71 |
Providing the Services of Vehicle On Monthly Basis to NHIDCL, SO-Ravangla (Sikkim)
|
Sikkim |
27-03-2025 |
00179 |
View Details |
72 |
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Reshi to Rhenock from Ch. 96.254 to Ch. 101.554 along NH-717A in the State of Sikkim on EPC mode
|
Sikkim |
26-03-2025 |
c291c |
View Details |
73 |
SELECTION OF CONSULTANTs/ NGOs TO ASSIST IN IMPLEMENTATION OF RESETTLEMENT ACTION PLAN FOR: Improvement & Widening to two lane with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) (Total length = 134.913 km) of NH-208 in the State of Tripura on Engineering Procurement & Construction (EPC) basis under Japan International Cooperation Agency (JICA) Official Development Assistance (ODA) Loan.
|
Tripura |
26-03-2025 |
22994 |
View Details |
74 |
One Time improvement under Restoration & Repair of Ukhrul Town Road from km 0 to km 9(Length-9 km) of NH-102A Ukhrul-Toloi-Tadubi Road in the State of Manipur in FY-2024-2025 on EPC mode(2nd Call)- International Competitive Bidding
|
Manipur |
26-03-2025 |
5fc9f |
View Details |
75 |
Project Management Consultancy Services for Widening to 2-lane with paved shoulder along with specialized slope protection works in vulnerable sinking/ sliding zones from Km 0.000 to 52.100of NH-10 (Sevoke-Rangpo section) in the State of West Bengal
|
West Bengal |
24-03-2025 |
850c3 |
View Details |
76 |
Short Term Maintenance for Temporary Mitigation Measures, including Toe Protection Works at Nandprayag Landslide Location (from Km 418.998 to Km 419.068 & from Km. 419.113 To Km. 419.223) on NH-07, in the State of Uttarakhand under M&R.
|
Uttarakhand |
21-03-2025 |
b2432 |
View Details |
77 |
Specialized Slope Protection Work of Section from Km. 25.600 to Km. 26.100 (Bagrakot - Kafer) of NH - 717 A in the State of West Bengal on EPC mode (Pkg-IVC)
|
West Bengal |
20-03-2025 |
c87ad |
View Details |
78 |
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder from Lavamore to Start of Pedong Bypass along NH-717A from existing km 61.100 to km 79.700 in the State of West Bengal on EPC Mode
|
West Bengal |
20-03-2025 |
c7083 |
View Details |
79 |
Four lanning of Mungiakami - Champaknagar section (NH-08) starting at km 421+850 (design chainage) and ending at km 447+300 (design chainage) (Length25.450 km) in the State of Tripura on Engineering, procurement & construction (EPC) mode
|
Tripura |
20-03-2025 |
27bdd |
View Details |
80 |
Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode
|
Manipur |
19-03-2025 |
6e391 |
View Details |