Important Notice for Mandatory E-BG,EMD and Tender Fee Deposit through Induscollect
For EMD & Tender Fee Payment Click Here
For e-BG Click Here
Bid Due Date
Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Tender ID | View Details |
---|---|---|---|---|---|
11 | Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Reshi to Rhenock from Ch. 96.254 to Ch. 101.554 along NH-717A in the State of Sikkim on EPC mode (2nd call) | Sikkim | 28-07-2025 | View Details | |
12 | Notice Inviting Bid for Renting Office Premises of NHIDCL, PMU under RO-Shillong, in the State of Meghalaya. | Meghalaya | 28-07-2025 | View Details | |
13 | Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH- 129A from Design Km 173.850 to Km 190.850 (Length – 17.000 Km) in the State of Nagaland on EPC mode (Package-V) under NH (O)-TSP | Nagaland | 25-07-2025 | View Details | |
14 | RFP for Engagement of Communication and Media Tracking & Analytics Agency for MoRTH. | Delhi | 25-07-2025 | View Details | |
15 | Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH129A from Design Km 173.850 to Km 190.850 (Length – 17.000 Km) in the State of Nagaland on EPC mode (Package-V) under NH (O)-TSP | Nagaland | 25-07-2025 | View Details | |
16 | Special & Emergent Repair through Short Term Maintenance Contract on Vaghmun-Simlung existing stretch on NH-44A from Km 119.255 (Design Ch. 70.700) to Km 124.555 (Design Ch. 78.200) in the state of Tripura in F.Y 2025- 26 on percentage and work order basis. | Tripura | 24-07-2025 | View Details | |
17 | Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect to (a) Up gradation of existing 2L+PS of Agartala-Udaipur section to 4L+PS from Km 6.800 to Km 55.00 of NH-08 and (b) Development/ upgradation of Udaipur (NH- 08) to Amarpur (Approx. length = 24 Km) in the state of Tripura on EPC basis. | Tripura | 24-07-2025 | View Details | |
18 | Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Construction of 4-Lane with Paved Shoulder from Phulbari (Meghalaya) to Shillong in the State of Meghalaya. | Meghalaya | 24-07-2025 | 2025_NHIDC_863424_1 | View Details |
19 | Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect to (a) Up gradation of existing 2L+PS of Agartala-Udaipur section to 4L+PS from Km 6.800 to Km 55.00 of NH-08 and (b) Development/ upgradation of Udaipur (NH-08) to Amarpur (Approx. length = 24 Km) in the State of Tripura on EPC basis | Tripura | 24-07-2025 | View Details | |
20 | Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder from Lavamore to Start of Pedong Bypass along NH-717A from km 61.100 to km 79.700 in the State of West Bengal on EPC Mode (2nd Call) | West Bengal | 21-07-2025 | View Details |