| 1 |
Ongoing |
Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode (Pkg-3)
|
61.50 |
1418.67 |
30-10-2024 |
18-07-2025 |
1 |
0 |
17-07-2028 |
17-07-2028 |
|
Bhartia Infra Projects Limited(BIPL) |
biplpkg003@gmail.com |
| 2 |
Ongoing |
Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode (Package-I)
|
53.00 |
1262.43 |
13-12-2024 |
01-03-2025 |
10 |
9 |
29-02-2028 |
01-03-2028 |
|
Bhartia Infra Projects Limited(BIPL)-Shivam Transcon Pvt. Ltd. (JV) |
shivambhartiajv@gmail.com |
| 3 |
Ongoing |
Construction of 2-Laning with hard shoulders of Demwe-Brahmakund section of NH-13 from Ch.0.00 km to 18.464 km on EPC under SARDP-NE (NH(O)-NE) -Balance Work
|
18.46 |
353.48 |
31-03-2025 |
19-06-2025 |
8 |
0 |
18-12-2027 |
18-12-2027 |
|
SPICA Projects & Infrastructures Pvt. Ltd. |
spicaprojectspvtltd@gmail.com |
| 4 |
Ongoing |
Construction of lntermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 53.040 (Existing Length:68.500 Km & Total Design length 53.04 km) of Tato to Monigong section of NH-913 (Frontier Highway) on Nafra (Bomdila) to Vijaynagar along China border in state of Arunachal pradesh on EPC mode |
53.04 |
625.61 |
15-03-2024 |
15-05-2025 |
14 |
10 |
14-11-2027 |
14-11-2027 |
|
ABCI Infrastructures Pvt. Ltd.-Brand Eagles (JV) |
abcibe.jv@gmail.com |
| 5 |
Ongoing |
Construction of Intermediate Lane of Pango to Jorging Road from 0+000 to Design Km Design Km 40+000 (Design Length: 40.00 Km, Pkg-l, Greenfield Alignment) in the State of Arunachal Pradesh on EPC mode (Pkg-1) |
40.00 |
898.19 |
10-09-2024 |
14-01-2025 |
24 |
24 |
16-07-2027 |
16-07-2027 |
|
TTC Infra India |
ttcii.pango@gmail.com |
| 6 |
Ongoing |
Construction of Intermediate Lane Road with hard shoulder from design Km 0.000 to Km 17.387 (Total length 17.387 km) of Hunli to Ithun Bridge section on NH-913 (Frontier Highway) in State of Arunachal Pradesh” on EPC mode under NH(O)-NE
|
17.38 |
275.50 |
15-03-2024 |
30-01-2025 |
22 |
19 |
30-01-2027 |
30-01-2027 |
|
J Infratech Limited (JIL) |
infojcipl@gmail.com |
| 7 |
Ongoing |
Roing-Hunli Road (Greenfield Alignment Project) |
74.86 |
1718.59 |
24-03-2017 |
05-03-2018 |
79 |
75 |
04-03-2022 |
31-03-2026 |
|
Dineshchandra R. Agarwal Infracon Pvt. Ltd. (DRAIPL) - Iron Triangle (ITL) (JV) |
roymonpm1962@gmail.com |
| 8 |
Ongoing |
Construction of 2-Laning with hard shoulders of Hayuliang– Hawai bypass Road on EPC basis from design Km. 51.825 to Km. 63.131 (Existing Km 45.050 of Hayuliang–Hawai road to Hawai Town) under SARDP-NE -Balance work (Pkg - IV)
|
11.30 |
216.76 |
31-03-2021 |
03-05-2021 |
93 |
93 |
02-05-2023 |
19-02-2026 |
|
Poddar Infratech Pvt. Ltd. - GRRB Associates (JV) |
poddargrrb@gmail.com |
| 9 |
Ongoing |
Construction of 1 Major bridge at Existing Ch. 23+650 (Design Ch. 23+550) of bridge span 160 m along the Existing Hunli-Anini Road (Pkg.1) on EPC Mode
|
0.16 |
30.00 |
28-09-2021 |
17-12-2021 |
90 |
86 |
19-06-2023 |
15-02-2026 |
|
Poddar Infratech Pvt. Ltd. |
varun@poddarinfra.com |
| 10 |
Ongoing |
Construction of Balance work of 2-Lane with PS of Joram-Koloriang Road (NH-713) on EPC basis from Design Km 44.989 to Km 61.547 (Existing Km 50.050 to Km 70.000) in the state of Arunachal Pradesh under SARDP-NE (Pkg-3)
|
16.56 |
228.72 |
10-08-2020 |
01-10-2020 |
100 |
98 |
02-04-2022 |
31-01-2026 |
|
Valecha Engg. Ltd. |
contracts@valecha.in |
| 11 |
Ongoing |
Construction of Balance work of 2-Lane with PS of Joram – Koloriang Road from existing Km122.600 to km138.00 [Design Km108.724 to Km123.714] in Arunachal Pradesh on EPC Mode under SARDP-NE (Pkg-7)
|
14.99 |
184.89 |
07-08-2020 |
01-10-2020 |
99 |
98 |
02-04-2022 |
31-01-2026 |
|
Jainco Enterprises Pvt. Ltd. |
jainco.kota@gmail.com, arunachaljainco@gmail.com |
| 12 |
Completed |
Construction of 2-Laning with hard shoulder road of Ram- Mandir to Arrowa section (left over portion of Arrowa- Khupa) of NH-113 from Design Km 0.000 to Km 2.910 (Existing Km 65.080 to Km 67.990) of total length 2.755 km excluding Tidding Bridge (155 m) on EPC mode
|
2.76 |
46.90 |
15-03-2024 |
28-06-2024 |
100 |
98 |
28-12-2025 |
28-12-2025 |
28-12-2025 |
GRRB Associates |
grrb.tezu.hayuliang@gmail.com |
| 13 |
Completed |
Rehabilitation/ Restoration (One Time Improvement) of Hunli -Anini Road on NH-313 from km 0.00 to km 21.500 in the State of Arunachal Pradesh on EPC basis.
|
21.50 |
23.56 |
22-02-2019 |
10-10-2019 |
100 |
100 |
09-10-2020 |
|
06-01-2021 |
Nani Mamung Enterprises(NME)-N.M. Enterprises (JV) |
n.menterprises.n751@gmail.com |
| 14 |
Completed |
Construction of 2-lane of Hunli-Anini road from Design Km 92.500 to Km 106.200 (Existing Km 97.670 to Km 111.600) on EPC basis under SARDP-NE (Pkg.-4)
|
13.70 |
188.78 |
14-12-2016 |
19-01-2017 |
100 |
100 |
18-01-2020 |
|
15-10-2022 |
Sushee Infra & Mining Limited |
ttc.hapkg6@gmail.com |
| 15 |
Completed |
Construction of 2-lane with hard shoulder of Akajan-Likabali-Bame road from existing km 71.00 to km 99.00 (Design Km 65.810 to Km 91.928) in the state of Arunachal Pradesh under SARDP-NE (Pkg-3)
|
26.12 |
323.49 |
31-03-2017 |
21-03-2018 |
100 |
100 |
19-03-2021 |
|
23-12-2022 |
SCIW-Shivam Transcon Pvt. Ltd. (JV) |
sciwshivamjv.nhidcl@gmail.com |
| 16 |
Completed |
2-Laning from Mahadevpur to Buri Dihing Bridge point section of NH-52B (New NH-215) of the stretch from 0.00 km. to 25.135 km in Arunachal Pradesh under Arunachal Pradesh package of SARDP-NE on EPC mode
|
25.13 |
136.60 |
31-03-2015 |
30-05-2015 |
100 |
100 |
30-05-2018 |
|
21-05-2018 |
Dineshchandra R. Agarwal Infracon Pvt. Ltd. (DRAIPL) - Puna Hinda (JV) |
punahinda@gmail.com |
| 17 |
Completed |
Construction of Balance work of 2-Lane with P S of Joram – Koloriang (NH-713) on EPC basis from existing km 88.700 to 104.850 [Design km. 78.724 to Km 93.724] in the state of Arunachal Pradesh under SARDP-NE (Pkg-5)
|
15.00 |
229.70 |
14-08-2020 |
01-10-2020 |
100 |
100 |
02-04-2022 |
|
06-11-2023 |
Bhimji Velji Sorathia Construction Pvt. Ltd. |
kuvraji@yahoo.com, kbh@bvscpl.in, gm.jkroad@bvscpl.in |
| 18 |
Completed |
2-Laning from Pasighat to Pangin section of NH-229 (New NH-13) from km 41.3 to 58.420 (Existing Km 982.85 to Km 998.85 of Existing 16Km) (Section-III) under Arunachal Pradesh Package of SARDP-NE on EPC Mode
|
17.12 |
247.44 |
27-03-2015 |
27-05-2015 |
100 |
100 |
25-05-2018 |
|
31-07-2020 |
T.K. Engineering Consortium Pvt. Ltd. (TKECPL) |
tkeconltd@gmail.com, debajitdz501@gmail.com |
| 19 |
Awarded, not Appointed |
lmprovement and Widening to 2 lane with paved Shoulder of NH-15 (old NH-52) from Existing Km 770.600 (Design Km 24.819) to Existing km 805.750 (Design Km 59.885) (Kamlang T-Junction to Chowkham, Existing Length: 35.150 Km, Design Length-35.066 Km) in the state of Arunachal Pradesh on EPC mode (Pkg-2)
|
35.07 |
316.73 |
31-03-2025 |
|
|
|
|
|
|
Jayshree lnternational - BK Construction (JV) |
jayshreegroupttd@gmait.com |
| 20 |
Completed |
Construction of 2-lane existing Hunli-Anini road from Design km. 37.500 to Km. 53.500 (Existing km 40.160 to 56.320) on EPC basis under SARDP-NE (Pkg-2)
|
16.00 |
259.52 |
06-05-2016 |
07-10-2016 |
100 |
100 |
06-10-2019 |
|
19-12-2019 |
Madhucon Projects Limited |
gm.bd@madhucon.com |
| 21 |
Completed |
2-Laning of existing Akajan-Likabali- Bame Road on EPC basis from design Km.12+000 to Km. 33+000 (existing Km.12+000 to Km.36+000) in the state of Arunachal Pradesh under SARDP-NE (Pkg-1)
|
21.00 |
210.50 |
02-11-2015 |
20-01-2016 |
100 |
99 |
18-01-2019 |
|
11-10-2021 |
Jugal Kishore Mahanta Infra works (JKM)-Keti Constructions Limited (KCL) (JV) |
jkmlikabali@gmail.com |
| 22 |
Completed |
2-Lanning from Changlang/Tirap District Boundary to Khonsa of NH 52B (New NH 215) (Length 42.844 km) i in Arunachal Pradesh under Arunachal Pradesh package of SARDP-NE Phase-II on EPC mode
|
42.84 |
438.32 |
01-03-2016 |
15-06-2016 |
100 |
100 |
14-06-2019 |
|
04-03-2019 |
M.G. Contractors Pvt. Ltd.(MGCPL)-H.G. Infra Engineering Pvt. Ltd.(HGIEPL) (JV) |
delhi@mgcpl.com |
| 23 |
Ongoing |
Construction of Balance Work of 2-Lane with Paved Shoulders of Joram-Koloriang Road (NH-713) on EPC basis from existing km 138.000 to km158.000 [Design km. 122.353 to km. 138.389] in the state of Arunachal Pradesh under SARDP-NE (Pkg-8)
|
16.03 |
244.10 |
07-03-2022 |
07-05-2022 |
97 |
95 |
06-11-2023 |
|
23-12-2024 |
Puna Hinda, Jainco Enterprises |
jainco.kota@gmail.com, arunachaljainco@gmail.com |
| 24 |
Completed |
2-Laning with hard shoulders of Hayuliang – Hawai Road on EPC basis from design Km. 17.000 (Khupa) to Km. 34.000 [Existing Km 16.950 to Km 34.310 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh under SARDP-NE (Pkg-II)
|
17.00 |
252.79 |
23-03-2017 |
10-11-2017 |
100 |
100 |
08-11-2020 |
|
31-01-2023 |
Sushee Infra & Mining Limited |
susheehayuliang@gmail.com, puttakishore333@gmail.com |
| 25 |
Completed |
Construction of 2-lane of Hunli-Anini road from Design km.106.200 to Km.120.00 on EPC basis under SARDP-NE (Pkg-5)
|
13.80 |
200.44 |
14-12-2016 |
19-01-2017 |
100 |
100 |
19-01-2020 |
|
15-09-2023 |
Sushee Infra & Mining Limited |
puttakishore333@gmail.com |
| 26 |
Completed |
Construction of 2-Lane with Paved shoulder of Joram – Koloriang Road (NH-713) from design Km. 20+000 to Km. 32+050 (Existing Km 20.000 to Km 35.150) in Arunachal Pradesh on EPC Mode under SARDP-NE (Pkg-1)
|
12.05 |
175.65 |
24-03-2017 |
22-04-2020 |
100 |
99 |
20-04-2022 |
|
28-02-2022 |
T.K. Engineering Consortium Pvt. Ltd. (TKECPL)-Brand Eagles(BE) (JV) |
debajitdz501@gmail.com |
| 27 |
Completed |
2-Laning from Bordumsa-Namchik (Buri Dihing-Jairampur) road of NH-52B (New NH-215) from Km 0.15 km (starting Chainage near Buridihing Bridge) to km 22.380 in Arunachal Pradesh under Arunachal Pradesh package of SARDP-NE on EPC Mode
|
22.23 |
189.91 |
23-07-2015 |
23-10-2015 |
100 |
100 |
22-10-2018 |
|
05-08-2018 |
Bhartia Infra Projects Limited(BIPL)-Bharat Vanijya Eastern Pvt. Ltd.(BVEPL) (JV) |
biplbvepljv@rediffmail.com |
| 28 |
Completed |
Construction of Balance work of 2-Lane with P S of Joram – Koloriang Road (NH-713) on EPC basis from existing km 104.850 to km 122.600 [Design km. 93.724 to km. 108.724] (Design length – 15 km) in the state of Arunachal Pradesh under SARDP-NE (Pkg-6)
|
14.60 |
199.03 |
17-08-2020 |
01-10-2020 |
100 |
100 |
02-04-2022 |
|
31-07-2023 |
Jainco Enterprises Pvt. Ltd. |
arunachaljainco@gmail.com, jainco.kota@gmail.com |
| 29 |
Completed |
Construction of 2-Laning with hard shoulders of Arrowa-Khupa-Hayuliang section of NH-113 from Ch.68.550 to Ch.91.633 on EPC in Arunachal Pradesh under SARDP-NE (NH(O)-NE)
|
23.08 |
301.06 |
31-08-2020 |
25-10-2020 |
100 |
100 |
27-04-2022 |
|
27-05-2025 |
M. P. (Mahabir Prasad) Agarwala Pvt. Ltd. |
mp.arrowa.khupa@gmail.com |
| 30 |
Completed |
Construction of 2-Laning of Pasighat-Mariyang-Yingkiong road (New NH-513) from Singer River to Sijon River from 19.880km to 43.257km in Arunachal Pradesh under Arunachal Pradesh package of SARDP-NE on EPC basis
|
23.38 |
238.46 |
09-11-2015 |
21-01-2016 |
100 |
100 |
19-01-2019 |
|
07-07-2019 |
Ashoka Buildcon Limited (ABL)-Bhartia Infra Projects Limited(BIPL) (JV) |
Bipl.tinsukia@gmail.com |
| 31 |
Completed |
Construction of 2-lane Hunli-Anini road from Design km 53.500 to km 92.500 (Existing Km 56.320 to Km 97.650) on EPC basis under SARDP-NE (Pkg.-3)
|
39.00 |
516.70 |
12-09-2016 |
16-12-2016 |
100 |
98 |
15-12-2019 |
|
15-09-2024 |
Progressive Construction Limited (PCL) -Eagle Infra India Limited (JV) |
pcl.etalin@gmail.com |
| 32 |
Completed |
Construction of Balance work of 2-Laning of existing Akajan-Likabali- Bame Road on EPC basis from design Km 33.00 to Km 65.810 (Existing km 36.00 to km 71.00) in the state of Arunachal Pradesh under SARDP-NE (Pkg-2)
|
32.81 |
263.40 |
30-06-2021 |
01-09-2021 |
100 |
99 |
03-03-2023 |
|
31-03-2024 |
MVV Satyanaryana |
mvvs.alb2@gmail.com |
| 33 |
Completed |
Construction of Balance work of 2-Lane with P S of Joram – Koloriang Road (NH-713) on EPC basis from Design Km 61.547 to Km 78.724 (Existing Km 70.000 to Km 88.700) in the state of Arunachal Pradesh under SARDP-NE (Pkg-4)
|
17.17 |
294.04 |
11-08-2020 |
01-10-2020 |
100 |
99 |
02-04-2022 |
|
30-09-2024 |
Bhimji Velji Sorathia Construction Pvt. Ltd. |
gm.jkroad@bvscpl.in |
| 34 |
Completed |
2-Laning from Kanubari to Longding Section of NH-52B (New NH215) From km.0.000 to km. 47.213 (DPR Length 47.213 km & Design length 45.600) in Arunachal Pradesh under Arunachal Pradesh package of SARDP-NE on EPC mode
|
45.60 |
522.87 |
31-03-2015 |
02-06-2015 |
100 |
97 |
26-11-2018 |
|
31-03-2021 |
MonteCarlo Ltd. |
kanubari.ap@mclindia.com |
| 35 |
Completed |
2 laning from Pasighat to Pangin section of NH-229 (New NH-13) from km 0 to Km 28 (Existing Km 1013.85 to Km 1041.85) of 28 Km (Section-I) under SARDP-NE in Arunachal Pradesh on EPC Mode
|
26.58 |
299.66 |
31-03-2015 |
27-05-2015 |
100 |
100 |
25-05-2018 |
|
28-12-2018 |
Dineshchandra R. Agarwal Infracon Pvt. Ltd. (DRAIPL) |
punahinda@gmail.com |
| 36 |
Completed |
Construction of 2-Laning with hard shoulders of Hayuliang–Hawai Road on EPC basis from Design Km. 34.000 to Km. 51.825 [Existing Km 26.625 to Km 45.050 (Hayuliang – Hawai Road)] in Arunachal Pradesh under SARDP-NE (Pkg - III)
|
17.82 |
263.31 |
23-03-2017 |
10-11-2017 |
100 |
100 |
09-11-2020 |
|
27-06-2023 |
Sushee Infra & Mining Limited |
susheehayuliang@gmail.com |
| 37 |
Awarded, not Appointed |
lmprovement and Widening to 2-lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length: 24.819 Km) in the state of Arunachal Pradesh on EPC mode (Pkg-1) |
24.82 |
441.41 |
31-03-2025 |
|
|
|
|
|
|
TTC lnfra lndia-M/s Lopon Enterprises (JV) |
info@ttcinfraindia.com |
| 38 |
Completed |
Construction of 2-lane road from design km. 21.50 (Near Ithun Bridge) to Km. 37.500 (existing Km 21.450 to Km 40.160) of Hunli-Anini road in the State of Arunachal Pradeshon EPC basis under SARDP-NE (Pkg.-1)
|
16.00 |
318.80 |
06-05-2016 |
21-12-2016 |
100 |
98 |
20-12-2019 |
|
15-10-2022 |
Madhucon Projects Limited |
gm.bd@madhucon.com |
| 39 |
Completed |
Construction of 2-lane of Hunli-Anini road from Existing km. 120.000 to Km. 130.300 on EPC basis under SARDP-NE (Pkg-6)
|
10.30 |
145.17 |
16-03-2018 |
15-06-2018 |
100 |
100 |
14-06-2021 |
|
30-07-2022 |
TTC Infra India |
ttc.hapkg6@gmail.com |
| 40 |
Completed |
Construction of 2-Lane with Paved shoulder of Joram – Koloriang Road (NH-713) from design Km. 32+050 to Km. 44+000 [Existing Km 35.150 to Km 50.050] in Arunachal Pradesh on EPC Mode under SARDP-NE (Pkg-2)
|
11.95 |
176.22 |
24-03-2017 |
22-04-2020 |
100 |
98 |
20-04-2022 |
|
09-04-2022 |
T.K. Engineering Consortium Pvt. Ltd. (TKECPL)-Brand Eagles(BE) (JV) |
debajitdz501@gmail.com |
| 41 |
Completed |
2-Laning from Changlang/Tirap District Boundary to Changlang of NH-52B (New NH-215) from design km 0.00 to km 18.266 (length 18.266 km) in Arunachal Pradesh under Arunachal Pradesh package of SARDP-NE on EPC mode
|
18.27 |
172.75 |
31-03-2015 |
01-06-2015 |
100 |
97 |
31-05-2018 |
|
14-04-2021 |
T.K. Engineering Consortium Pvt. Ltd. (TKECPL) |
tkeconltd@gmail.com, debajitdz501@gmail.com |
| 42 |
Completed |
2-Laning with hard shoulders of Khupa-Hayuliang-Hawai Road NH-113 on EPC basis from design Km. 0.000 (Khupa) to Km. 17.000 [Existing Km 95.800 of (Khupa – Hayuliang Road) to Km 8.970 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh under SARDP-NE (Pkg-I)
|
17.00 |
252.05 |
23-03-2017 |
10-11-2017 |
100 |
100 |
09-11-2020 |
|
19-10-2022 |
Sushee Infra & Mining Limited |
susheehayuliang@gmail.com, puttakishore333@gmail.com |
| 43 |
Completed |
2-Laning with paved shoulder of NH-52 (New NH-13) from km 583.450 to km 605.600 (Existing chainage from km 583.450 to km 595.000) from Pasighat to Bomjur Road including Re-alignment from km 591.900 to km 602.600 in Arunachal Pradesh under Arunachal Pradesh package of SARDP-NE on EPC Mode
|
22.15 |
244.82 |
02-03-2016 |
24-02-2017 |
100 |
99 |
23-02-2020 |
|
10-08-2020 |
Bhartia Infra Projects Limited(BIPL) -Ashoka Buildcon Limited (ABL) (JV ) |
Bipl.tinsukia@gmail.com |