Important Notice for Mandatory E-BG,EMD and Tender Fee Deposit through Induscollect
For EMD & Tender Fee Payment Click Here
For e-BG Click Here
Bid Due Date
Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Tender ID | View Details |
---|---|---|---|---|---|
21 | RFP for Selection of Transaction Advisor for Development & Operations of Multi-modal Logistics Park at Jogighopa in PPP Mode | Assam | 21-07-2025 | View Details | |
22 | Consultancy Services as Authority’s Engineer for supervision of works including Specialized Slope protection works at various locations between Ch. 0+000 and Ch. 52+100 on NH-10 in the State of West Bengal- 2nd call. | West Bengal | 21-07-2025 | 2025_NHIDC_866278_1 | View Details |
23 | Appointment of Safety Consultant for “Widening/ Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km (Design Ch. 21.850 Km to Ch.48.670 Km) for Package-2 of Bilasipara-Guwahati Road (NH-17) (Section: Near Mowatari, before Chapar Bypass to Tulungia (junction with NH-117)) in the state of Assam on HAM Mode - (Length- 26.82 km)” – 2nd Call | Assam | 19-07-2025 | View Details | |
24 | Widening/ Improvement of existing 2 lane to 4 (four) laning of Karimganj- Silchar section of NH-37 from Design Chainage Ch 0+000 near Silchar ISBT to Design Ch. 15+970 near Kalinagar Pt I on NH-37 in the state of Assam on HAM mode (Package-1) | Assam | 19-07-2025 | View Details | |
25 | Appointment of Safety Consultant for “Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000 km to Ch. 17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, before Chapar Bypass) in the state of Assam on HAM mode - (Length- 17.74 km)” – 2nd Call. | Assam | 19-07-2025 | View Details | |
26 | Widening/Improvement to 4 (four) lane with paved Shoulder from existing road and Greenfield alignment (Design Ch 62.800 Km) to (Design ch. 87.700 Km) Start of proposed Nilambazar/Cheragi Bypass to Chandikhira of NH-8 in the state of Assam on HAM mode (Package-5) (Project length-24.900 Km) | Assam | 19-07-2025 | View Details | |
27 | Widening/Imrpovement to 4 (Four) lane of Karimganj - Sutarkandi section of NH-37 from Design Chainage 0.020 (Start of proposed Karimganj Bypass from NH-8) to Km 14.380 (Sutarkandi) Package-VII in the state of Assam on HAM mode (Project length - 14.360 Km) | Assam | 19-07-2025 | View Details | |
28 | Improvement to 4 (Four)Lane with Paved Shoulder from existing 260+000 (Design Ch.4+560 km) to existing km Ch.233+000 (D. Ch.24+560) of Silchar (near Nutan Dayapur village) - Budha Nagar Section (Length-20.00 Km) of NH-37 under Package: SJ-1 in the state of Assam on HAM Mode. | Assam | 19-07-2025 | View Details | |
29 | Widening/Improvement of existing 2 lane to 4 (Four) lane and Greenfield alignment with Paved Shoulder of Silchar- Churaibari section of NH-37 & NH-8 from Design chainage Km. 38.600 (End point of proposed Badarpur Bypass) to Km. 62.800- (start point of proposed Nilambazar/ Cheragi Bypass) in the state of Assam on HAM mode-Package-IV” | Assam | 19-07-2025 | View Details | |
30 | Widening/Improvement of 4 (Four) Lane from existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. Ch. 106.500 Km) of Chandkhira Village- Churaibari Section of NH-8 in the state of Assam on HAM mode Package-VI (Project Length -18.80 Km) | Assam | 19-07-2025 | View Details |