| 1 |
Restoration works under “Specialized Repairs” through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Mungiakami to Champaknagar due to August 2024 floods, based on the assessment report of technical consultant NIT Agartala in the State of Tripura in the FY 2025-26 on percentage basis and work order basis.
|
Tripura |
16-04-2026 |
16-04-2026 |
|
View Details |
| 2 |
BALANCE WORK OF STRENGTHENING OF UKHRUL TO CHOITHAR SECTION OF NH-202 FROM EXISTING KM 50+520 TO KM 59+236 (DESIGN CHAINAGE KM 45+600 TO KM 54+212) IN THE STATE OF MANIPUR ON EPC MODE UNDER NH(O)-NE (PACKAGE-4, LENGTH-8.612 KM)
|
Manipur |
15-04-2026 |
15-04-2026 |
|
View Details |
| 3 |
REQUEST FOR PROPOSAL for Engagement of Communication and Creative Agencies for NHIDCL (Limited Tender Enquiry)
|
Delhi |
15-04-2026 |
15-04-2026 |
|
View Details |
| 4 |
Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of “Construction of 2-lane specification road with paved shoulder including Tunnel (300 m) at Rabongla on NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package-III (Design Chainage from KM 32.500 to Km 33.600) under SARDP-NE Phase- ‘A’ on the EPC basis in the State of Sikkim”, under jurisdiction of PMU-Gyalshing, NHIDCL on Percentage Rate Contract Basis in the state of Sikkim- 2nd Call
|
Sikkim |
14-04-2026 |
|
|
View Details |
| 5 |
Performance based Maintenance Contracts (PBMC) work of 4- laning of Dimapur-Kohima Road from design Km 123.840 to Km 138.775, in the state of Nagaland under Package-I at “Risk & Cost” of EPC Contractor in FY: 2025 – 26
|
Nagaland |
14-04-2026 |
14-04-2026 |
|
View Details |
| 6 |
Improvement & Widening to two lane with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) (Total length = 134.913 km) of NH-208 in the State of Tripura on Engineering Procurement & Construction (EPC) basis under Japan International Cooperation Agency (JICA) Official Development Assistance (ODA) Loan.
|
Tripura |
13-04-2026 |
13-04-2026 |
|
View Details |
| 7 |
Widening/Up-Gradation of Intermittent Two Lane plus Paved Shoulder Stretches to Four Lane between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km 263+070) [Donipawa] of 9.866 Km Length on Khellani–Khanabal Section of NH-244 in the UT of Jammu & Kashmir
|
Union Territory of Jammu and Kashmir |
08-04-2026 |
08-04-2026 |
|
View Details |
| 8 |
Short Term Maintenance Contract (STMC) on NH-10 for the section from km 64 Singtam Bridge to km 80 Indian Oil Fuel Station Ranipool under the jurisdiction of PMU-Ranipool, NHIDCL on Percentage Rate Contract Basis for FY 2026-27 in the state of Sikkim
|
Sikkim |
07-04-2026 |
07-04-2026 |
|
View Details |
| 9 |
Short Term Maintenance Contract (STMC) on NH-10 for the section from km 53 Rangpo to Km 64 Singtam Bridge under the jurisdiction of PMURanipool, NHIDCL on Percentage Rate Contract Basis for FY 2026-27 in the state of Sikkim.
|
Sikkim |
07-04-2026 |
07-04-2026 |
|
View Details |
| 10 |
Short Term Maintenance work (STMC) from km 0.00 (Sevoke Army Cantonment) to km 14.000 (Sevoke Coronation bridge) including spot improvements on NH-10 (Sevoke-Rangpo section) in the State of West Bengal on Item Rate Basis during the FY 2025-26
|
West Bengal |
01-04-2026 |
01-04-2026 |
|
View Details |