Sorry, you need to enable JavaScript to visit this website.

Current Tenders

Sr. No. Descriptions State Bid Due Date Sort ascending Tender ID View Details
1 Widening of Valley side at km 20.900, km 35.500 and km 36.700 and culvert at 13 locations viz. km 17.600, km 17.800, km 18.300, km 20.200, km 21.500, km 21.650, km 21.850, km 32.800, km 33.100, km 38.300, km 40.300, km 43.700, km 47.300 on NH-10 on EPC mode in the State of West Bengal West Bengal 25-08-2025 View Details
2 Construction of Intermediate Lane of Pango to Jorging Road from Design Km 40+000 to Design Km 82+060 section of frontier Highway (NH-913) (Design Length: 42.06 Km, Package-II, Greenfield Alignment) in the State of Arunachal Pradesh on EPC mode. Arunachal Pradesh 21-08-2025 View Details
3 Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 13+080(Total length:13.080 km) of Tuting -Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode. Arunachal Pradesh 21-08-2025 View Details
4 Short Term Maintenance Contract for Hill cutting across the Chathe river at Ch 126.100 to Ch 126.200 in Dimapur Kohima road section on NH-29 in the state of Nagaland in FY: 2025-26 (Percentage Rate and work Order Basis) Nagaland 12-08-2025 View Details
5 Consultancy service for Authority's Engineer for Improvement & Widening to two lane with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) (Total length = 134.913 km) of NH-208 in the State of Tripura on Engineering Procurement & Construction (EPC) basis under Japan International Cooperation Agency (JICA) Official Development Assistance (ODA) Loan Tripura 08-08-2025 View Details
6 Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 66.610 to km 101.280 (Existing Chainage from km 67.496 to km 103.557) (PKG-IV) in the state of Manipur on EPC mode. (ii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 101.280 to km 131.280 (Existing Chainage from km 103.557 to km 134.821) (PKG-V) in the state of Manipur on EPC mode. (iii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 131.280 to km 169.570 (Existing Chainage from km 134.821 to km 175.105) (PKG-VI) in the state of Manipur on EPC mode. (iv) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 169.570 to km 205.974 (Existing Chainage from km 175.105 to km 214.289) (PKG-VII) in the state of Manipur on EPC mode Manipur 06-08-2025 View Details
7 Specialized Slope Protection Work of Section from Km. 25.600 to Km. 26.100 (Bagrakot - Kafer) of NH - 717 A in the State of West Bengal on EPC mode (Pkg-IVC) [2nd Call] West Bengal 04-08-2025 View Details
8 Consultancy Services for Preparation of Detailed Project Report for Construction of 4-Lane with Paved Shoulder, High Speed Corridor from Guwahati (near Jorabat) to Barapani ( near Mawlyngkhung) in the State of Meghalaya Meghalaya 30-07-2025 View Details
9 Providing the Services of Commercial Vehicle On Monthly Basis to NHIDCL, PMU-Gyalshing (Sikkim) Sikkim 29-07-2025 View Details
10 Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Reshi to Rhenock from Ch. 96.254 to Ch. 101.554 along NH-717A in the State of Sikkim on EPC mode (2nd call) Sikkim 28-07-2025 View Details