Important Notice for Mandatory E-BG,EMD and Tender Fee Deposit through Induscollect
For EMD & Tender Fee Payment Click Here
For e-BG Click Here
Bid Due Date
Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Bid Due Date - (Revised) | Tender ID | View Details |
---|---|---|---|---|---|---|
1 | One Time improvement under Restoration & Repair of Ukhrul Town Road from km 0.00 to km 09.00 (Length-9.00 km) of NH-102A in the State of Manipur on EPC mode & One time improvement under Restoration and Repair of Ukhrul-Jessami road (i.e., Existing Lunghar Village Road) section from Km 0.00 to Km 3.40 (Length 3.40 Km) on NH-202 in the State of Manipur on EPC mode. | Manipur | 14-11-2025 20:30:00 | View Details | ||
2 | Restoration & Repair work on NH-208 from km 36.000 to km 72.000 (Total Length – 36.000 Km) at various locations of existing road of Rangamati to Patichhari raod section (Pkg-III) at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis | Tripura | 03-11-2025 22:30:00 | View Details | ||
3 | Short term maintenance contract of NH-08 between ch.343+000 to ch.397+000 (road maintenance work between ch.375+000 to ch.397+000, i.e. total 13.5km in different stretches & road safety work in total 54 km i.e., from Ch. 343+000 to Ch. 397+000 in non DLP stretches) in the State of Tripura in the year 2025-26 on percentage basis and work order basis. | Tripura | 30-10-2025 22:30:00 | View Details | ||
4 | Widening to 2 (two) lane with paved shoulder of the balance work of Imphal-Jiribam Section of NH-37 from Design Chainage km 3.275 to km 15.940 (Length - 12.665 km) Pkg-1 in the State of Manipur on EPC mode | Manipur | 30-10-2025 20:30:00 | View Details | ||
5 | Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82+675 and Km 82+925 on NH-244 in the UT of J&K on EPC mode | Union Territory of Jammu and Kashmir | 30-10-2025 20:30:00 | View Details | ||
6 | Performance based Maintenance Contracts (PBMC) work of AsianHighway 02 (Ch. 0+000 to 1+500) from Nepal Border Mechi Bridge and approaches on India-Nepal border linking Kakarvitta in Nepal and Panitanki in India in the state of West Bengal in FY: 2025 - 26 |
West Bengal | 28-10-2025 22:30:00 | View Details | ||
7 | Restoration & Repairs by way of clearance of landslide, surface boulders, side drain, construction of pipe culverts, R/walls, B/walls ,RCC drain and laying of bituminous carpeting incl. Installing of Road safety Item Metallic Crash Barrier, Retroreflective Sign Board, Road marking, Delineators & Road studs from existing Km. 97.000 to Km. 123.500 on Dulhasti - Kishtwar- Bandarkoot-Kurya existing section of NH-244 in the UT of Jammu & Kashmir for FY 2025 -2026 through Performance Based Maintenance Contract (PBMC) | Union Territory of Jammu and Kashmir | 22-10-2025 20:30:00 | View Details | ||
8 | CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) "WIDENING AND UP-GRADATION OF EXISTING CARRIAGEWAY INTO 2-LANE WITH PAVED SHOULDER FROM LAVAMORE TO START OF PEDONG BYPASS ALONG NH-717A FROM KM 61.100 TO KM 79.700 IN THE STATE OF WEST BENGAL ON EPC MODE & (II) WIDENING AND UP-GRADATION OF EXISTING CARRIAGEWAY INTO 2-LANE WITH PS CONFIGURATION FROM RESHI TO RHENOCK FROM CH. 96.254 TO CH. 101.554 ALONG NH- 717A IN THE STATE OF SIKKIM ON EPC MODE | Sikkim | 13-10-2025 20:30:00 | 21-10-2025 | View Details | |
9 | CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION AND UPGRADATION OF EXISTING ROAD ON NH-510 BETTWEEN RABANGLA TO GYALSHING TO 2-LANE WITH PAVED SHOULDER CONFIGURATION IN THE STATE OF SIKKIM UNDER SARDP-NE PHASE ‘A’ ON EPC MODE: (1) KM 32.500 TO KM 33.600 (PACKAGE-III) (2) KM 33.600 TO KM 58.840 (PACKAGE-IV) (3) KM 58.840 TO KM 75.00 (PACKAGE-V) (4) KM 75.000 TO KM 90.210 (PACKAGE-VI) | Sikkim | 13-10-2025 20:30:00 | 21-10-2025 | View Details | |
10 | Notice Inviting Bid for Renting Office Premises of NHIDCL, Site office, under PMU-Siliguri, near Teesta Bazaar in the District of Darjeeling & Kalimpong in the State of West Bengal. | West Bengal | 08-10-2025 18:30:00 | 16-10-2025 | View Details |