| 151 |
Special Repair work on NH-208 from Km 75.700 to Km 101.30 (Total Length – 25.600 Km) at various sections i.e, Srirampur to Khowai section at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis.
|
Tripura |
07-07-2025 |
|
2025_NHIDC_860294_1 |
View Details |
| 152 |
Consultancy Services as Authority’s Engineer for supervision of works including Landslides Mitigation, Treatment and Road Maintenance Works in the highway section from km 368.00 to km 468.00 on NH-07 in the state of Uttarakhand
|
Uttarakhand |
07-07-2025 |
|
|
View Details |
| 153 |
Consultancy Services for preparation of Detailed Project Report for Consultancy Services for Preparation of Detailed Project Report for Construction of 4-Lane Access Controlled High Speed Corridor starting from Siliguri to Guwahati and connecting Jorabat in the States of West Bengal and Assam
|
West Bengal |
03-07-2025 |
07-08-2025 |
|
View Details |
| 154 |
Widening/Imrpovement to 4 (Four) lane of Karimganj - Sutarkandi section of NH-37 from Design Chainage 0.020 (Start of proposed Karimganj Bypass from NH-8) to Km 14.380 (Sutarkandi) Package-VII in the state of Assam on HAM mode (Project length - 14.360 Km)
|
Assam |
28-06-2025 |
|
|
View Details |
| 155 |
Widening/lmprovement of 4 (Four) Lane from existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. CHh. 106.500 Km) of Chandkhira Village- Churaibari Section of NH-8 in the state of Assam on HAM mode Package-VI (Project Length -18.80 Km).
|
Assam |
28-06-2025 |
|
|
View Details |
| 156 |
Widening/Improvement to 4 (four) lane with paved Shoulder from existing road and Greenfield alignment (Design Ch 62.800 Km) to (Design ch. 87.700 Km) Start of proposed Nilambazar/Cheragi Bypass to Chandikhira of NH-8 in the state of Assam on HAM mode (Package-5) (Project length-24.900 Km)
|
Assam |
28-06-2025 |
|
|
View Details |
| 157 |
Widening/lmprovement of existing 2 lane to 4 (Four) lane and Greenfield alignment with Paved Shoulder of Silchar- Churaibari section of NH-37 & NH-8 from Design chainage Km. 38.600 (End point of proposed Badarpur Bypass) to Km. 62.800- (start point of proposed Nilambazar/ Cheragi Bypass) in the state of Assam on HAM mode-Package-lV
|
Assam |
28-06-2025 |
|
|
View Details |
| 158 |
Widening/ Improvement of existing 2 lane to 4 (four) laning of Karimganj- Silchar section of NH-37 from Design Chainage Ch 0+000 near Silchar ISBT to Design Ch. 15+970 near Kalinagar Pt I on NH-37 in the state of Assam on HAM mode (Package-1)
|
Assam |
28-06-2025 |
|
|
View Details |
| 159 |
Widening/ Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km (Design Ch. 21.850 Km to Ch.48.670 Km) for Package-2 of Bilasipara-Guwahati Road (NH-17) (Section: Near Mowatari, before Chapar Bypass to Tulungia (junction with NH-117)) in the state of Assam on HAM Mode
|
Assam |
28-06-2025 |
|
|
View Details |
| 160 |
Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) (Km 901.100 to Km 921.145 of old NH-31) for Package1 of Bilasipara- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, before Chapar Bypass) in the State of Assam on HAM Mode.
|
Assam |
28-06-2025 |
|
|
View Details |