Archive Tenders

Sr. No. Descriptions State Bid Due Date Sort ascending Bid Due Date - (Revised) Tender ID View Details
161 Hiring of commercial vehicle for office use of NHIDCL 01 (ONE) vehicle in District - Leh Ladakh 25-09-2025 10-10-2025 View Details
162 Providing ft supplying of 03 nos. vehicle (01 Innova Crysta or equivalent, 02 Scorpio or equivalent) on contract for NHIDCL, PMU-Shillong in the state of Meghalaya. Meghalaya 24-09-2025 View Details
163 Restoration & Repair work on NH-208 from km 49.200 to km 63.700 (Total Length – 14.500 Km) at various sections of Jurichhara to Bamanchara road (Pkg-III) at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis. Tripura 24-09-2025 View Details
164 Improvement of stretch by construction of side drain, construction of pipe culverts, R/walls, B/walls ,RCC drain and laying of bituminous carpeting incl. Installing of Road safety Item Metallic Crash Barrier, Retroreflective Sign Board, Road marking, Delinators & Road studs from Hasti (Ex.Km 97) to Kurya (Ex.Km 124) on Dulhasti -Kishtwar- Bandarkoot-Kuriya existing section of NH-244 in the UT of Jammu & Kashmir for FY 2025 -2026 Union Territory of Jammu and Kashmir 24-09-2025 View Details
165 Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 66.110 to km 101.280 (PKG-IV) in the state of Manipur on EPC mode. (ii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 101.280 to km 131.280 (PKG-V) in the state of Manipur on EPC mode. (iii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 131.280 to km 169.570 (PKG-VI) in the state of Manipur on EPC mode. (iv) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 169.570 to km 205.974 (PKG-VII) in the state of Manipur on EPC mode. Manipur 24-09-2025 View Details
166 Restoration & Repair work on NH-208 from km 0.000 to km 18.600 (Total Length – 18.600 Km) at various sections of Kumarghat to Kailashahar road at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis Tripura 23-09-2025 View Details
167 Construction of 2 Nos. of Major Bridge at Km. 508+414 and Km 523+271 in Jhanji to Demow section of NH37(Old) in State of Assam in FY:25-26 Assam 22-09-2025 View Details
168 Construction of left-over work (2-lane with paved shoulder) of the road stretch of Pkg-III at Kandni Village from design Ch. 0+000 to Ch. 4+037 (Ch. 70+900 to Ch. 74+650 of NH-244) in 4.037 km length on Khellani-Kishtwar-Chhatroo section of NH-244 in UT of Jammu & Kashmir on EPC Mode Union Territory of Jammu and Kashmir 22-09-2025 29-09-2025 View Details
169 One time improvement of Chandipur-Kanchanpur road of NH-44A from Km 75.500 to Km 86.000 in the state of Tripura in the FY 2025-26 on item rate basis & work order basis (Balance Work). Tripura 20-09-2025 View Details
170 One Time Improvement of the Bypassed section of Biswanath Chariali Town portion from Ch 201.100 to Ch 206.200 of NH-15 on Item rate basis in the State of Assam in FY-25-26 Assam 18-09-2025 View Details