengal during the FY 2026-2027 (Package-VA) on percentage rate basis
|
West Bengal |
06-07-2026 |
06-07-2026 |
2026_NHIDC_909872_1 |
View Details |
| 9 |
Balance work under Risk and Cost for Construction and upgradation of Existing Road to 2- Lane with Paved Shoulders including geometric improvement of section from start of Bagrakot to Kafer km 13.00 to km 25.600 (Package- IVB) of NH-717A in the state of West Bengal during the FY 2026-2027 on percentage rate basis
|
West Bengal |
06-07-2026 |
|
2026_NHIDC_909903_1 |
View Details |
| 10 |
Construction of Remedial Measures for treatment of Sinking Zone at 72 locations in between Km 85+000 to Km 95+000 & Km 101+000 to Km 145+000 of Tura-Dalu section of NH-51 in the State of Meghalaya on EPC Mode
|
Meghalaya |
02-07-2026 |
22-06-2026 |
|
View Details |