231 |
RFP for the work of Construction of Automated Multilevel Parking (Rotary System) at near National Hotel Tallital, Nainital in the State of Uttarakhand on EPC Mode including 10 years of Operation & Maintenance of Parking (as a deposit work of Govt of Uttarakhand
|
Uttarakhand |
19-06-2024 |
2024_NHIDC_795727_1 |
View Details |
232 |
RFP for Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC)
|
Nagaland |
12-06-2024 |
nhidcl/tender/9879e |
View Details |
233 |
RFP for the work of “Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157+200 to Km 157+500 along with other ancillary works on NH-29 in the State of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis.
|
Nagaland |
12-06-2024 |
nhidcl/tender/05cca |
View Details |
234 |
RFP for Independent Engineer Services for 4 (Four) Laning and Greenfield alignment of Karimganj - Silchar section of NH-37 from Design chainage 0.000 (Near ISBT, Silchar bypass) to Km. 15.970 (Kalinagar Pt I on NH-37) in the state of Assam on HAM mode. Package –I (Length- 15.970 km) Assam on Hybrid Annuity Mode.
|
Assam |
10-06-2024 |
|
View Details |
235 |
RFP for Independent Engineer Services for Four Laning of Badarpur – Churaibari section ofNH-37 & NH-8 from Design chainage 38.600(End of proposed Badarpur Bypass) to Km.62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hybrid Annuity Mode
|
Assam |
10-06-2024 |
|
View Details |
236 |
RFP for Independent Engineer services for supervision of Construction ofConstruction of 4-lane of NH-8 form Design Ch. 62.800 (start of proposed Nilambazar/Cheragi Bypass) to Design Ch. 87.700 near Chandkhira Village on Silchar-Churaibari Pkg-5 in the state of Assam on Hybrid Annuity Mode
|
Assam |
10-06-2024 |
|
View Details |
237 |
RFP for Independent Engineer services for supervision of Construction of 4 (Four) Lane with Paved Shoulder for existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. Ch. 106.500Km) of Chandkhira village – Churaibari section of NH-8 in the state of Assam on Hybrid Annuity Mode” (Package: VI) (Project Length – 18.80 km)
|
Assam |
10-06-2024 |
|
View Details |
238 |
RFP for Widening & Upgradation to 4-lane with paved shoulder from km 16.700 (end of Seer Hamdan Bypass) to km 39.450 (start of Pahalgam Bypass), Package-II of Khanabal - Pahalgam - Chandanwadi - Baltal section of NH-501 in the UT of Jammu & Kashmir on EPC Mode - reg.
|
Union Territory of Jammu and Kashmir |
01-06-2024 |
|
View Details |
239 |
RFP for Widening & Upgradation to 4-lane with paved shoulder from km 0.000 (Near Sursunoo village on NH-44) to km 16.700 (End of Seer Hamdan Bypass), Package-IA of Khanabal- Pahalgam- Chandanwadi- Baltal section of NH-501 in the UT of Jammu & Kashmir on EPC mode - reg.
|
Union Territory of Jammu and Kashmir |
01-06-2024 |
|
View Details |
240 |
RFP for Consultancy Services as Authority’s Engineer for Supervision of “Construction of Automated Multilevel Parking (Puzzle & Rotary System) at (i)Tehsil Office, Haridwar (ii) Lalita Rao Park, Haridwar (iii) Magistrate Office, Haridwar (iv) Ranipur to Tibri Underpass, Haridwar (v) Tehsil Office, Roorkee (vi) At near National Hotel Tallital, Nainital including of Operation & Maintenance in the State of Uttarakhand on EPC Mode (as a deposit work of State Govt of Uttarakhand)”
|
Uttarakhand |
29-05-2024 |
|
View Details |